B. Abdolhamidzadeh, T. Abbasi, D. Rashtchian, and S. A. Abbasi, Domino effect in process-industry accidents ??? An inventory of past events and identification of some patterns, Journal of Loss Prevention in the Process Industries, pp.575-593, 2011.
DOI : 10.1016/j.jlp.2010.06.013

A. Aguilar, L. Pujades, A. Barbat, and M. Ordaz, Probabilistic assessment of seismic risk in urban areas, Proceedings of the 14th World Conference on Earthquake Engineering, pp.12-17, 2008.

A. Akintoye and . Macleod, Risk analysis and management in construction, International Journal of Project Management, vol.15, issue.1, pp.31-38, 1997.
DOI : 10.1016/S0263-7863(96)00035-X

J. Akkanen and J. K. Nurminen, Case study of the evolution of routing algorithms in a network planning tool, Journal of Systems and Software, vol.58, issue.3, pp.181-198, 2001.
DOI : 10.1016/S0164-1212(01)00037-1

M. Andayesh and F. Sadeghpour, Dynamic site layout planning through minimization of total potential energy. Automation in Construction, pp.92-102, 2013.

M. Andayesh and F. Sadeghpour, The time dimension in site layout planning. Automation in Construction, pp.129-139, 2014.

A. R. Andoh, X. Su, and H. Cai, A Framework of RFID and GPS for Tracking Construction Site Dynamics, Construction Research Congress 2012, pp.818-827, 2012.
DOI : 10.1061/9780784412329.083

G. Antonioni, G. Spadoni, and V. Cozzani, Application of domino effect quantitative risk assessment to an extended industrial area, Journal of Loss Prevention in the Process Industries, pp.614-624, 2009.
DOI : 10.1016/j.jlp.2009.02.012

R. D. Archibald, Managing high-technology programs and projects, 2003.

H. Astour and V. Franz, BIM-and Simulation-Based Site Layout Planning, Computing in Civil and Building Engineering (2014), pp.291-298, 2014.
DOI : 10.1061/9780784413616.037

N. Banaitiene and A. Banaitis, Risk Management in Construction Projects', Risk Management: Current Issues and Challenges, pp.429-448, 2012.

T. Belinfante, . Manen, and . Scholten, The Economy Valuation of Geospatial Information and Risk Management, Proceedings of 8th International Conference on Geoinformation for Disaster, pp.29-40, 2012.

J. Bin, C. Christophe, and K. Bjorn, Integration of space syntax into GIS for modeling urban spaces, International Journal of Applied Earth Observation and Geoinformation, vol.2, issue.3r4, pp.161-171, 2000.

B. W. Butler and J. D. Cohen, Firefighter Safety Zones: A Theoretical Model Based on Radiative Heating, International Journal of Wildland Fire, vol.8, issue.2, pp.73-77, 1998.
DOI : 10.1071/WF9980073

O. D. Cardona, M. Ordaz, E. Reinoso, L. E. Yamín, and A. H. Barbat, CAPRA?comprehensive approach to probabilistic risk assessment: international initiative for risk management effectiveness, Proceedings of the 15th world conference in earthquake engineering, 2012.

V. Carr and J. H. Tah, A fuzzy approach to construction project risk assessment and analysis: construction project risk management system, Advances in Engineering Software, vol.32, issue.10-11, pp.847-857, 2001.
DOI : 10.1016/S0965-9978(01)00036-9

M. Charrière, . Bogaard, and . Mostert, Disaster Managers' Perception of Effective Visual Risk Communication for General Public, Proceedings of 8 th International Conference on Geo-information for Disaster, pp.11-20

M. Y. Cheng, O. Connor, and J. T. , Site layout of construction temporary facilities using an enhanced geographic information system (GIS)Automation in construction, pp.11-19, 1994.

M. Y. Cheng, O. Connor, and J. T. , ArcSite: Enhanced GIS for Construction Site Layout, Journal of Construction Engineering and Management, vol.122, issue.4, pp.329-336, 1996.
DOI : 10.1061/(ASCE)0733-9364(1996)122:4(329)

Y. Choi and A. Nieto, Optimal haulage routing of off-road dump trucks in construction and mining sites using Google Earth and a modified least-cost path algorithm, Automation in Construction, vol.20, issue.7, pp.982-997, 2011.
DOI : 10.1016/j.autcon.2011.03.015

Y. Choi, H. D. Park, C. Sunwoo, and K. C. Clarke, Multi???criteria evaluation and least???cost path analysis for optimal haulage routing of dump trucks in large scale open???pit mines, International Journal of Geographical Information Science, vol.92, issue.12, pp.1541-1567, 2009.
DOI : 10.1080/1365881031000072645

