, Lower bounds derived from job splitting procedure, p.61
, , p.61
, Greedy heuristics tests performance
,
, Diversification. Input: J, vol.20
, Solve the MILP to construct the largest possible blocks (ideally, perfect blocks of length T i ) on the machine with smallest T i
,
, However, this is done only from the point of insertion of a new job to the end of the schedule, since nothing changes before the insertion point
Résumé des travaux de recherche menés dans le cadre d'ELSAT 2020, where T S is either M ultT S or ConsT S and the improvement is calculated either with regard to objective f 1 or f 2 , depending on the context. Posters and other communications, vol.2, 2017. ,
Optimisation et simulation pour l'ordonnancement et la maintenance dans un environnement incertain, 2016. ,
Traffic Operations Asset Management Systems (TOAMS): Study findings, 2008. ,
Multiobjective constrained mpc with simultaneous closed-loop identification, International Journal of Adaptive Control and Signal Processing, vol.20, issue.4, pp.145-173, 2006. ,
Scheduling with job-rejection and position-dependent processing times on proportionate flowshops, Optimization Letters, vol.11, issue.4, pp.885-892, 2017. ,
The third comprehensive survey on scheduling problems with setup times/costs, European Journal of Operational Research, vol.246, issue.2, pp.345-378, 2015. ,
A review of scheduling research involving setup considerations, In Omega -The International Journal of Management Science, pp.219-239, 1999. ,
A single machine scheduling problem with availability constraints and sequence-dependent setup costs, Applied Mathematical Modelling, vol.35, issue.4, pp.2041-2050, 2011. ,
A multi-model approach for production planning and scheduling in an industrial environment, chapter 19, ISBN 9781441981905, Kluwer International Series in Operations Research & Management Science, vol.152, pp.489-530, 2011. ,
Some aspects of measuring maintenance performance in the process industry, Journal of Quality in Maintenance Engineering, vol.4, issue.1, pp.6-11, 1998. ,
A tabu search algorithm for order acceptance and scheduling, Computers & Operations Research, vol.39, issue.6, pp.1197-1205, 2012. ,
Handbook of simulation: principles, methodology, advances, applications, and practice, 1998. ,
, Gestion de production et ressources humaines. Méthodes de planification dans les systèmes productifs. Presses internationales Polytechnique, Montréal. ISBN 9782553011450, 2005.
Theory Of Modeling and Simulation, 1976. ,
Branch-and-price: Column generation for solving huge integer programs, Operations research, vol.46, issue.3, pp.316-329, 1998. ,
Dynamic scheduling of parallel heat treatment furnaces: A case study at a manufacturing system, Journal of manufacturing systems, vol.46, pp.152-162, 2018. ,
Dynamic programming, Science, vol.153, issue.3731, pp.34-37, 1966. ,
The theory of dynamic programming, Bulletin of the American Mathematical Society, vol.60, issue.6, pp.503-515, 1954. ,
Scheduling with release dates on a single machine to minimize total weighted completion time, Discrete applied mathematics, vol.36, issue.3, pp.213-231, 1992. ,
Handbook of Maintenance Management and Engineering, vol.9781848824713, 2009. ,
Minimizing the weighted sum of maximum earliness and maximum tardiness costs on a single machine with periodic preventive maintenance, Computers & Operations Research, vol.47, pp.106-113, 2014. ,
Simulation-based approach to joint production and preventive maintenance scheduling on a failure-prone machine, Journal of Quality in Maintenance Engineering, vol.17, issue.3, pp.254-267, 2011. ,
Scheduling of production and maintenance activities under reliability constraint, 9th International Conference on Modeling, Optimization & SIMulation, 2012. ,
URL : https://hal.archives-ouvertes.fr/hal-00728650
Multicriteria scheduling -Theory, Models and Algorithms, vol.9783540282303, 2002. ,
URL : https://hal.archives-ouvertes.fr/hal-01067335
Flexibilité et robustesse en ordonnancement, Hermes Science, vol.2746210282, 2005. ,
Contribution of simulation to the optimization of maintenance strategies for a randomly failing production system, European Journal of Operational Research, vol.197, pp.1142-1149, 2009. ,
URL : https://hal.archives-ouvertes.fr/inria-00598510
Introduction to the Theory of Complexity, 1994. ,
