F. Akagi, H. Osaki, and S. Kikuchi, A method for assembly line balancing with more than one worker in each station, International Journal of Production Research, vol.23, issue.5, pp.755-770, 1983.
DOI : 10.1299/jsme1958.23.1670

F. F. Araújo, A. M. Costa, and C. Miralles, Two extensions for the ALWABP: Parallel stations and collaborative approach, International Journal of Production Economics, vol.140, issue.1, pp.483-495, 2012.
DOI : 10.1016/j.ijpe.2012.06.032

A. L. Arcus, A COMPUTER METHOD OF SEQUENCING OPERATIONS FOR ASSEMBLY LINES, International Journal of Production Research, vol.6, issue.4, pp.259-277, 1966.
DOI : 10.1287/mnsc.2.3.261

C. Artigues, S. Demassey, and E. Néron, Resource-constrained project scheduling: models, algorithms, extensions and applications, 2013.
DOI : 10.1002/9780470611227

URL : https://hal.archives-ouvertes.fr/hal-00482946

M. Barketau, M. Y. Kovalyov, J. Weglarz, and M. Machowiak, Scheduling arbitrary number of malleable tasks on multiprocessor systems, Bulletin of the Polish Academy of Sciences Technical Sciences, vol.62, issue.2, pp.255-261, 2014.
DOI : 10.2478/bpasts-2014-0025

O. Battaïa, X. Delorme, A. Dolgui, J. Hagemann, A. Horlemann et al., Workforce minimization for a mixed-model assembly line in the automotive industry, International Journal of Production Economics, vol.170, pp.489-500, 2015.
DOI : 10.1016/j.ijpe.2015.05.038

O. Battaïa, X. Delorme, A. Dolgui, S. Malyutin, A. Horlemann et al., Workforce Minimization for a Mixed-Model Assembly BIBLIOGRAPHY, 2015.

I. Baybars, A Survey of Exact Algorithms for the Simple Assembly Line Balancing Problem, Management Science, vol.32, issue.8, pp.909-932, 1986.
DOI : 10.1287/mnsc.32.8.909

J. Blazewicz, M. Machowiak, J. Weglarz, M. Y. Kovalyov, and D. Trystram, Scheduling Malleable Tasks on Parallel Processors to Minimize the Makespan, Annals of Operations Research, vol.129, issue.1-4, pp.65-80, 2004.
DOI : 10.1023/B:ANOR.0000030682.25673.c0

J. Blazewicz, T. C. Cheng, M. Machowiak, and C. Oguz, Berth and quay crane allocation: a moldable task scheduling model, Journal of the Operational Research Society, vol.147, issue.7, pp.62-1189, 2011.
DOI : 10.1016/S0377-2217(02)00293-X

J. Blazewicz, M. Drabowski, and J. Weglarz, Scheduling Multiprocessor Tasks to Minimize Schedule Length, IEEE Transactions on Computers, vol.35, issue.5, pp.389-393, 1986.
DOI : 10.1109/TC.1986.1676781

S. Belmokhtar, A. Dolgui, N. Guschinsky, and G. Levin, Integer programming models for logical layout design of modular machining lines, Computers & Industrial Engineering, vol.51, issue.3, pp.502-518, 2006.
DOI : 10.1016/j.cie.2006.08.010

URL : https://hal.archives-ouvertes.fr/hal-00387641

U. Besikci, U. Bilge, and G. Ulusoy, Resource dedication problem in a multi-project environment, Flexible Services and Manufacturing Journal, vol.54, issue.8, pp.206-229, 2013.
DOI : 10.1002/aic.11522

C. Blum and C. Miralles, On solving the assembly line worker assignment and balancing problem via beam search, Computers & Operations Research, vol.38, issue.1, pp.328-329, 2011.
DOI : 10.1016/j.cor.2010.05.008

L. Borba and M. Ritt, A heuristic and a branch-and-bound algorithm for the Assembly Line Worker Assignment and Balancing Problem, Computers & Operations Research, vol.45, pp.87-96, 2014.
DOI : 10.1016/j.cor.2013.12.002

P. Borisovsky, X. Delorme, and A. Dolgui, Genetic algorithm for balancing reconfigurable machining lines. Computers and Industrial En- gineering, 2013.
DOI : 10.1016/j.cie.2012.12.009

URL : https://hal.archives-ouvertes.fr/emse-00769634

N. Boysen and S. Emde, Scheduling the part supply of mixed-model assembly lines in line-integrated supermarkets, European Journal of Operational Research, vol.239, issue.3, pp.820-829, 2014.
DOI : 10.1016/j.ejor.2014.05.029

