Rescheduling job shops under random disruptions, International Journal of Production Research, vol.35, issue.7, pp.2065-2082, 1997. ,
DOI : 10.1080/002075497195074
A multi objective optimization approach for flexible job shop scheduling problem under random machine breakdown by evolutionary algorithms, Computers & Operations Research, vol.73, pp.56-66, 2016. ,
DOI : 10.1016/j.cor.2016.03.009
Robust Process Planning under Uncertainty, Industrial & Engineering Chemistry Research, vol.37, issue.5, pp.1883-1892, 1998. ,
DOI : 10.1021/ie970694t
Minimizing the number of late jobs on a single machine under due date uncertainty, Journal of Scheduling, vol.29, issue.4, pp.351-360, 2011. ,
DOI : 10.1145/322307.322309
Robust and stable flexible job shop scheduling with random machine breakdowns using a hybrid genetic algorithm, International Journal of Production Economics, vol.132, issue.2, pp.279-291, 2011. ,
DOI : 10.1016/j.ijpe.2011.04.020
Complexity of single machine scheduling problems under scenario-based uncertainty, Operations Research Letters, vol.36, issue.3, pp.338-342, 2008. ,
DOI : 10.1016/j.orl.2007.11.005
URL : https://hal.archives-ouvertes.fr/hal-00115501
Decision Making Under Uncertainty When Preference Information Is Incomplete, Management Science, vol.61, issue.1, pp.111-128, 2015. ,
DOI : 10.1287/mnsc.2014.2059
Robust optimization for resource-constrained project scheduling with uncertain activity durations, Flexible Services and Manufacturing Journal, vol.102, issue.1, pp.175-205, 2013. ,
DOI : 10.1007/s10107-004-0512-0
URL : https://hal.archives-ouvertes.fr/hal-00564435
Maximizing the configuration robustness for parallel multi-purpose machines under setup cost constraints, Journal of Scheduling, vol.158, issue.3, pp.457-471, 2012. ,
DOI : 10.1016/S0377-2217(03)00373-4
URL : https://hal.archives-ouvertes.fr/hal-00654176
The minmax regret permutation flow-shop problem with two jobs, European Journal of Operational Research, vol.169, issue.3, pp.761-766, 2006. ,
DOI : 10.1016/j.ejor.2004.07.073
Executing production schedules in the face of uncertainties: A review and some future directions, European Journal of Operational Research, vol.161, issue.1, pp.86-110, 2005. ,
DOI : 10.1016/j.ejor.2003.08.027
, BIBLIOGRAPHY
Executing production schedules in the face of uncertainties: A review and some future directions, European Journal of Operational Research, vol.161, issue.1, pp.86-110, 2005. ,
DOI : 10.1016/j.ejor.2003.08.027
Uncertainty modeling and analysis in engineering and the sciences, 2006. ,
DOI : 10.1201/9781420011456
Parallel-machine rescheduling with machine disruptions, IIE Transactions, vol.37, issue.12, pp.1113-1118, 2005. ,
DOI : 10.1016/0305-0548(93)90091-V
Resource-constrained project scheduling for timely project completion with stochastic activity durations, pp.459-474, 2009. ,
Tractable stochastic analysis in high dimensions via robust optimization, Mathematical Programming, vol.62, issue.1, pp.1-48, 2012. ,
DOI : 10.1002/j.1538-7305.1983.tb03204.x
A survey of techniques for scheduling with uncertainty, 2002. ,
Different types of uncertainty Probabilistic Risk Analysis: Foundations and Methods, pp.17-38, 2001. ,
Decision-Making in a Fuzzy Environment, Management Science, vol.17, issue.4, p.141, 1970. ,
DOI : 10.1287/mnsc.17.4.B141
, Robust optimization. Princeton Series in Applied Mathematics, 2009.