Improved approximation for non-preemptive single machine flow-time scheduling with an availability constraint, European Journal of Operational Research, vol.183, issue.2, pp.516-524, 2007. ,
Branch-and-bound applications in combinatorial data analysis, 2006. ,
On several scheduling problems with rejection or discretely compressible processing times. Theory and Applications of Models of Computation, pp.90-98, 2006. ,
Problèmes d'ordonnancement, modélisation, complexité, algorithmes. Masson, vol.2225812756, 1988. ,
Order acceptance and scheduling decisions in make-to-order systems, International Journal of Production Economics, vol.125, issue.1, pp.200-211, 2010. ,
Profile-driven instruction level parallel scheduling with application to super blocks, Microarchitecture, 1996. MICRO-29. Proceedings of the 29th Annual IEEE/ACM International Symposium on, pp.58-67, 1996. ,
Scheduling with dependent setups and maintenance in a textile company, Computers & Industrial Engineering, vol.57, issue.3, pp.867-873, 2009. ,
Minimizing total flow time in the single-machine scheduling problem with periodic maintenance, Journal of the Operational Research Society, vol.57, issue.4, pp.410-415, 2006. ,
An efficient algorithm for scheduling jobs on a machine with periodic maintenance, The International Journal of Advanced Manufacturing Technology, vol.34, pp.1173-1182, 2007. ,
Single machine scheduling with semi-resumable machine availability constraints, Applied Mathematics-A Journal of Chinese Universities, vol.26, issue.2, pp.177-186, 2011. ,
Solving parallel machine scheduling problems by column generation, INFORMS Journal on Computing, vol.11, issue.1, pp.78-94, 1999. ,
A state of the art review of parallel machine scheduling research, European Journal of Operational Research, vol.47, issue.3, pp.271-292, 1990. ,
Scheduling theory and its applications, Z, 1995. ,
, Optimisation multiobjectif. Algorithmes: Eyrolles. Eyrolles. ISBN 9782212111682, 2002.
Introduction to algorithms, 2009. ,
Column generation, 2005. ,
A primer in column generation, Column generation, pp.1-32, 2005. ,
Ant colony optimization: a new meta-heuristic, Proceedings of the 1999 congress on evolutionary computation, vol.2, pp.1470-1477, 1999. ,
Contributions au couplage de l'optimisation et de la simulation, LAMIH UMR CNRS, vol.8201, 2015. ,
A dynamic genetic algorithm for solving a single machine scheduling problem with periodic maintenance, ISRN Industrial Engineering, 2013. ,
Multicriteria optimization, vol.491, 2005. ,
A lagrangian relaxation algorithm for order acceptance and scheduling problem: a globalised robust optimisation approach, International Journal of Computer Integrated Manufacturing, vol.29, issue.5, pp.535-560, 2016. ,
Techniques for scheduling with rejection, Journal of Algorithms, vol.49, issue.1, pp.175-191, 2003. ,
L'ordonnancement, Economica, vol.2717837981, 1999. ,
Computers and Intractability; A Guide to the theory of NPCompleteness, vol.0716710455, 1979. ,
Parallel tabu search for real-time vehicle routing and dispatching, Transportation science, vol.33, issue.4, pp.381-390, 1999. ,
A tabu search heuristic for the vehicle routing problem, Management science, vol.40, issue.10, pp.1276-1290, 1994. ,
Handbook of metaheuristics, vol.2, 2010. ,
Future paths for integer programming and links to artificial intelligence, Computers & operations research, vol.13, issue.5, pp.533-549, 1986. ,
Tabu search?part i, ORSA Journal on computing, vol.1, issue.3, pp.190-206, 1989. ,
Handbook of metaheuristics, vol.57, 2006. ,
Les problèmes d'ordonnancement. RAIRO Recherche Opérationnelle/Operations Research, vol.27, pp.77-150, 1993. ,
Optimization and approximation in deterministic sequencing and scheduling: a survey, Annals of discrete mathematics, vol.5, pp.287-326, 1979. ,
Scheduling jobs in an alcan aluminium foundry using a genetic algorithm, International Journal of Production Research, vol.38, issue.13, pp.3031-3041, 2000. ,
A general variable neighborhood search for single-machine total tardiness scheduling problem with step-deteriorating jobs, 2013. ,
Parallel machine scheduling with job synchronization to enable efficient material flows in hub terminals, 2018. ,
A new heuristic algorithm for the one-dimensional bin-packing problem, Production Planning & Control, vol.10, issue.3, pp.598-603, 1999. ,