N. Boysen, M. Fliedner, and A. Scholl, Assembly line balancing: Which model to use when?, International Journal of Production Economics, vol.111, issue.2, pp.509-528, 2008.
DOI : 10.1016/j.ijpe.2007.02.026

URL : http://www.wiwi.uni-jena.de/papers/wp-sw2306.pdf

N. Boysen, M. Fliedner, and A. Scholl, A classification of assembly line balancing problems, European Journal of Operational Research, vol.183, issue.2, pp.674-693, 2007.
DOI : 10.1016/j.ejor.2006.10.010

J. D. Camm, M. J. Magazine, G. G. Polak, and G. S. Zaric, Scheduling parallel assembly workstations to minimize a shared pool of labor, IIE Transactions, vol.40, issue.8, pp.40-749, 2008.
DOI : 10.1016/S0377-2217(01)00056-X

J. C. Carver and T. Epperly, Software Engineering for Computational Science and Engineering, Computing in Science & Engineering, vol.14, issue.2, pp.6-9, 2014.
DOI : 10.1109/MCSE.2012.31

A. N. Choundhary, B. Narahari, D. M. Nicol, and R. Simha, Optimal processor assignment for a class of pipelined computations, IEEE Transactions on Parallel and Distributed Systems, vol.54, pp.439-445, 1994.

T. H. Cormen, C. E. Leiserson, R. L. Rivest, and C. Stein, Introduction to Algorithms, pp.10-12, 2001.

A. Corominas, R. Pastor, and J. Plans, Balancing assembly line with skilled and unskilled workers, Omega, vol.36, issue.6, pp.1126-1132, 2008.
DOI : 10.1016/j.omega.2006.03.003

D. Bruecker, P. Van-den-bergh, J. Beliën, J. Demeulemeester, and E. , Workforce planning incorporating skills: State of the art, European Journal of Operational Research, vol.243, issue.1, pp.1-16, 2015.
DOI : 10.1016/j.ejor.2014.10.038

X. Delorme, A. Dolgui, and S. Malyutin, A multi-objective algorithm for balancing reconfigurable transfer lines, 20th Conference of the International Federation of Operational Research Societies (IFORS), 2014.
URL : https://hal.archives-ouvertes.fr/emse-01084120

E. L. Demeulemeester, W. S. Herroelen, and S. E. Elmaghraby, Optimal procedures for the discrete time/cost trade-off problem in project networks, European Journal of Operational Research, vol.88, issue.1, pp.50-68, 1996.
DOI : 10.1016/0377-2217(94)00181-2

A. Dolgui and J. Proth, Systèmes de production modernes, Hermès Science/ Lavoisier, 2006.

A. Dolgui and J. Proth, Supply Chains Engineering: Useful Methods and Techniques, 2010.
DOI : 10.1007/978-1-84996-017-5

A. Dolgui and I. Ihnatsenka, Branch and bound algorithm for a transfer line design problem: Stations with sequentially activated multi-spindle heads, European Journal of Operational Research, vol.197, issue.3, pp.1197-1232, 2009.
DOI : 10.1016/j.ejor.2008.03.028

URL : https://hal.archives-ouvertes.fr/emse-00676013

A. Dolgui, B. Finel, N. Guschinsky, G. Levin, and F. Vernadat, MIP approach to balancing transfer lines with blocks of parallel operations, IIE Transactions, vol.36, issue.10, pp.869-882, 2006.
DOI : 10.1287/mnsc.32.4.430

URL : https://hal.archives-ouvertes.fr/hal-00387642

A. Dolgui, N. Guschinsky, and G. Levin, On problem of optimal design of transfer lines with parallel and sequential operations, 1999 7th IEEE International Conference on Emerging Technologies and Factory Automation. Proceedings ETFA '99 (Cat. No.99TH8467), pp.329-334, 1999.
DOI : 10.1109/ETFA.1999.815373

A. Dolgui, S. Kovalev, M. Y. Kovalyov, S. Malyutin, and A. Soukhal, Minimizing the number of workers for one cycle of a paced production line, IFAC-PapersOnLine, vol.48, issue.3, pp.2281-2286, 2015.
DOI : 10.1016/j.ifacol.2015.06.427

A. Dolgui, . Guschinsky, and G. Levin, Approaches to balancing of transfer lines with blocks of parallel operations; Preprints No 8, p.42, 2000.

A. Dolgui, O. Guschinskaya, and A. Eremeev, MIP-based GRASP and genetic algorithm for balancing transfer lines The second international workshop on model based metaheuristics, Proceedings of the Matheuristics, p.22, 2008.