Robust Convex Optimization, Mathematics of Operations Research, vol.23, issue.4, pp.769-805, 1998. ,
DOI : 10.1287/moor.23.4.769
Robust solutions of Linear Programming problems contaminated with uncertain data, Mathematical Programming, vol.88, issue.3, pp.411-424, 2000. ,
DOI : 10.1007/PL00011380
A bibliographic review of production line design and balancing under uncertainty, IFAC-PapersOnLine, vol.48, issue.3, pp.70-75, 2015. ,
DOI : 10.1016/j.ifacol.2015.06.060
URL : https://hal.archives-ouvertes.fr/emse-01194461
Constructing Uncertainty Sets for Robust Linear Optimization, Operations Research, vol.57, issue.6, pp.1483-1495, 2009. ,
DOI : 10.1287/opre.1080.0646
Theory and Applications of Robust Optimization, SIAM Review, vol.53, issue.3, pp.464-501, 2011. ,
DOI : 10.1137/080734510
Optimality of Affine Policies in Multistage Robust Optimization, Mathematics of Operations Research, vol.35, issue.2, pp.363-394, 2010. ,
DOI : 10.1287/moor.1100.0444
Robust discrete optimization and network flows, Mathematical Programming, vol.98, issue.1-3, pp.49-71, 2003. ,
DOI : 10.1007/s10107-003-0396-4
The Price of Robustness, Operations Research, vol.52, issue.1, pp.35-53, 2004. ,
DOI : 10.1287/opre.1030.0065
Flexibility and Robustness in Scheduling, 2008. ,
DOI : 10.1002/9780470611432
URL : https://hal.archives-ouvertes.fr/hal-00445442
A variable neighborhood search approach for planning and scheduling of jobs on unrelated parallel machines, Journal of Intelligent Manufacturing, vol.32, issue.6, pp.1621-1635, 2012. ,
DOI : 10.1007/978-1-4615-6329-7
Introduction to stochastic programming, 2011. ,
DOI : 10.1007/978-1-4614-0237-4
Scheduling in computer and manufacturing systems, 2012. ,
Chance-Constrained Programming, Management Science, vol.6, issue.1, pp.73-79, 1959. ,
DOI : 10.1287/mnsc.6.1.73
A state-of-the-art review of parallel-machine scheduling research, European Journal of Operational Research, vol.47, issue.3, pp.271-292, 1990. ,
DOI : 10.1016/0377-2217(90)90215-W
A memetic algorithm for minimizing total weighted tardiness on parallel batch machines with incompatible job families and dynamic job arrival, Computers & Operations Research, vol.37, issue.12, pp.2257-2269, 2010. ,
DOI : 10.1016/j.cor.2010.03.017
Is probability the only coherent approach to uncertainty? Risk Analysis, pp.645-652, 2008. ,
DOI : 10.1111/j.1539-6924.2008.01058.x
A 2-approximation for minmax regret problems via a mid-point scenario optimal solution, Operations Research Letters, vol.38, issue.4, pp.326-327, 2010. ,
DOI : 10.1016/j.orl.2010.03.002
A mip formulation for the minmax regret total completion time in scheduling with unrelated parallel machines. Optimization Letters, pp.1577-1589, 2014. ,
DOI : 10.1007/s11590-013-0655-0
Decision???driven scenarios for assessing four levels of uncertainty, Strategy & Leadership, vol.31, issue.1, pp.14-22, 2003. ,
DOI : 10.1108/10878570310455015
Using real time information for effective dynamic scheduling, European Journal of Operational Research, vol.139, issue.2, pp.230-244, 2002. ,
DOI : 10.1016/S0377-2217(01)00355-1
URL : http://www.brad.ac.uk/library/media/library/documents/bs_deposit_process.pdf
Rescheduling parallel machines with stepwise increasing tardiness and machine assignment stability objectives, International Journal of Production Research, vol.43, issue.15, pp.3231-3246, 2005. ,
DOI : 10.1023/A:1022235519958
Evolutionary algorithm for minmax regret flow-shop problem, Management and Production Engineering Review, vol.6, issue.3, 2015. ,
, BIBLIOGRAPHY
??-Robust scheduling for single-machine systems with uncertain processing times, IIE Transactions, vol.21, issue.11, pp.29-977, 1997. ,
DOI : 10.1287/opre.34.4.560
Robust Scheduling to Hedge Against Processing Time Uncertainty in Single-Stage Production, Management Science, vol.41, issue.2, pp.363-376, 1995. ,
DOI : 10.1287/mnsc.41.2.363
Robust Scheduling to Hedge Against Processing Time Uncertainty in Single-Stage Production, Management Science, vol.41, issue.2, pp.363-376, 1995. ,
DOI : 10.1287/mnsc.41.2.363
Linear Programming under Uncertainty, Management Science, vol.1, issue.3-4, pp.197-206, 1955. ,
DOI : 10.1287/mnsc.1.3-4.197
