D. Alcaide, C. Chu, V. Kats, E. Levner, and G. Sierksma, Cyclic multiple-robot scheduling with time-window constraints using a critical path approach, European Journal of Operational Research, vol.177, issue.1, pp.147-162, 2007.

R. Armstrong, S. Gu, and L. Lei, A greedy algorithm to determine the number of transporters in a cyclic electroplating process, IIE Transactions, vol.28, issue.5, pp.347-355, 1996.

R. Armstrong, L. Lei, and S. Gu, A bounding scheme for deriving the minimal cycle time of a single-transporter N-stage process with time-window constraints, European Journal of Operational Research, vol.78, issue.1, pp.130-140, 1994.

P. Baptiste, B. Legeard, M. Manier, and C. Varnier, Optimization with constraint logic programming: the hoist scheduling problem solved with various solvers. Application of Artificial Intelligence in Engineering, vol.2, pp.599-614, 1993.

C. Bloch, M. Manier, P. Baptiste, and C. Varnier, Hoist scheduling problem, book: Production Scheduling, Control Systems, Robotics and Manufacturing Series, pp.193-231, 2008.
URL : https://hal.archives-ouvertes.fr/hal-00277627

F. Chauvet, E. Levner, L. K. Meyzin, and J. Proth, On-line scheduling in a surface treatment system, European Journal of Operational Research, vol.120, issue.2, pp.382-392, 2000.
URL : https://hal.archives-ouvertes.fr/inria-00073371

A. Che and C. Chu, Single-track multi-hoist scheduling problem: a collision-free resolution based on a branch-and-bound approach, International Journal of Production Research, vol.42, issue.12, pp.2435-2456, 2004.

A. Che and C. Chu, Cyclic hoist scheduling in large real-life electroplating lines, OR Spectrum, vol.29, issue.3, pp.445-470, 2007.

A. Che, W. Lei, J. Feng, and C. Chu, An improved mixed integer programming approach for multi-hoist cyclic scheduling problem, IEEE Transactions on Automation Science and Engineering, vol.11, issue.1, pp.302-309, 2014.
URL : https://hal.archives-ouvertes.fr/hal-01786657

A. Che, Z. Zhou, C. Chu, and H. Chen, Multi-degree cyclic hoist scheduling with time window constraints, International Journal of Production Research, vol.49, issue.19, pp.5679-5693, 2011.

H. X. Chen, C. Chu, and J. M. Proth, Cyclic scheduling of a hoist with time window constraints, IEEE Transaction on Robotics and Automation, vol.14, issue.1, pp.144-152, 1998.
URL : https://hal.archives-ouvertes.fr/inria-00074366

S. Chtourou, M. Manier, and T. Loukil, A hybrid algorithm for the cyclic hoist scheduling problem with two transportation resources, Computers & Industrial, p.99, 2013.

. Engineering, , vol.65, pp.426-437

Y. Crama, V. Kats, J. Van-de-klundert, and E. Levner, Cyclic scheduling in robotic flowshops, Annals of Operations Research, vol.96, issue.1-4, pp.97-124, 2000.

K. Deb, Multi-Objective Optimization Using Evolutionary Algorithms, 2001.

K. Deb, A. Pratap, S. Agarwal, and T. Meyarivan, A fast and elitist multiobjective genetic algorithm: NSGA-II, IEEE Transactions on Evolutionary Computation, vol.6, issue.2, pp.182-197, 2002.

R. Dettmer, Chaos and engineering, IEE Review, vol.39, issue.5, pp.199-203, 1993.

D. Deutsch, Quantum theory, the church-turing principle and the universal quantum computer, pp.97-117, 1985.

A. El-amraoui, M. Manier, A. El-moudni, and M. Benrejeb, A mixed linear program for a multi-part cyclic hoist scheduling problem, International Journal of Science and Techniques of Automatic control & Computer Engineering, vol.11, pp.612-623, 2008.

A. El-amraoui, M. Manier, A. El-moudni, and M. Benrejeb, A linear optimization approach to the heterogeneous r-cyclic hoist scheduling problem, Computers & Industrial Engineering, vol.65, issue.3, pp.360-369, 2013.

A. El-amraoui, M. Manier, A. El-moudni, and M. Benrejeb, A genetic algorithm approach for a single hoist scheduling problem with time windows constraints, Engineering Applications of Artificial Intelligence, vol.26, issue.7, pp.1761-1771, 2013.