W. Collischonn and J. V. Pilar, A direction dependent least-cost-path algorithm for roads and canals, International Journal of Geographical Information Science, vol.54, issue.4, pp.397-406, 2000.
DOI : 10.1080/136588198241554

URL : http://arandu.org.ar/pub/pd-gis.pdf

D. Dagan, I. , and S. , Planning safe distances between workers on construction sites. Automation in construction, pp.64-71, 2015.
DOI : 10.1016/j.autcon.2014.12.008

E. W. Dijkstra, A note on two problems in connexion with graphs, Numerische Mathematik, vol.4, issue.1, pp.269-271, 1959.
DOI : 10.1007/BF01386390

J. Douglas, Physical vulnerability modelling in natural hazard risk assessment, Natural Hazards and Earth System Science, vol.7, issue.2, pp.283-288, 2007.
DOI : 10.5194/nhess-7-283-2007

URL : https://hal.archives-ouvertes.fr/hal-00330925

S. M. Easa and K. M. Hossain, New Mathematical Optimization Model for Construction Site Layout, Journal of Construction Engineering and Management, vol.134, issue.8, pp.653-662, 2008.
DOI : 10.1061/(ASCE)0733-9364(2008)134:8(653)

S. Eckert, R. Jelinek, G. Zeug, and E. Krausmann, Remote sensing-based assessment of tsunami vulnerability and risk in Alexandria, Egypt, Applied Geography, vol.32, issue.2, pp.714-723, 2012.
DOI : 10.1016/j.apgeog.2011.08.003

E. Ansary, A. M. Shalaby, and M. F. , Evolutionary optimization technique for site layout planning, Sustainable Cities and Society, vol.11, pp.48-55, 2014.
DOI : 10.1016/j.scs.2013.11.008

E. Elbeltagi and T. M. Hegazy, Optimum layout planning for irregular construction sites, Proceedings of the 5th CSCE Construction Specialty Conference, 2003.

E. Elbeltagi, T. Hegazy, A. H. Hosny, and A. Eldosouky, Schedule-dependent evolution of site layout planning, Construction Management and Economics, vol.125, issue.7, pp.689-697, 2001.
DOI : 10.1061/(ASCE)0733-9364(1999)125:6(400)

K. El-rayes and A. Khalafallah, Trade-off between Safety and Cost in Planning Construction Site Layouts, Journal of Construction Engineering and Management, vol.131, issue.11, pp.1186-1195, 2005.
DOI : 10.1061/(ASCE)0733-9364(2005)131:11(1186)

K. El-rayes and H. Said, Global Optimization of Dynamic Site Layout Planning in Construction Projects, Construction Research Congress 2009, pp.846-855, 2009.
DOI : 10.1061/41020(339)86

S. C. Feldman, R. E. Pelletier, E. Walser, J. C. Smoot, and D. Ahl, A prototype for pipeline routing using remotely sensed data and geographic information system analysis, Remote Sensing of Environment, vol.53, issue.2, pp.123-131, 1995.
DOI : 10.1016/0034-4257(95)00047-5

S. Fuchs, K. Heiss, and J. Hübl, Towards an empirical vulnerability function for use in debris flow risk assessment, Natural Hazards and Earth System Science, vol.7, issue.5, pp.495-506, 2007.
DOI : 10.5194/nhess-7-495-2007

URL : https://hal.archives-ouvertes.fr/hal-00299444

M. Gao, . Mo, and G. He, A Simultaneous Route and Departure Time Choice Model for Evacuation Planning, International Conference on Transportation Engineering 2007, pp.473-478, 2007.
DOI : 10.1061/40932(246)78

M. Gen, R. Cheng, and S. S. Oren, Network design techniques using adapted genetic algorithms Advances in Engineering Software, pp.731-744, 2001.
DOI : 10.1016/s0965-9978(01)00007-2

T. Hegazy and E. Elbeltagi, EvoSite: Evolution-Based Model for Site Layout Planning, Journal of Computing in Civil Engineering, vol.13, issue.3, pp.198-206, 1999.
DOI : 10.1061/(ASCE)0887-3801(1999)13:3(198)

S. S. Heragu and A. Kusiak, Efficient models for the facility layout problem, European Journal of Operational Research, vol.53, issue.1, pp.1-13, 1991.
DOI : 10.1016/0377-2217(91)90088-D

B. Hillier, Space is the machine: a configurational theory of architecture. Electronic edition, Space Syntax, 2007.

K. Hollenstein, Reconsidering the risk assessment concept: <br>Standardizing the impact description as a building block for vulnerability assessment, Natural Hazards and Earth System Science, vol.5, issue.3, pp.301-307, 2005.
DOI : 10.5194/nhess-5-301-2005

C. Huang and C. K. Wong, Optimisation of site layout planning for multiple construction stages with safety considerations and requirements. Automation in Construction, pp.58-68, 2015.