??-Reliable p-minimax regret: A new model for strategic facility location modeling, Location Science, vol.5, issue.4, pp.227-246, 1997. ,
DOI : 10.1016/S0966-8349(98)00036-9
Slack-based techniques for robust schedules, Sixth European conference on planning, 2014. ,
Why Acquisitions May Not Be the Best Route to Innovation, Journal of Business Strategy, vol.12, issue.3, pp.50-52, 1991. ,
DOI : 10.1108/eb039419
Some misunderstanding on uncertainty in modern classical economics, Uncertainty in Economic Thought, pp.21-37, 1996. ,
A family of inequalities valid for the robust single machine scheduling polyhedron, Computers & Operations Research, vol.37, issue.9, pp.1610-1614, 2010. ,
DOI : 10.1016/j.cor.2009.12.001
La prévision: ses lois logiques, ses sources subjectives, Annales de l'institut Henri Poincaré, 1937. ,
Upper and lower probabilities induced by a multivalued mapping. The annals of mathematical statistics, pp.325-339, 1967. ,
Fundamental uncertainty and ambiguity, Eastern Economic Journal, vol.26, issue.1, pp.41-60, 2000. ,
Uncertainty: A Typology and Refinements of Existing Concepts, Journal of Economic Issues, vol.16, issue.1, pp.621-640, 2011. ,
DOI : 10.1080/13501780802684252
Aleatory or epistemic? does it matter? Structural Safety, pp.105-112, 2009. ,
Scenario based robust line balancing: Computational complexity, Discrete Applied Mathematics, vol.160, issue.13-14, pp.13-14, 2012. ,
DOI : 10.1016/j.dam.2012.04.011
URL : https://hal.archives-ouvertes.fr/emse-00693912
Production rescheduling for machine breakdown at a job shop, International Journal of Production Research, vol.3, issue.3, pp.2681-2691, 2012. ,
DOI : 10.1016/0305-0548(93)90091-V
Substantive and procedural uncertainty, Journal of Evolutionary Economics, vol.9, issue.2, pp.145-168, 1991. ,
DOI : 10.1080/01603477.1986.11489598
Uncertainty: A Diagrammatic Treatment, Economics: The Open-Access, Open-Assessment E-Journal, vol.10, issue.1, 2016. ,
DOI : 10.5018/economics-ejournal.ja.2016-3
Min-max regret scheduling to minimize the total weight of late jobs with interval uncertainty . arXiv preprint, 2017. ,
Complexity of interval minmax regret scheduling on parallel identical machines with total completion time criterion, Operations Research Letters, vol.44, issue.3, pp.354-358, 2016. ,
DOI : 10.1016/j.orl.2016.03.005
Fuzzy scheduling: Modelling flexible constraints vs. coping with incomplete knowledge, European Journal of Operational Research, vol.147, issue.2, pp.231-252, 2003. ,
DOI : 10.1016/S0377-2217(02)00558-1
Formal representations of uncertainty. Decision-Making Process: Concepts and Methods, pp.85-156, 2009. ,
Hybrid flow shop scheduling with sequence dependent family setup time and uncertain due dates, Applied Mathematical Modelling, vol.38, issue.9-10, pp.2490-2504, 2014. ,
DOI : 10.1016/j.apm.2013.10.061
Robust Solutions to Uncertain Semidefinite Programs, SIAM Journal on Optimization, vol.9, issue.1, pp.33-52, 1998. ,
DOI : 10.1137/S1052623496305717
Risk, ambiguity, and the savage axioms. The quarterly journal of economics, pp.643-669, 1961. ,
Different methods are needed to propagate ignorance and variability, Reliability Engineering & System Safety, vol.54, issue.2-3, pp.133-144, 1996. ,
DOI : 10.1016/S0951-8320(96)00071-3
The economics of industrial innovation. University of Illinois at Urbana-Champaign's Academy for Entrepreneurial Leadership Historical Research, 1982. ,
Building robust schedules using temporal protection: an empirical study of constraint based scheduling under machine failure uncertainty, 1996. ,
Generalized decision rule approximations for stochastic programming via liftings, Mathematical Programming, pp.301-338, 2015. ,
DOI : 10.1007/BF01582142
A Note on Open Shop Preemptive Schedules, IEEE Transactions on Computers, vol.28, issue.10, pp.782-786, 1979. ,
DOI : 10.1109/TC.1979.1675246
Open Shop Scheduling to Minimize Finish Time, Journal of the ACM, vol.23, issue.4, pp.665-679, 1976. ,
DOI : 10.1145/321978.321985
Robustness and stability measures for scheduling: single-machine environment, IIE Transactions, vol.20, issue.1, pp.66-83, 2008. ,
DOI : 10.1016/0305-0548(93)90091-V
, BIBLIOGRAPHY
Optimization of schedule robustness and stability under random machine breakdowns and processing time variability, IIE Transactions, vol.19, issue.4, pp.203-220, 2009. ,