H. Fargier and J. Lamothe, Handling soft constraints in hoist scheduling problems: the fuzzy approach, Engineering Applications of Artificial Intelligence, vol.14, issue.3, pp.387-399, 2001.
URL : https://hal.archives-ouvertes.fr/hal-01618010

J. Feng, A. Che, and N. Wang, Bi-objective cyclic scheduling in a robotic cell with processing time windows and non-Euclidean travel times, International Journal of Production Research, vol.52, issue.9, pp.2505-2518, 2014.

G. Fleury, M. Gourgand, and P. Lacomme, Metaheuristics for the stochastic hoist scheduling problem (SHSP), International Journal of Production Research, vol.39, issue.15, pp.3419-3457, 2001.

Y. Ge and Y. Yih, Crane scheduling with time windows in circuit board production lines, International Journal of Production Research, vol.33, issue.5, pp.1187-1199, 1995.

J. Gu, M. Gu, C. Cao, and X. Gu, A novel competitive co-evolutionary quantum genetic algorithm for stochastic job shop scheduling problem, Computers & Operations Research, vol.37, issue.5, pp.927-937, 2010.

J. Gu, X. Gu, and M. Gu, A novel parallel quantum genetic algorithm for 100 stochastic job shop scheduling, Journal of Mathematical Analysis and Applications, vol.35, pp.63-81, 2009.

K. Han and J. Kim, Quantum-inspired evolutionary algorithm for a class of combinatorial optimization, IEEE Transactions on Evolutionary Computation, vol.6, issue.6, pp.580-593, 2002.

K. Han and J. Kim, Quantum-inspired evolutionary algorithms with a new termination criterion, H-gate and two-phase scheme, IEEE Transactions on Evolutionary Computation, vol.8, issue.2, pp.156-169, 2004.

T. Hey, Quantum computing: an introduction, Computing&Control Engineering Journal, vol.10, issue.3, pp.105-112, 1999.

K. Hindi and K. Fleszar, A constraint propagation heuristic for the single-hoist, multiple-products scheduling problem, Computers & Industrial Engineering, vol.47, issue.1, pp.91-101, 2004.

D. Jegou, D. Kim, P. Baptiste, and K. H. Lee, A contract net based intelligent agent system for solving the reactive hoist scheduling problem, Expert Systems with Applications, vol.30, issue.2, pp.156-167, 2006.

Y. Jiang and J. Liu, A new model and an efficient branch and bound solution for cyclic multi-hoist scheduling, IIE Transactions, vol.46, issue.3, pp.249-262, 2014.

V. Kats, An exact optimal cyclic scheduling algorithm for multi-operator service of a production line. Automation and Remote Control, vol.42, pp.538-543, 1982.

V. Kats and E. Levner, Cyclic routing algorithms in graphs: Performance analysis and applications to robot scheduling, Computers & Industrial Engineering, vol.61, issue.2, pp.279-288, 2011.

V. Kats, L. Lei, and E. Levner, Minimizing the cycle time of multiple-product processing networks with a fixed operation sequence, setups, and time-window constraints, European Journal of Operational Research, vol.187, issue.3, pp.1196-1211, 2008.

V. Kats and E. Levner, Parametric algorithms for 2-cyclic robot scheduling with interval processing times, Journal of Scheduling, vol.14, issue.3, pp.267-279, 2011.

V. Kats and E. Levner, A faster algorithm for 2-cyclic robotic scheduling with a fixed robot route and interval processing times, European Journal of Operational Research, vol.209, issue.1, pp.51-56, 2011.

J. H. Kim and T. E. Lee, Schedulability analysis of time-constrained cluster tools with bounded time variation by an extended Petri Net, IEEE Transactions on Automation Science and Engineering, vol.5, issue.3, pp.490-503, 2008.

K. Kujawski and J. ?wi?tek, Electroplating production scheduling by cyclogram unfolding in dynamic hoist scheduling problem, International Journal of Production Research, vol.49, issue.17, pp.5355-5371, 2011.

I. Kuntay, Q. Xu, K. Uygun, and Y. Huang, Environmentally Conscious Hoist Scheduling for Electroplating Facilities, Chemical Engineering Communications, vol.193, issue.3, pp.273-292, 2006.