M. Drozdowski, Scheduling multiprocessor tasks ??? An overview, European Journal of Operational Research, vol.94, issue.2, pp.215-230, 1996.
DOI : 10.1016/0377-2217(96)00123-3

URL : http://citeseerx.ist.psu.edu/viewdoc/download?doi=10.1.1.159.1883&rep=rep1&type=pdf

P. Dutot, G. Mounié, and D. Trystram, Scheduling parallel tasks approximation algorithms, Handbook of Scheduling: Algorithms, Models, and Performance Analysis, 2004.
URL : https://hal.archives-ouvertes.fr/hal-00003126

J. Du and J. Leung, Complexity of Scheduling Parallel Task Systems, SIAM Journal on Discrete Mathematics, vol.2, issue.4, pp.473-487, 1989.
DOI : 10.1137/0402042

J. Du, J. Leung, and G. H. Young, Scheduling chain-structured tasks to minimize makespan and mean flow time, Information and Computation, vol.92, issue.2, pp.219-236, 1991.
DOI : 10.1016/0890-5401(91)90009-Q

URL : https://doi.org/10.1016/0890-5401(91)90009-q

M. Essafi, X. Delorme, and A. Dolgui, A reactive GRASP and Path Relinking for balancing reconfigurable transfer lines, International Journal of Production Research, vol.6, issue.4, pp.5213-5238, 2012.
DOI : 10.1023/A:1008067422364

URL : https://hal.archives-ouvertes.fr/emse-00693913

M. Essafi, X. Delorme, A. Dolgui, and O. Guschinskaya, A MIP approach for balancing transfer line with complex industrial constraints, Computers & Industrial Engineering, vol.58, issue.3, pp.393-400, 2010.
DOI : 10.1016/j.cie.2009.04.009

URL : https://hal.archives-ouvertes.fr/emse-00672868

M. Essafi, X. Delorme, and A. Dolgui, Balancing lines with CNC machines: A multi-start ant based heuristic, CIRP Journal of Manufacturing Science and Technology, vol.2, issue.3, pp.176-182, 2010.
DOI : 10.1016/j.cirpj.2010.05.002

URL : https://hal.archives-ouvertes.fr/emse-00710396

B. Finel, A. Dolgui, and F. Vernadat, A random search and backtracking procedure for transfer line balancing, International Journal of Computer Integrated Manufacturing, vol.32, issue.4, pp.376-387, 2008.
DOI : 10.1287/mnsc.32.4.430

URL : https://hal.archives-ouvertes.fr/hal-00387677

A. T. Ernst, H. Jiang, M. Krishnamoorthy, and D. Sier, Staff scheduling and rostering: A review of applications, methods and models, European Journal of Operational Research, vol.153, issue.1, pp.3-27, 2004.
DOI : 10.1016/S0377-2217(03)00095-X

W. P. Helgeson and D. P. Birnie, Assembly line balancing using the ranked positional weight technic, Journal of Industrial Engineering, vol.12, pp.394-398, 1961.

M. R. Garey and D. S. Johnson, Computers and intractability: A guide to the theory of NP-completeness, 1979.

P. Ghoddousi, E. Eshtehardian, S. Jooybanpour, and A. Javanmardi, Multi-mode resource-constrained discrete time-cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm. Automation in Construction, pp.216-227, 2013.
DOI : 10.1016/j.autcon.2012.11.014

V. Giard and J. Jeunet, Optimal sequencing of mixed models with sequence-dependent setups and utility workers on an assembly line, International Journal of Production Economics, vol.123, issue.2, pp.290-300, 2010.
DOI : 10.1016/j.ijpe.2009.09.001

H. Gökçen, K. Gpak, and R. Benzer, Balancing of parallel assembly lines, International Journal of Production Economics, vol.103, issue.2, pp.600-609, 2006.
DOI : 10.1016/j.ijpe.2005.12.001

H. Gökçen and K. Gpak, A goal programming approach to simple U-line balancing problem, European Journal of Operational Research, vol.171, issue.2, pp.577-585, 2006.
DOI : 10.1016/j.ejor.2004.09.021

O. Guschinskaya, A. Dolgui, N. Guschinsky, and G. Levin, A heuristic multi-start decomposition approach for optimal design of serial machining lines, European Journal of Operational Research, vol.189, issue.3, pp.902-913, 2008.
DOI : 10.1016/j.ejor.2006.03.072