DOI : 10.1016/0305-0548(93)90091-V
A practical guide to robust optimization, Omega, vol.53, pp.124-137, 2015. ,
DOI : 10.1016/j.omega.2014.12.006
Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey, Annals of discrete mathematics, vol.5, pp.287-326, 1979. ,
DOI : 10.1016/S0167-5060(08)70356-X
Sensitivity analysis of tree scheduling on two machines with communication delays, Parallel Computing, vol.30, issue.1, pp.103-120, 2004. ,
DOI : 10.1016/S0167-8191(03)00091-7
Robustness in Sequential Investment Decisions, Management Science, vol.15, issue.2, p.18, 1968. ,
DOI : 10.1287/mnsc.15.2.B18
Reasoning about uncertainty, 2005. ,
An introductory guide to uncertainty analysis in environmental and health risk assessment, 1994. ,
Greedy algorithms and metaheuristics for a multiple runway combined arrival-departure aircraft sequencing problem, Journal of Air Transport Management, vol.32, pp.39-48, 2013. ,
DOI : 10.1016/j.jairtraman.2013.06.001
Scheduling flexible job shop problem subject to machine breakdown with route changing and right-shift strategies, The International Journal of Advanced Manufacturing Technology, vol.41, issue.3, pp.1-14, 2013. ,
DOI : 10.1007/BF02023073
Treatment of Uncertainty in Performance Assessments for Complex Systems, Risk Analysis, vol.2, issue.4, pp.483-511, 1994. ,
DOI : 10.1016/0951-8320(93)90097-I
The construction of stable project baseline schedules, European Journal of Operational Research, vol.156, issue.3, pp.550-565, 2004. ,
DOI : 10.1016/S0377-2217(03)00130-9
Robust and reactive project scheduling: a review and classification of procedures, International Journal of Production Research, vol.12, issue.4, pp.1599-1620, 2004. ,
DOI : 10.1111/j.1540-5915.1996.tb01718.x
Project scheduling under uncertainty: Survey and research potentials, European Journal of Operational Research, vol.165, issue.2, pp.289-306, 2005. ,
DOI : 10.1016/j.ejor.2004.04.002
Aleatory and epistemic uncertainty in probability elicitation with an example from hazardous waste management, Reliability Engineering & System Safety, vol.54, issue.2-3, pp.217-223, 1996. ,
DOI : 10.1016/S0951-8320(96)00077-4
Two meta-heuristics for solving a new two-machine flowshop scheduling problem with the learning effect and dynamic arrivals, The International Journal of Advanced Manufacturing Technology, vol.88, issue.6, pp.1-16, 2013. ,
DOI : 10.1016/S0925-5273(03)00179-8
Pareto Efficiency in Robust Optimization, Management Science, vol.60, issue.1, pp.130-147, 2013. ,
DOI : 10.1287/mnsc.2013.1753
Production scheduling/rescheduling in flexible manufacturing, International Journal of Production Research, vol.35, issue.1, pp.281-309, 1997. ,
DOI : 10.1080/002075497196082
Optimal production planning for assembly systems with uncertain capacities and random demand, European Journal of Operational Research, vol.253, issue.2, pp.383-391, 2016. ,
DOI : 10.1016/j.ejor.2016.02.021
ROBUSTNESS MEASURES AND ROBUST SCHEDULING FOR JOB SHOPS, IIE Transactions, vol.41, issue.5, pp.32-43, 1994. ,
DOI : 10.1080/00207548508904739
Optimization models using fuzzy sets and possibility theory, 2013. ,
DOI : 10.1007/978-94-009-3869-4
-robustness: an application to the 1-median problem, RAIRO - Operations Research, vol.8, issue.2, pp.119-138, 2010. ,
DOI : 10.1002/(SICI)1099-1360(199905)8:3<181::AID-MCDA242>3.0.CO;2-P
l'?-robustesse lexicographique: une relaxation de la ?-robustesse, 2007. ,
Stochastic programming, European Journal of Operational Research, vol.10, issue.2 ,
DOI : 10.1016/0377-2217(82)90152-7
Chance Constrained Programming, Stochastic Linear Programming, pp.79-92, 1976. ,
DOI : 10.1007/978-3-642-66252-2_5
Exact and heuristic algorithms for the aerial refueling parallel machine scheduling problem with due date-to-deadline window and ready times, Computers & Industrial Engineering, vol.62, issue.1, pp.276-285, 2012. ,
DOI : 10.1016/j.cie.2011.09.015
Simulated annealing and metaheuristic for randomized priority search algorithms for the aerial refuelling parallel machine scheduling problem with due date-to-deadline windows and release times, Engineering Optimization, vol.54, issue.7, pp.67-87, 2013. ,
DOI : 10.1007/s10845-005-5514-0