J. Lamothe, M. Correge, and J. Delmas, A dynamic heuristic for the real-time hoist scheduling problem, Proceedings of 1995 INRIA/IEEE Symposium on Emerging Technologies and Factory Automation (ETFA), vol.2, pp.161-168, 1995.

L. Lei, Determining the optimal starting times in a cyclic schedule with a given route, Computers & Operations Research, vol.20, issue.8, pp.807-816, 1993.

L. Lei and Q. Liu, Optimal cyclic scheduling of a robotic processing line with two-product and time-window constraints, INFOR, vol.39, issue.2, pp.185-199, 2001.

L. Lei and T. J. Wang, The minimum common-cycle algorithm for cyclic scheduling of two material handling hoists with time window constraints, Management Science, vol.37, issue.12, pp.1629-1639, 1991.

L. Lei and T. J. Wang, Determining optimal cyclic hoist schedules in a single-hoist electroplating line, IIE Transactions, vol.26, issue.2, pp.25-33, 1994.

W. Lei, A. Che, and C. Chu, Optimal cyclic scheduling of a robotic flowshop with multiple part types and flexible processing times, European Journal of Industrial Engineering, vol.8, issue.2, pp.143-167, 2014.
URL : https://hal.archives-ouvertes.fr/hal-01786662

W. Lei, A. Che, H. Manier, and M. Manier, Quantum-inspired evolutionary algorithm for bi-objective scheduling in an automated electroplating line, 7th International Conference on Information Management, Innovation Management and Industrial Engineering (ICIII), vol.2, pp.157-160, 2014.

W. Lei, H. Manier, and M. Manier, A quantum-inspired evolutionary for the cyclic hoist scheduling problem. Quatorzième Congrès de la Société Française de Recherche Opérationnelle et d'Aide à la Décision (ROADEF'13), 2013.

W. Lei, H. Manier, M. Manier, and A. Che, A hybrid quantum evolutionary algorithm with improved decoding scheme for a robotic flowshop scheduling problem, Applied soft computing, 2014.

J. Leung and G. Q. Zhang, Optimal cyclic scheduling for printed circuit board production lines with multiple hoists and general processing sequence, IEEE Transactions on Robotics and Automation, vol.19, issue.3, pp.480-484, 2003.

J. M. Leung, G. Q. Zhang, X. G. Yang, R. Mak, and K. Lam, Optimal cyclic multi-hoist scheduling: a mixed integer programming approach, Operations Research, vol.52, issue.6, pp.965-976, 2004.

E. Levner, V. Kats, and D. A. De-pablo, Cyclic scheduling in robotic cells: An extension of basic models in machine scheduling theory, Multiprocessor Scheduling: Theory and Applications, p.102, 2007.

. Austria, , pp.1-20

E. Levner, V. Kats, D. A. De-pablo, and T. C. Cheng, Complexity of cyclic scheduling problems: A state-of-the-art survey, Computers & Industrial Engineering, vol.59, issue.2, pp.352-361, 2010.

E. Levner, V. Kats, and V. Levit, An improved algorithm for cyclic flowshop scheduling in a robotic cell, European Journal of Operational Research, vol.97, issue.3, pp.500-508, 1997.

B. Li and L. Wang, A Hybrid quantum-inspired genetic algorithm for multiobjective flow shop scheduling, IEEE Transactions on Systems, Man, and Cybernetics, vol.37, issue.3, pp.576-591, 2007.

P. Li and S. Li, Quantum-inspired evolutionary algorithm for continuous spaces optimization based on Bloch coordinates of qubits, Neurocomputing, vol.72, issue.1-3, pp.581-591, 2008.

X. Li and R. Y. Fung, A mixed integer linear programming solution for single hoist multi-degree cyclic scheduling with reentrance. Engineering Optimization, vol.46, pp.704-723, 2014.

M. Lim, A genetic algorithm for a single hoist scheduling in the printed-circuit-board electroplating line, Computers & Industrial Engineering, vol.33, issue.3?4, pp.789-792, 1997.

J. Y. Liu, Y. Jiang, and Z. L. Zhou, Cyclic scheduling of a single hoist in extended electroplating lines: a comprehensive integer programming solution, IIE Transactions, vol.34, issue.10, pp.905-914, 2002.

E. M. Livshits, Z. N. Mikhailetsky, and E. V. Chervyakov, A scheduling problem in an automated flow time with an automated operator, Computational Mathematics and Computerized Systems, vol.5, pp.151-155, 1974.