Variable neighborhood search for weighted maximum satisfiability problem, p.62, 2000. ,
Variable neighborhood search, Handbook of metaheuristics, pp.61-86, 2010. ,
URL : https://hal.archives-ouvertes.fr/hal-01017978
Variable neighbourhood search: methods and applications, Annals of Operations Research, vol.175, issue.1, pp.367-407, 2010. ,
Variable neighborhood decomposition search, Journal of Heuristics, vol.7, issue.4, pp.335-350, 2001. ,
Scheduling two parallel machines with machine-dependent availabilities, Computers & Operations Research, vol.72, pp.31-42, 2016. ,
An effective implementation of K-opt moves for the Lin-Kernighan TSP heuristic, 2006. ,
Adaptation in natural and artificial systems: an introductory analysis with applications to biology, control, and artificial intelligence, 1992. ,
A single-machine scheduling problem with maintenance activities to minimize makespan, Applied Mathematics and Computation, vol.215, issue.11, pp.3929-3935, 2010. ,
A general variable neighborhood search for solving the uncapacitated single allocation p-hub median problem, European Journal of Operational Research, vol.206, issue.2, pp.289-300, 2010. ,
Multistart tabu search and diversification strategies for the quadratic assignment problem, IEEE TRANSACTIONS ON SYSTEMS, Man, And Cybernetics, vol.39, issue.3, pp.579-596, 2009. ,
Métaheuristiques pour l'ordonnancement monocritère des ateliers de production, vol.9782746289260, 2013. ,
Single machine scheduling with periodic maintenance to minimize makespan, Computers & operations research, vol.34, issue.6, pp.1764-1770, 2007. ,
Order acceptance and scheduling with batch delivery, Computers & Industrial Engineering, vol.107, pp.100-104, 2017. ,
The np-completeness column: an ongoing guide, Journal of Algorithms, vol.6, issue.3, pp.434-451, 1985. ,
A survey of parallel machine scheduling under availability constraints, International Journal of Computer and Information Technology, vol.3, issue.2, pp.238-245, 2014. ,
Approximation algorithm for the weighted flow-time minimization on a single machine with a fixed non-availability interval, Computers & Industrial Engineering, vol.54, issue.3, pp.401-410, 2008. ,
Approximation algorithms for the makespan minimization with positive tails on a single machine with a fixed non-availability interval, Journal of Combinatorial Optimization, vol.17, issue.2, pp.117-133, 2009. ,
Minimizing the weighted flow time on a single machine with the resumable availability constraint: worst case of the wspt heuristic, International Journal of Computer Integrated Manufacturing, vol.21, issue.4, pp.388-395, 2008. ,
Worst-case analysis of the wspt and mwspt rules for single machine scheduling with one planned setup period, European Journal of Operational Research, vol.187, issue.3, pp.1080-1089, 2008. ,
Single machine scheduling with an availability constraint to minimize the weighted sum of the completion times, Computers & operations research, vol.35, issue.3, pp.827-844, 2008. ,
Fully polynomial time approximation scheme for the weighted flow-time minimization on a single machine with a fixed non-availability interval, Computers & Industrial Engineering, vol.56, issue.4, pp.1708-1712, 2009. ,
Weighted completion time minimization on a single machine with a fixed non-availability interval: Differential approximability, Discrete Optimization, vol.10, issue.1, pp.61-68, 2013. ,
URL : https://hal.archives-ouvertes.fr/hal-00875644
Reactive tabu search for job-shop scheduling problems, Computer Science & Education (ICCSE), pp.97-102, 2016. ,
Designing model predictive controllers with prioritised constraints and objectives, Proceedings. 2002 IEEE International Symposium on, pp.33-38, 2002. ,
Optimization by simulated annealing. science, vol.220, pp.671-680, 1983. ,
A variable neighborhood search for minimizing total weighted tardiness with sequence dependent setup times on a single machine, Computers & Operations Research, vol.39, issue.7, pp.1506-1520, 2012. ,
Sur la numération factorielle, application aux permutations, Bulletin de la Société Mathématique de France, vol.16, pp.176-183, 1888. ,
Machine scheduling with an availability constraint, Journal of global optimization, vol.9, issue.3-4, pp.395-416, 1996. ,