Minimising the total weighted tardiness and instability for the parallel machine re-scheduling problem with deadlines and ready times, International Journal of Planning and Scheduling, vol.2, issue.2, pp.87-109, 2015. ,
DOI : 10.1504/IJPS.2015.072084
A new polynomial-time algorithm for linear programming, Proceedings of the sixteenth annual ACM symposium on Theory of computing, 1984. ,
Minimizing maximal regret in the single machine sequencing problem with maximum lateness criterion, Operations Research Letters, vol.33, issue.4, pp.431-436, 2005. ,
DOI : 10.1016/j.orl.2004.07.004
Approximating a two-machine flow shop scheduling under discrete scenario uncertainty, European Journal of Operational Research, vol.217, issue.1, pp.36-43, 2012. ,
DOI : 10.1016/j.ejor.2011.08.029
A 2-approximation algorithm for interval data minmax regret sequencing problems with the total flow time criterion, Operations Research Proceedings 2013, pp.343-344, 2008. ,
DOI : 10.1016/j.orl.2007.11.004
Single machine scheduling problems with uncertain parameters and the OWA criterion, Journal of Scheduling, vol.6, issue.4, pp.177-190, 2016. ,
DOI : 10.1023/A:1013333232691
Flow shop rescheduling under different types of disruption, International Journal of Production Research, vol.47, issue.24, pp.780-797, 2013. ,
DOI : 10.1080/00207540802400636
The general theory of interest, employment and money, 1936. ,
DOI : 10.1007/978-3-319-70344-2
Polynomial algorithms in linear programming, USSR Computational Mathematics and Mathematical Physics, vol.20, issue.1, pp.1093-1096, 1979. ,
DOI : 10.1016/0041-5553(80)90061-0
Uncertainty-based information: Variables of generalized information theory, 1998. ,
DOI : 10.1007/978-3-7908-1869-7
Risk, uncertainty andprofit, 1921. ,
,
Decision Making Under Uncertainty: Theory and Application, 2015. ,
Foundations of probability, 1933. ,
Allocation of resources and the price system, 1957. ,
Robust scheduling of a two-machine flow shop with uncertain processing times, IIE Transactions, vol.34, issue.5, pp.421-432, 2000. ,
DOI : 10.1287/opre.34.1.130
Robust discrete optimization and its applications, 1997. ,
DOI : 10.1007/978-1-4757-2620-6
Primal and dual linear decision rules in stochastic and robust optimization, Mathematical Programming, pp.177-209, 2011. ,
DOI : 10.1002/9781118032701
Adaptive airport strategic planning, European Journal of Transport and Infrastructure Research (EJTIR), vol.10, issue.3, 2010. ,
Sequencing with uncertain numerical data for makespan minimisation, Journal of the Operational Research Society, vol.50, issue.3, pp.230-243, 1999. ,
DOI : 10.1057/palgrave.jors.2600690
On Preemptive Scheduling of Unrelated Parallel Processors by Linear Programming, Journal of the ACM, vol.25, issue.4, pp.612-619, 1978. ,
DOI : 10.1145/322092.322101
Complexity of minimizing the total flow time with interval data and minmax regret criterion, Discrete Applied Mathematics, vol.154, issue.15, pp.2167-2177, 2006. ,
DOI : 10.1016/j.dam.2005.04.015
Complexity of Scheduling under Precedence Constraints, Operations Research, vol.26, issue.1, pp.22-35, 1978. ,
DOI : 10.1287/opre.26.1.22
Stability and resource allocation in project planning, IIE Transactions, vol.46, issue.7, pp.667-682, 2004. ,
DOI : 10.1016/0305-0548(93)90091-V
The complexity of machine scheduling for stability with a single disrupted job, Operations Research Letters, vol.33, issue.2, pp.151-156, 2005. ,
DOI : 10.1016/j.orl.2004.04.008
A Comparative Theoretical and Computational Study on Robust Counterpart Optimization: III. Improving the Quality of Robust Solutions, Industrial & Engineering Chemistry Research, vol.53, issue.33, pp.53-13112, 2014. ,
DOI : 10.1021/ie501898n
A multi-objective supplier selection model under stochastic demand conditions, International Journal of Production Economics, vol.105, issue.1, pp.150-159, 2007. ,
DOI : 10.1016/j.ijpe.2006.03.001
A new robust optimization approach for scheduling under uncertainty:, Computers & Chemical Engineering, vol.28, issue.6-7, pp.1069-1085, 2004. ,
DOI : 10.1016/j.compchemeng.2003.09.020
Uncertainty theory, 2015. ,
Introduction to Fuzzy and Possibilistic Optimization, 2010. ,
DOI : 10.1007/978-3-642-13935-2_2
, Physics Today, vol.11, issue.3, 1957.