R. W. Mak, S. M. Gupta, and K. Lam, Modeling of material handling hoist operations in a PCB manufacturing facility, Journal of Electronics Manufacturing, vol.11, issue.1, pp.33-50, 2002.

M. Manier and C. Bloch, A classification for hoist scheduling problems, International Journal of Flexible Manufacturing Systems, vol.15, issue.1, pp.37-55, 2003.

M. Manier, Contribution à l'ordonnancement cyclique du système de manutention d'une ligne de galvanoplastie, 1994.

M. Manier and S. Lamrous, An evolutionary approach for the design and scheduling of electroplating facilities, Journal of Mathematical Modelling and Algorithm, vol.7, issue.2, pp.197-215, 2008.

M. Manier, C. Varnier, and P. Baptiste, Constraint-based model for the cyclic multi-hoists scheduling problem, Production Planning & Control, vol.11, issue.3, p.103, 2000.

K. Miettinen, Nonlinear Multiobjective Optimization, 1999.

A. Narayanan and M. Moore, Quantum-inspired genetic algorithms, Proceedings of IEEE International Conference on Evolutionary Computation, pp.61-66, 1996.

J. X. Neto, D. L. De-andrade-bernert, and L. Dos-santos-coelho, Improved quantum-inspired evolutionary algorithm with diversity information applied to economic dispatch problem with prohibited operating zones, Energy Conversion and Management, vol.52, pp.8-14, 2011.

W. C. Ng, Determining the optimal number of duplicated process tanks in a single-hoist circuit board production line, Computers & Industrial Engineering, vol.28, issue.4, pp.681-688, 1995.

W. C. Ng, A Branch and bound algorithm for hoist scheduling of a circuit board production line, International Journal of Flexible Manufacturing Systems, vol.8, issue.1, pp.45-65, 1996.

W. C. Ng and J. Leung, Determining the optimal move times for a given cyclic schedule of a material handling hoist, Computers & Industrial Engineering, vol.32, issue.3, pp.595-606, 1997.

B. Ni, Galvanizing technology, 2010.

Q. Niu, T. Zhou, and S. Ma, A quantum-inspired immune algorithm for hybrid flow shop with makespan criterion, Journal of Universal Computer Science, vol.15, issue.4, pp.765-785, 2009.

H. Paul, C. Bierwirth, and H. Kopfer, A heuristic scheduling procedure for multi-item hoist production lines, International Journal of Production Economics, vol.105, issue.1, pp.54-69, 2007.

L. W. Phillips and P. S. Unger, Mathematical programming solution of a hoist scheduling program, AIIE Transactions, vol.8, issue.2, pp.219-225, 1976.

D. Riera and N. Yorke-smith, An improved hybrid model for the generic hoist scheduling problem, Annals of Operations Research, vol.115, issue.1-4, pp.173-191, 2002.

M. Schleinger and M. Paunovic, Modern electroplating, 2010.

G. W. Shapiro and H. L. Nuttle, Hoist scheduling for a PCB electroplating facility, IIE Transactions, vol.20, issue.2, pp.157-167, 1988.

P. Spacek, M. Manier, and A. El-moudni, Control of an electroplating line in the max and min algebras, International Journal of Systems Science, vol.30, issue.7, pp.759-778, 1999.

C. Subaï, P. Baptiste, and E. Niel, Scheduling Issues for Environmentally 104, 2006.

, Responsible Manufacturing: The Case of Hoist Scheduling in an Electroplating Line, International Journal of Production Economics, vol.99, issue.1-2, pp.74-87

H. Talbi, A. Draa, and M. Batouche, A new quantum-inspired genetic algorithm for solving the travelling salesman problem, IEEE International Conference on Industrial Technology, vol.3, pp.1192-1197, 2004.

N. Tian, A. Che, and J. Feng, Real-time hoist scheduling for multistage material handling process under uncertainties, AIChE Journal, vol.59, issue.4, pp.1046-1048, 2013.

C. Varnier, A. Bachelu, and P. Baptiste, Resolution of the cyclic multi-hoists scheduling problem with overlapping partitions, Information System and Operations Research (INFOR), vol.35, issue.4, pp.309-324, 1997.