Single machine flowtime scheduling with scheduled maintenance, Acta Informatica, vol.29, issue.4, pp.375-382, 1992. ,
Minimizing the number of tardy jobs in a single-machine scheduling problem with periodic maintenance, Computers & Operations Research, vol.39, issue.9, pp.2196-2205, 2012. ,
Branch and bound synthesis of integrated process designs, Industrial & Engineering Chemistry Fundamentals, vol.9, issue.1, pp.48-58, 1970. ,
Scheduling jobs on parallel machines with sequence-dependent setup times, European Journal of Operational Research, vol.100, issue.3, pp.464-474, 1997. ,
Teaching combinatorial tricks to a computer, Proc. Sympos, vol.10, pp.179-193, 1960. ,
A generalized variable neighborhood search heuristic for the capacitated vehicle routing problem with stochastic service times, TOP, vol.20, issue.1, pp.99-118, 2012. ,
Approximation algorithms for scheduling unrelated parallel machines. Mathematical programming, vol.46, pp.259-271, 1990. ,
Approximation algorithms for minimizing average weighted completion time, Handbook of Scheduling, pp.220-249, 2004. ,
Parallel machine scheduling with machine-dependent maintenance periodic recycles, International Journal of Production Economics, vol.186, pp.1-7, 2017. ,
Scheduling with rejection and a deteriorating maintenance activity on a single machine, Asia-Pacific Journal of Operational Research, vol.34, issue.02, p.1750010, 2017. ,
Single machine scheduling with periodic maintenance and nonresumable jobs, Computers & Operations Research, vol.30, issue.9, pp.1335-1347, 2003. ,
Computer solutions of the traveling salesman problem, The Bell System Technical Journal, vol.44, issue.10, pp.2245-2269, 1965. ,
A modified particle swarm optimization algorithm for a singlemachine scheduling problem with periodic maintenance, Expert Systems with Applications, vol.37, issue.9, pp.6429-6434, 2010. ,
Modelling of integrated vehicle scheduling and container storage problems in unloading process at an automated container terminal, Computers & Industrial Engineering, vol.94, pp.32-44, 2016. ,
Online scheduling with rejection to minimize the total weighted completion time plus the total rejection cost on parallel machines, Journal of the Operations Research Society of China, vol.4, issue.1, pp.111-119, 2016. ,
A survey of scheduling with deterministic machine availability constraints, Computers & Industrial Engineering, vol.58, issue.2, pp.199-211, 2010. ,
Advanced multi-start methods, Handbook of metaheuristics, pp.265-281, 2010. ,
A Metaheuristic Based on Tabu Search for Solving a Technician Routing and Scheduling Problem. CIRRELT, Centre interuniversitaire de recherche sur les réseaux d'entreprise, 2018. ,
Maintenance policies for stochastically failing equipment: a survey. Management science, vol.11, pp.493-524, 1965. ,
Sequential variable neighborhood descent variants: an empirical study on the traveling salesman problem, ITOR, vol.24, issue.3, pp.615-633, 2017. ,
A variable neighborhood algorithm: A new metaheuristic for combinatorial optimization, Optimization Days, vol.12, 1995. ,
Variable neighborhood search, Computers & operations research, vol.24, issue.11, pp.1097-1100, 1997. ,
Single machine scheduling with rejection: Minimizing total weighted completion time and rejection cost, International Journal of Applied Evolutionary Computation (IJAEC), vol.3, issue.2, pp.42-61, 2012. ,
Introduction to the special issue on variable neighborhood search, Journal of Heuristics, vol.14, issue.5, p.403, 2008. ,
Scheduling sequence-dependent setup time job shops with preventive maintenance, The International Journal of Advanced Manufacturing Technology, vol.43, issue.1-2, pp.170-181, 2009. ,
Exact solution of the single-machine scheduling problem with periodic maintenances and sequence-dependent setup times, European Journal of Operational Research, 2017. ,
Exact algorithms for a generalization of the order acceptance and scheduling problem in a single-machine environment, Computers & Operations Research, vol.38, issue.1, pp.367-378, 2011. ,
Objective prioritization using lexicographic minimizers for mpc of sewer networks, IEEE Transactions on Control Systems Technology, vol.16, issue.1, pp.113-121, 2008. ,
Order acceptance and scheduling with consideration of service level, Annals of Operations Research, vol.248, issue.1-2, pp.429-447, 2017. ,