DOI : 10.1063/1.3062465
Decision making and planning under low levels of predictability, International Journal of Forecasting, vol.25, issue.4, pp.716-733, 2009. ,
DOI : 10.1016/j.ijforecast.2009.05.013
A genetic algorithm for minimizing maximum lateness on parallel identical batch processing machines with dynamic job arrivals and incompatible job families, Computers & Operations Research, vol.34, issue.10, pp.3016-3028, 2007. ,
DOI : 10.1016/j.cor.2005.11.011
Single machine scheduling with scenarios, Theoretical Computer Science, vol.477, pp.57-66, 2013. ,
DOI : 10.1016/j.tcs.2012.12.006
Unifying the theory and practice of production scheduling, Journal of Manufacturing Systems, vol.18, issue.4, pp.241-255, 1999. ,
DOI : 10.1016/S0278-6125(00)86628-5
Predictable scheduling of a single machine subject to breakdowns, International Journal of Computer Integrated Manufacturing, vol.12, issue.1, pp.15-38, 1999. ,
DOI : 10.1080/095119299130443
Predictable scheduling of a job shop subject to breakdowns. Robotics and Automation, IEEE Transactions on, vol.14, issue.3, pp.365-378, 1998. ,
Parallel machine scheduling problems: A survey, Asia-Pacific Journal of Operational Research, vol.18, issue.2, p.193, 2001. ,
, BIBLIOGRAPHY
Uncertainty: a guide to dealing with uncertainty in quantitative risk and policy analysis cambridge university press, 1990. ,
DOI : 10.1017/CBO9780511840609
Parallel Machine Scheduling with Uncertain Communication Delays, RAIRO - Operations Research, vol.19, issue.1, pp.1-16, 2003. ,
DOI : 10.1016/0167-8191(93)90079-Z
Robust Optimization of Large-Scale Systems, Operations Research, vol.43, issue.2, pp.264-281, 1995. ,
DOI : 10.1287/opre.43.2.264
Equilibrium points in n-person games, 1950. ,
Robust Stochastic Approximation Approach to Stochastic Programming, SIAM Journal on Optimization, vol.19, issue.4, pp.1574-1609, 2009. ,
DOI : 10.1137/070704277
URL : https://hal.archives-ouvertes.fr/hal-00976649
Scenario generation and forecasting, 2007. ,
Verification, validation, and predictive capability in computational engineering and physics, Applied Mechanics Reviews, vol.14, issue.5, pp.345-384, 2004. ,
DOI : 10.1063/1.4823173
A survey of dynamic scheduling in manufacturing systems, Journal of Scheduling, vol.40, issue.3, pp.417-431, 2009. ,
DOI : 10.1023/A:1022235519958
Generating all efficient solutions of a rescheduling problem on unrelated parallel machines, International Journal of Production Research, vol.23, issue.19, pp.5245-5270, 2009. ,
DOI : 10.1016/0305-0548(93)90091-V
Rescheduling unrelated parallel machines with total flow time and total disruption cost criteria, Journal of the Operational Research Society, vol.28, issue.1, pp.152-164, 2011. ,
DOI : 10.1080/07408179908969872
Scheduling jobs on a single serial-batching machine with dynamic job arrivals and multiple job types, Annals of Mathematics and Artificial Intelligence, vol.98, issue.1, pp.215-228, 2016. ,
DOI : 10.1016/j.ijpe.2004.10.001
The robust (minmax regret) single machine scheduling with interval processing times and total weighted completion time objective, Computers & Operations Research, vol.66, pp.141-152, 2016. ,
DOI : 10.1016/j.cor.2015.08.010
Supply chain modelling using fuzzy sets, International Journal of Production Economics, vol.59, issue.1-3, pp.443-453, 1999. ,
DOI : 10.1016/S0925-5273(98)00109-1
Fuzzy job shop scheduling with lot-sizing, Annals of Operations Research, vol.13, issue.2, pp.275-292, 2008. ,
DOI : 10.1007/11504894_71
Scheduling: theory, algorithms, and systems ,
Integrating Scheduling with Batching and Lot-Sizing: A Review of Algorithms and Complexity, Journal of the Operational Research Society, vol.43, issue.5, pp.395-406, 1992. ,
DOI : 10.1057/jors.1992.66
Robust and stable flow shop scheduling with unexpected arrivals of new jobs and uncertain processing times, Journal of Manufacturing Systems, vol.33, issue.1, pp.84-92, 2014. ,
DOI : 10.1016/j.jmsy.2013.03.004
Truth and probability (1926) The foundations of mathematics and other logical essays, pp.156-198, 1931. ,
Rescheduling Activities in Face of Disruption in House Hold Goods Manufacturing Supply Chain, International Journal of Applied Industrial Engineering, vol.3, issue.2, pp.47-65, 2016. ,
DOI : 10.4018/IJAIE.2016070104
Scenarios and Policy Aggregation in Optimization Under Uncertainty, Mathematics of Operations Research, vol.16, issue.1, pp.119-147, 1991. ,
DOI : 10.1287/moor.16.1.119
A robustness approach to facilities design, International Journal of Production Research, vol.14, issue.4, pp.479-486, 1987. ,
DOI : 10.1080/00207548008919646