URL : https://hal.archives-ouvertes.fr/hal-00387681

J. E. Hannay, C. Macleod, J. Singer, H. P. Langtangen, D. Pfahl et al., How do scientists develop and use scientific software?, 2009 ICSE Workshop on Software Engineering for Computational Science and Engineering, pp.1-8, 2009.
DOI : 10.1109/SECSE.2009.5069155

URL : http://www.third-bit.com/articles/how-scientists-use-computers-2009.pdf

S. Hunold, One step toward bridging the gap between theory and practice in moldable task scheduling with precedence constraints, Concurrency and Computation: Practice and Experience, vol.7, issue.10, pp.1010-1026, 2015.
DOI : 10.1145/944618.944621

R. Kolisch and A. Sprecher, PSPLIB - A project scheduling problem library, European Journal of Operational Research, vol.96, issue.1, pp.205-216, 1997.
DOI : 10.1016/S0377-2217(96)00170-1

URL : ftp://ftp.bwl.uni-kiel.de/pub/operations-research/wp396.ps

R. Kolisch, A. Sprecher, and A. Drexl, Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems, Management Science, vol.41, issue.10, pp.41-1693, 1995.
DOI : 10.1287/mnsc.41.10.1693

M. Y. Kovalyov, X. Delorme, and A. Dolgui, Workforce planning for cyclic production of multiple parts. The First International Workshop on Dynamic Scheduling Problems, 2016.
URL : https://hal.archives-ouvertes.fr/hal-01435918

Y. Koren, F. Jovane, U. Heisel, . Moriwaki-"-t, G. Pritschow et al., Reconfigurable Manufacturing Systems, CIRP Annals, vol.48, issue.2, pp.527-598, 1999.
DOI : 10.1016/S0007-8506(07)63232-6

P. Kouvelis and S. Karabati, Cyclic scheduling in synchronous production lines, IIE Transactions, vol.2, issue.8, pp.31-709, 1999.
DOI : 10.1080/00207549408957076

W. Ku and J. C. Beck, Mixed Integer Programming models for job shop scheduling: A computational analysis (2016) Computers and Operations Research, pp.165-173
DOI : 10.1016/j.cor.2016.04.006

C. Lee and G. L. Vairaktarakis, Workforce Planning in Mixed Model Assembly Systems, Operations Research, vol.45, issue.4, pp.553-567, 1997.
DOI : 10.1287/opre.45.4.553

H. Li and K. Womer, Optimizing the supply chain configuration for make-to-order manufacturing, European Journal of Operational Research, vol.221, issue.1, pp.118-128, 2012.
DOI : 10.1016/j.ejor.2012.03.025

E. L. Lloyd, Concurrent Task Systems, Operations Research, vol.29, issue.1, pp.189-201, 1981.
DOI : 10.1287/opre.29.1.189

C. M. Lutz and K. R. Davis, Development of operator assignment schedules: A DSS approach, Omega, vol.22, issue.1, pp.57-67, 1994.
DOI : 10.1016/0305-0483(94)90007-8

J. J. Merelo-guervós, G. Romero, M. García-arenas, P. A. Castillo, A. M. Mora et al., Implementation matters: programming best practices for evolutionary algorithms, Advances in Computational Intelligence, pp.333-340, 2011.

C. L. Monma, A. Schrijver, M. J. Todd, and V. K. Wei, Convex Resource Allocation Problems on Directed Acyclic Graphs: Duality, Complexity, Special Cases, and Extensions, Mathematics of Operations Research, vol.15, issue.4, pp.736-748, 1990.
DOI : 10.1287/moor.15.4.736

M. C. Moreira and A. M. Costa, Hybrid heuristics for planning job rotation schedules in assembly lines with heterogeneous workers, International Journal of Production Economics, vol.141, issue.2, pp.552-560, 2013.
DOI : 10.1016/j.ijpe.2012.09.011

O. Mutlu, O. Polat, and A. A. Supciller, An iterative genetic algorithm for the assembly line worker assignment and balancing problem of type-II, Computers & Operations Research, vol.40, issue.1, pp.418-426, 2013.
DOI : 10.1016/j.cor.2012.07.010

A. Otto, C. Otto, and A. Scholl, Systematic data generation and test design for solution algorithms on the example of SALBPGen for assembly line balancing, European Journal of Operational Research, vol.228, issue.1, pp.33-45, 2013.
DOI : 10.1016/j.ejor.2012.12.029

M. R. Ranjbar and F. Kianfar, Solving the discrete time/resource trade-off problem in project scheduling with genetic algorithms, Applied Mathematics and Computation, vol.191, issue.2, pp.451-456, 2007.
DOI : 10.1016/j.amc.2007.02.109