An improved heuristic for parallel machine scheduling with rejection, European Journal of Operational Research, vol.241, issue.3, pp.653-661, 2015. ,
Combinatorial optimization: algorithms and complexity, 1998. ,
Scheduling integrated circuit assembly operations on die bonder, IEEE Transactions on electronics packaging manufacturing, vol.30, issue.2, pp.97-105, 2007. ,
A survey of maintenance models: the control and surveillance of deteriorating systems, Naval Research Logistics Quarterly, vol.23, issue.3, pp.353-388, 1976. ,
Scheduling -Theory, Algorithms, and Systems, vol.0137067577, 1995. ,
Operations Scheduling with applications in manufacturing and services, p.72897791, 1999. ,
Scheduling: theory, algorithms, and systems, 2016. ,
Minimizing weighted completion times with deadlines, Operations Research, vol.33, issue.3, pp.562-574, 1985. ,
A branch and bound algorithm for the total weighted tardiness problem, Operations research, vol.33, issue.2, pp.363-377, 1985. ,
Decision support system for offers of fleet availability services, Proceedings of the Ninth Intl. Conference on Systems ICONS'14, pp.150-153, 2014. ,
Lexicographic optimisation for optimal departure aircraft trajectories, Aerospace Science and Technology, vol.14, issue.1, pp.26-37, 2010. ,
, Cryptographic Hardware and Embedded Systems, vol.7428, 2012.
Scheduling the maintenance on a single machine, Journal of the Operational Research Society, pp.1071-1078, 1999. ,
Scheduling jobs with maintenance subject to load-dependent duration on a single machine, 2015. ,
Modern Heuristic Techniques for Combinatorial Problems, 1993. ,
Metaheuristics for a job scheduling problem with smoothing costs relevant for the car industry, Networks, vol.67, issue.3, pp.246-261, 2016. ,
Joint production and major maintenance planning policy of a manufacturing system with deteriorating quality, International Journal of Production Economics, vol.146, issue.2, pp.575-587, 2013. ,
Algorithms for parallel machine scheduling: a case study of the tracking and data relay satellite system, Journal of the Operational Research Society, vol.54, issue.8, pp.806-821, 2003. ,
Optimization of preventive maintenance through a combined maintenance-production simulation model, Proceedings of the International Conference on Industrial Engineering and Systems Management (IESM?09), vol.9782960053227, 2009. ,
Optimization of preventive maintenance through a combined maintenance-production simulation model, International journal of production economics, vol.143, issue.1, pp.3-12, 2013. ,
Considering scheduling and preventive maintenance in the flowshop sequencing problem, Computers & Operations Research, vol.34, issue.11, pp.3314-3330, 2007. ,
Lower bounds for total weighted completion scheduling problem with availability constraints, Computers & Industrial Engineering, pp.159-163, 2009. ,
A dynamic programming algorithm for the single machine total completion time scheduling problem with availability constraints, Eighth international workshop on project management and scheduling, 2002. ,
An improved approximation algorithm for the single machine total completion time scheduling problem with availability constraints, European journal of operational research, vol.161, issue.1, pp.3-10, 2005. ,
URL : https://hal.archives-ouvertes.fr/hal-00239327
Scheduling with limited machine availability, European Journal of Operational Research, vol.121, issue.1, pp.1-15, 2000. ,
Deterministic global optimization: geometric branch-and-bound methods and their applications, vol.63, 2011. ,
Scheduling to minimize total weighted completion time: Performance guarantees of lpbased heuristics and lower bounds, International Conference on Integer Programming and Combinatorial Optimization, pp.301-315, 1996. ,
A survey on offline scheduling with rejection, Journal of Scheduling, vol.16, issue.1, pp.3-28, 2013. ,
A bicriteria approach to scheduling a single machine with job rejection and positional penalties, Journal of Combinatorial Optimization, vol.23, issue.4, pp.395-424, 2012. ,
Improved approximation algorithms for shop scheduling problems, SIAM Journal of Computing, vol.23, pp.617-632, 1994. ,
Linear and integer optimization: theory and practice, 2015. ,
Maintenance planning and control of hand tools unit in india: a case study, International Journal of Indian Culture and Business Management, vol.7, issue.1, pp.109-132, 2013. ,