Robustness and Optimality as Criteria for Strategic Decisions, Journal of the Operational Research Society, vol.23, issue.4, pp.413-431, 1972. ,
DOI : 10.1057/jors.1972.72
Robustness and optimality as criteria for strategic decisions, Operational Research Quarterly, pp.413-431, 1972. ,
Ordonnancement en milieu incertain, mise en oeuvre d'une démarche robuste, 2003. ,
A robustness measure of the configuration of multi-purpose machines, International Journal of Production Research, vol.17, issue.1, pp.1013-1033, 2010. ,
DOI : 10.1109/TSM.2003.822730
URL : https://hal.archives-ouvertes.fr/hal-00353950
Understanding Uncertainty, Risk Analysis, vol.14, issue.5, pp.743-750, 1994. ,
DOI : 10.1111/j.1539-6924.1994.tb00284.x
Robustness in operational research and decision aiding: A multi-faceted issue, European Journal of Operational Research, vol.200, issue.3, pp.629-638, 2010. ,
DOI : 10.1016/j.ejor.2008.12.036
Stochastic Programming, 2003. ,
DOI : 10.1007/978-1-4613-1449-3
Hedging production schedules against uncertainty in manufacturing environment with a review of robustness and stability research, International Journal of Computer Integrated Manufacturing, vol.2, issue.2, pp.138-157, 2009. ,
DOI : 10.1023/A:1013333232691
The Newsvendor under Demand Ambiguity: Combining Data with Moment and Tail Information, Operations Research, vol.64, issue.1, pp.167-185, 2016. ,
DOI : 10.1287/opre.2015.1454
Optimization under uncertainty: state-of-the-art and opportunities, Computers & Chemical Engineering, vol.28, issue.6-7, pp.971-983, 2004. ,
DOI : 10.1016/j.compchemeng.2003.09.017
The foundations of statistics, 1954. ,
, BIBLIOGRAPHY
Supply chain design under uncertainty using sample average approximation and dual decomposition, European Journal of Operational Research, vol.199, issue.2, pp.409-419, 2009. ,
DOI : 10.1016/j.ejor.2008.11.040
Uncertainty and expectations in economics: essays in honour of gls shackle, 1972. ,
A mathematical theory of evidence, 1976. ,
Production planning and pricing policy in a make-to-stock system with uncertain demand subject to machine breakdowns, European Journal of Operational Research, vol.238, issue.1, pp.122-129, 2014. ,
DOI : 10.1016/j.ejor.2014.03.017
Solution algorithms for unrelated machines minmax regret scheduling problem with interval processing times and the total flow time criterion, Annals of Operations Research, vol.37, issue.5, pp.517-533, 2014. ,
DOI : 10.1016/j.cor.2009.03.013
Heuristic lot size scheduling on unrelated parallel machines with applications in the textile industry, Computers & Industrial Engineering, vol.50, issue.1-2, pp.76-89, 2006. ,
DOI : 10.1016/j.cie.2006.01.001
Ignorance and uncertainty: Emerging paradigms, 1989. ,
DOI : 10.1007/978-1-4612-3628-3
Ignorance and disasters, International journal of mass emergencies and disasters, vol.8, issue.3, pp.207-235, 1990. ,
Ignorance and uncertainty: emerging paradigms, 2012. ,
DOI : 10.1007/978-1-4612-3628-3
Stability of an optimal schedule in a job shop, Omega, vol.25, issue.4, pp.397-414, 1997. ,
DOI : 10.1016/S0305-0483(97)00012-1
Stability of an optimal schedule, European Journal of Operational Research, vol.55, issue.1, pp.91-102, 1991. ,
DOI : 10.1016/0377-2217(91)90194-Z
Stability radius of the optimal assembly line balance with fixed cycle time, ETFA 2001. 8th International Conference on Emerging Technologies and Factory Automation. Proceedings (Cat. No.01TH8597), 2001. ,
DOI : 10.1109/ETFA.2001.996422
Stability analysis of an optimal balance for an assembly line with fixed cycle time, European Journal of Operational Research, vol.168, issue.3, pp.783-797, 2006. ,
DOI : 10.1016/j.ejor.2004.07.028
URL : https://hal.archives-ouvertes.fr/hal-00387647
Minimizing total weighted completion time with uncertain data: A stability approach, Automation and Remote Control, vol.65, issue.2, pp.71-2038, 2010. ,
DOI : 10.1007/978-1-4757-2876-7_4
The stability box in interval data for minimizing the sum of weighted completion times, SIMULTECH, 2011. ,
Minimizing total weighted flow time under uncertainty using dominance and a stability box, Computers & Operations Research, vol.39, issue.6, pp.1271-1289, 2012. ,
DOI : 10.1016/j.cor.2011.02.001
Technical Note???Convex Programming with Set-Inclusive Constraints and Applications to Inexact Linear Programming, Operations Research, vol.21, issue.5, pp.1154-1157, 1973. ,
DOI : 10.1287/opre.21.5.1154
The trade-off between stability and makespan in resource-constrained project scheduling, International Journal of Production Research, vol.38, issue.2, pp.215-236, 2006. ,
DOI : 10.1016/j.ijpe.2004.08.004