Y. Wang and A. Che, Robotic cells scheduling based on hybrid quantum evolutionary algorithm, Computer Integrated Manufacturing Systems, vol.19, issue.9, pp.2193-2201, 2013.

N. Wu and M. Zhou, Modeling, Analysis and control of dual-arm cluster tools with residency time constraint and activity time variation based on Petri Nets, IEEE Transactions on Automation Science and Engineering, vol.9, issue.2, pp.446-454, 2012.

N. Wu and M. Zhou, Schedulability analysis and optimal scheduling of dual-arm cluster tools with residency time constraint and activity time variation, IEEE Transactions on Automation Science and Engineering, vol.9, issue.1, pp.203-209, 2012.

Q. Xu and Y. L. Huang, Graph-assisted cyclic hoist scheduling for environmentally benign electroplating, Industrial and Engineering Chemistry Research, vol.43, issue.26, pp.8307-8316, 2004.

P. Yan, A. Che, X. Cai, and X. Tang, Two-phase branch and bound algorithm for robotic cells rescheduling considering limited disturbance, Computers & Operations Research, vol.50, issue.10, pp.128-140, 2014.

P. Yan, A. Che, N. Yang, and C. Chu, A tabu search algorithm with solution space partition and repairing procedure for cyclic robotic cell scheduling problem, International Journal of Production Research, vol.50, issue.22, pp.6403-6418, 2012.

P. Yan, C. Chu, N. Yang, and A. Che, A branch-and-bound algorithm for optimal cyclic scheduling in a robotic cell with processing time windows, International Journal of Production Research, vol.48, issue.21, pp.6461-6480, 2010.

Y. Yih, An algorithm for hoist scheduling problems, International Journal of Production Research, vol.32, issue.3, pp.501-516, 1994.

Y. Yih, T. Liang, and H. Moskowitz, Robot scheduling in a circuit board production line: a hybrid OR/ANN approach, IIE Transactions, vol.25, issue.2, pp.26-33, 1993.

Q. Zhang, H. Manier, and M. Manier, A genetic algorithm with tabu search procedure for flexible job shop scheduling with transportation constraints and bounded processing times, Computers & Operations Research, vol.39, issue.7, p.105, 2012.

Q. Zhang, H. Manier, and M. Manier, A modified shifting bottleneck heuristic and disjunctive graph for job shop scheduling problems with transportation constraints, International Journal of Production Research, vol.52, issue.4, pp.985-1002, 2014.

R. Zhang and H. Gao, Improved quantum evolutionary algorithm for combinatorial optimization problem, International Conference on Machine Learning and Cybernetics (ICLMC), vol.6, pp.3501-3505, 2007.

C. Zhao, J. Fu, and Q. Xu, Production-ratio oriented optimization for multi-recipe material handling via simultaneous hoist scheduling and production line arrangement, Computers and Chemical Engineering, vol.50, issue.5, pp.28-38, 2013.

C. Zhao, J. Fu, and Q. Xu, Real-time dynamic hoist scheduling for multistage material handling process under uncertainties, AIChE Journal, vol.59, issue.2, pp.465-482, 2013.

Z. Zhao, X. Peng, Y. Peng, and E. Yu, An effective constraint handling method in quantum-inspired evolutionary algorithm for knapsack problems, WSEAS Transactions on Computers, vol.5, issue.6, pp.1194-1199, 2006.

T. Zheng and M. Yamashiro, Solving flow shop scheduling problems by quantum differential evolutionary algorithm, International Journal of Advanced Manufacturing Technology, vol.49, issue.5-8, pp.643-662, 2010.

Z. Zhou, A. Che, and . P. Yan, A mixed integer programming approach for multi-cyclic robotic flowshop scheduling with time window constraints, Applied Mathematical Modelling, vol.36, issue.8, pp.3621-3629, 2012.

Z. Zhou and L. Li, Single hoist cyclic scheduling with multiple tanks: a material handling solution, Computers & Operations Research, vol.30, issue.6, pp.811-819, 2003.

Z. Zhou and L. Li, A Solution for Cyclic Scheduling of multi-hoists without Overlapping, Annals of Operations Research, vol.168, issue.1, pp.5-21, 2009.

Z. Zhou and J. Liu, A heuristic algorithm for the two-hoist cyclic scheduling problem with overlapping hoist ranges, IIE Transactions, vol.40, issue.8, pp.782-794, 2008.