M. Ritt, A. M. Costa, and C. Miralles, The assembly line worker assignment and balancing problem with stochastic worker availability, International Journal of Production Research, vol.16, issue.1, pp.907-922, 2016.
DOI : 10.1080/00207548608919711

B. Rekiek, A. Dolgui, A. Delchambre, and A. Bratcu, State of art of optimization methods for assembly line design, Annual Reviews in Control, vol.26, issue.2, pp.163-174, 2002.
DOI : 10.1016/S1367-5788(02)00027-5

F. Salewski, A. Schirmer, and A. Drexl, Project scheduling under resource and mode identity constraints: Model, complexity, methods, and application, European Journal of Operational Research, vol.102, issue.1, pp.88-110, 1997.
DOI : 10.1016/S0377-2217(96)00219-6

M. E. Salveson, The assembly line balancing problem, Journal of Industrial Engineering, vol.6, issue.3, p.1825, 1955.

A. Scholl, Balancing and Sequencing of Assembly Lines, 1999.
DOI : 10.1007/978-3-662-00861-4

A. Scholl, N. Boysen, and M. Fliedner, The sequence-dependent assembly line balancing problem, OR Spectrum, vol.9, issue.3, pp.579-609, 2008.
DOI : 10.1080/05695557108974787

J. Segal and C. Morris, Developing Scientific Software, IEEE Software, vol.25, issue.4, pp.18-20, 2008.
DOI : 10.1109/MS.2008.85

S. Prasanna, G. N. Musicus, and B. R. , Generalized multiprocessor scheduling for directed acyclic graphs, Proceedings of Supercomputing, pp.237-246, 1994.

B. Sungur and Y. Yavuz, Assembly line balancing with hierarchical worker assignment, Journal of Manufacturing Systems, vol.37, issue.1, pp.290-298, 2015.
DOI : 10.1016/j.jmsy.2014.08.004

L. Y. Tseng and S. C. Chen, Two-Phase Genetic Local Search Algorithm for the Multimode Resource-Constrained Project Scheduling Problem, IEEE Transactions on Evolutionary Computation, vol.13, issue.4, pp.848-857, 2009.
DOI : 10.1109/TEVC.2008.2011991

G. L. Vairaktarakis and X. Cai, Complexity of workforce scheduling in transfer lines, Journal of Global Optimization, vol.27, issue.2/3, pp.273-291, 2003.
DOI : 10.1023/A:1024818502622

G. L. Vairaktarakis, X. Cai, and C. Lee, Workforce planning in synchronous production systems, European Journal of Operational Research, vol.136, issue.3, pp.551-572, 2002.
DOI : 10.1016/S0377-2217(01)00056-X

G. L. Vairaktarakis and J. K. Winch, Worker cross-training in paced assembly lines, Manufacturing and Service Operations Management, pp.112-131, 1999.
DOI : 10.1287/msom.1.2.112

N. S. Vidic, Developing methods to solve the workforce assignment problem considering worker heterogeneity and learning and forgetting, 2008.

M. Vilà and J. Pereira, A branch-and-bound algorithm for assembly line worker assignment and balancing problems, Computers & Operations Research, vol.44, pp.105-114, 2014.
DOI : 10.1016/j.cor.2013.10.016

Q. Wang and K. H. Cheng, List scheduling of parallel tasks, Information Processing Letters, vol.37, issue.5, pp.291-297, 1991.
DOI : 10.1016/0020-0190(91)90222-4

Q. Wang and K. H. Cheng, A Heuristic of Scheduling Parallel Tasks and Its Analysis, SIAM Journal on Computing, vol.21, issue.2, pp.281-294, 1992.
DOI : 10.1137/0221021

J. M. Wilson, Formulation of a problem involving assembly lines with multiple manning of work stations, International Journal of Production Research, vol.24, issue.1, pp.59-63, 1986.
DOI : 10.1080/00207548408942450

G. Wilson, D. A. Aruliah, C. T. Brown, C. Hong, N. P. Davis et al., Best Practices for Scientific Computing, PLoS Biology, vol.5, issue.1, 2014.
DOI : 10.1109/MCISE.2003.1238707

URL : http://journals.plos.org/plosbiology/article/file?id=10.1371/journal.pbio.1001745&type=printable

M. Sergey and . Algorithms, Software for Decision Support in Design of Assembly and Transfer Lines Speciality : Industrial Engineering Keywords : assembly line, transfer line, line balancing, workforce assignment, algorithms, software, MILP, heuristics, computer experiments Abstract