-Shaped Linear Programs with Applications to Optimal Control and Stochastic Programming, SIAM Journal on Applied Mathematics, vol.17, issue.4, pp.638-663, 1969. ,
DOI : 10.1137/0117061
Rescheduling manufacturing systems: a framework of strategies, policies, and methods, Journal of Scheduling, vol.6, issue.1, pp.39-62, 2003. ,
DOI : 10.1023/A:1022235519958
Stochastic linear programs with restricted recourse, European Journal of Operational Research, vol.101, issue.1, pp.177-192, 1997. ,
DOI : 10.1016/0377-2217(95)00370-3
Theory of games and economic behavior, 1944. ,
Defining Uncertainty: A Conceptual Basis for Uncertainty Management in Model-Based Decision Support, Integrated Assessment, vol.4, issue.1, pp.5-17, 2003. ,
DOI : 10.1076/iaij.4.1.5.16466
URL : https://repository.tudelft.nl/islandora/object/uuid%3Afdc0105c-e601-402a-8f16-ca97e9963592/datastream/OBJ/download
Deep uncertainty. In Encyclopedia of operations research and management science, pp.395-402, 2013. ,
DOI : 10.1007/978-1-4419-1153-7_1140
URL : https://hal.archives-ouvertes.fr/medihal-01182179
Addressing deep uncertainty using adaptive policies: Introduction to section??2, Technological Forecasting and Social Change, vol.77, issue.6, pp.77-917, 2010. ,
DOI : 10.1016/j.techfore.2010.04.004
A novel single-period inventory problem with uncertain random demand and its application, Applied Mathematics and Computation, vol.269, pp.133-145, 2015. ,
DOI : 10.1016/j.amc.2015.06.102
Multi-Priority Online Scheduling with Cancellations, Operations Research, vol.66, issue.1, 2015. ,
DOI : 10.1287/opre.2017.1653
An introduction to the mathematics of uncertainty, 2010. ,
Opportunism and its critics, Managerial and Decision Economics, vol.6, issue.2, pp.97-107, 1993. ,
DOI : 10.1093/jleo/7.special_issue.159
URL : https://onlinelibrary.wiley.com/doi/pdf/10.1002/mde.4090140203
The classification of scheduling problems under production uncertainty, Research in Logistics & Production, pp.245-256, 2014. ,
A Graph-Theoretic Decomposition of the Job Shop Scheduling Problem to Achieve Scheduling Robustness, Operations Research, vol.47, issue.1, pp.113-124, 1999. ,
DOI : 10.1287/opre.47.1.113
, BIBLIOGRAPHY
One-machine rescheduling heuristics with efficiency and stability as criteria, Computers & Operations Research, vol.20, issue.1, pp.1-14, 1993. ,
DOI : 10.1016/0305-0548(93)90091-V
Parallel machine scheduling with splitting jobs, Discrete Applied Mathematics, vol.103, issue.1-3, pp.259-269, 2000. ,
DOI : 10.1016/S0166-218X(00)00176-1
Robust scheduling for multi-objective flexible job-shop problems with random machine breakdowns, International Journal of Production Economics, vol.141, issue.1, pp.112-126, 2013. ,
DOI : 10.1016/j.ijpe.2012.04.015
Robust makespan minimisation in identical parallel machine scheduling problem with interval data, International Journal of Production Research, vol.6, issue.1, pp.51-3532, 2013. ,
DOI : 10.1023/A:1013333232691
Hedge against total flow time uncertainty of the uniform parallel machine scheduling problem with interval data, International Journal of Production Research, vol.2005, issue.3669, pp.5611-5625, 2014. ,
DOI : 10.1023/A:1013333232691
Predictive???reactive scheduling on a single resource with uncertain future jobs, European Journal of Operational Research, vol.189, issue.3, pp.1267-1283, 2008. ,
DOI : 10.1016/j.ejor.2006.06.077
No Tardiness Rescheduling with Order Disruptions, Industrial Engineering and Management Systems, vol.12, issue.1, pp.51-62, 2013. ,
DOI : 10.7232/iems.2013.12.1.051
On the robust single machine scheduling problem, Journal of Combinatorial Optimization, vol.6, issue.1, pp.17-33, 2002. ,
DOI : 10.1023/A:1013333232691
Rescheduling on identical parallel machines with machine disruptions to minimize total completion time, European Journal of Operational Research, vol.252, issue.3, pp.737-749, 2016. ,
DOI : 10.1016/j.ejor.2016.01.045
Optimal Distribution-Inventory Planning of Industrial Gases. II. MINLP Models and Algorithms for Stochastic Cases, Industrial & Engineering Chemistry Research, vol.50, issue.5, pp.2928-2945, 2011. ,
DOI : 10.1021/ie101758u
Fuzzy sets, Information and Control, vol.8, issue.3, pp.338-353, 1965. ,
DOI : 10.1016/S0019-9958(65)90241-X
Minimising makespan on a single batch processing machine with dynamic job arrivals and non-identical job sizes, International Journal of Production Research, vol.52, issue.8, pp.52-2258, 2014. ,
DOI : 10.1002/nav.4
Fuzzy programming and linear programming with several objective functions. Fuzzy sets and systems, pp.45-55, 1978. ,
Fuzzy set theory, Wiley Interdisciplinary Reviews: Computational Statistics, vol.41, issue.3, pp.317-332, 2010. ,
DOI : 10.1016/0165-0114(91)90156-K