Order acceptance and scheduling: A taxonomy and review, European Journal of Operational Research, vol.212, issue.1, pp.1-11, 2011. ,
Order acceptance with weighted tardiness, Computers & Operations Research, vol.34, issue.10, pp.3029-3042, 2007. ,
Various optimizers for single stage production, Naval Research Logistics Quarterly, vol.3, issue.1-2, pp.59-66, 1956. ,
The car sequencing problem: Overview of state-of-the-art methods and industrial case-study of the roadef?2005 challenge problem, European Journal of Operational Research, vol.191, issue.3, pp.912-927, 2008. ,
URL : https://hal.archives-ouvertes.fr/hal-00124828
British standard glossary of maintenance management terms in terotechnology, 1984. ,
Scheduling problems with multiple maintenance activities and non-preemptive jobs on two identical parallel machines, International Journal of Production Economics, vol.124, issue.1, pp.151-158, 2010. ,
Metaheuristics: From Design to Implementation, 2009. ,
URL : https://hal.archives-ouvertes.fr/hal-00750681
Makespan minimisation for a parallel machine scheduling problem with preemption and job incompatibility, International Journal of Production Research, vol.55, issue.6, pp.1588-1606, 2017. ,
Metaheuristics for a scheduling problem with rejection and tardiness penalties, Journal of Scheduling, vol.18, issue.1, pp.89-105, 2015. ,
Order acceptance and scheduling with earliness and tardiness penalties, Journal of Heuristics, vol.22, issue.6, pp.849-890, 2016. ,
Multicriteria scheduling problems: a survey. RAIRO-Operations Research, vol.35, pp.143-163, 2001. ,
Multicriteria scheduling: theory, models and algorithms, 2006. ,
Contributions théoriques et pratiques pour la recherche dispersée, rechercheà voisinage variable et matheuristique pour les programmes en nombres entiers mixtes, 2015. ,
Nested general variable neighborhood search for the periodic maintenance problem, European Journal of Operational Research, vol.252, issue.2, pp.385-396, 2016. ,
Contrôle autonome d'opérateurs pour la recherche locale, 2012. ,
An introduction to Kolmogorov complexity and its applications, vol.34, 1997. ,
Critical machine based scheduling-a review, IOP Conference Series: Materials Science and Engineering, vol.183, pp.1-7, 2017. ,
Preemptive scheduling with availability constraints to minimize total weighted completion times, Annals of Operations Research, vol.133, issue.1-4, pp.183-192, 2005. ,
A survey of maintenance policies of deteriorating systems, European Journal of Operational Research, vol.139, pp.469-489, 2002. ,
Order acceptance and scheduling on two identical parallel machines, Journal of the Operational Research Society, vol.66, issue.10, pp.1755-1767, 2015. ,
The design of approximation algorithms, 2011. ,
Order acceptance and scheduling in a two-machine flowshop, International Journal of Production Economics, vol.141, issue.1, pp.366-376, 2013. ,
Makespan minimization for two parallel machines scheduling with a periodic availability constraint: mathematical programming model, average-case analysis, and anomalies, Applied Mathematical Modelling, vol.37, issue.14, pp.7561-7567, 2013. ,
Minimizing total completion time on a single machine with a flexible maintenance activity, Computers & Operations Research, vol.38, issue.4, pp.755-770, 2011. ,
A variable neighborhood search based genetic algorithm for flexible job shop scheduling problem, Cluster Computing, pp.1-12, 2018. ,
Scheduling with rejection to minimize the total weighted completion time, International Symposium on Operations Research and Its Applications, vol.9, pp.111-114, 2009. ,
Parallel machine scheduling with restricted job rejection, Theoretical Computer Science, 2017. ,
Order acceptance and scheduling with machine availability constraints, European journal of operational research, vol.232, issue.3, pp.435-441, 2014. ,
Scheduling with release times and rejection on two parallel machines, Journal of Combinatorial Optimization, vol.33, issue.3, pp.934-944, 2017. ,
A generalized consistent neighborhood search for satellite range scheduling problems. RAIRO-Operations Research, vol.49, pp.99-121, 2015. ,
URL : https://hal.archives-ouvertes.fr/hal-01936567
A lexicographic optimization algorithm. Automation and Remote Control, vol.65, pp.363-368, 2004. ,