L. Hui, W. Yongqing, S. Shimei, and S. Baotie, Study on Safety Assessment of Fire Hazard for the Construction Site, Procedia Engineering, vol.43, pp.369-373, 2012.
DOI : 10.1016/j.proeng.2012.08.064

O. A. Jannadi and S. Almishari, Risk Assessment in Construction, Journal of Construction Engineering and Management, vol.129, issue.5, pp.492-500, 2003.
DOI : 10.1061/(ASCE)0733-9364(2003)129:5(492)

B. Jiang, C. Claramunt, and B. Klarqvist, Integration of space syntax into GIS for modelling urban spaces, International Journal of Applied Earth Observation and Geoinformation, vol.2, issue.3-4, pp.161-171, 2000.
DOI : 10.1016/S0303-2434(00)85010-2

URL : http://www.hig.se/%7Ebjg/JAG-final.pdf

F. Kadri, E. Châtelet, and G. Chen, Method for quantitative assessment of the domino effect in industrial sites, Process Safety and Environmental Protection, vol.91, issue.6, pp.91452-462, 2013.
DOI : 10.1016/j.psep.2012.10.010

M. A. Kamal, City planning and development using geographic information systems, 2008 11th International Conference on Computer and Information Technology, pp.31-35, 2008.
DOI : 10.1109/ICCITECHN.2008.4802964

L. Kang, . Kim, . Moon, and . Kim, Development of a 4D Object-Based System For Visualizing The Risk Information of Construction Projects', Automation in Construction, pp.186-203, 2013.

S. Kang and J. Seo, GIS Method for Haul Road Layout Planning in Large Earthmoving Projects: Framework and Analysis, Journal of Construction Engineering and Management, vol.139, issue.2, pp.236-246, 2012.
DOI : 10.1061/(ASCE)CO.1943-7862.0000561

H. Kim, . Lee, and . Park, Automated Information Retrieval for Hazard Identification in Construction Sites, Computing in Civil Engineering, pp.897-904
DOI : 10.1061/9780784413029.112

A. Kusiak and S. S. Heragu, The facility layout problem, European Journal of Operational Research, vol.29, issue.3, pp.229-251, 1987.
DOI : 10.1016/0377-2217(87)90238-4

K. C. Lam, X. Ning, and M. C. Lam, Conjoining MMAS to GA to Solve Construction Site Layout Planning Problem, Journal of Construction Engineering and Management, vol.135, issue.10, pp.1049-1057, 2009.
DOI : 10.1061/(ASCE)0733-9364(2009)135:10(1049)

N. Lantada, L. G. Pujades, and A. H. Barbat, Vulnerability index and capacity spectrum based methods for urban seismic risk evaluation. A comparison, Natural Hazards, vol.8, issue.1, pp.501-524, 2009.
DOI : 10.1023/B:JOSE.0000009516.91044.51

M. Gómez-albarrán, M. Fernández-pampillón-cesteros, A. M. Sanchez-perez, and J. M. , A routing strategy based on genetic algorithms, Microelectronics Journal, vol.28, issue.6-7, pp.641-656, 1997.
DOI : 10.1016/S0026-2692(96)00150-4

F. Leone, F. Lavigne, R. Paris, J. C. Denain, and F. Vinet, A spatial analysis of the December 26th tsunami-induced damages: Lessons learned for a better risk assessment integrating buildings vulnerability, Applied Geography, issue.1, pp.31363-375, 2004.
URL : https://hal.archives-ouvertes.fr/hal-00539789

A. López-molina, R. Vázquez-román, M. S. Mannan, and M. G. Félix-flores, An approach for domino effect reduction based on optimal layouts, Journal of Loss Prevention in the Process Industries, vol.26, issue.5, pp.887-894, 2013.
DOI : 10.1016/j.jlp.2012.11.001

L. Mahdjoubi and J. L. Yang, An intelligent materials routing system on complex construction sites, Logistics Information Management, vol.14, issue.5/6, pp.337-344, 2001.
DOI : 10.1016/S0926-5805(98)00104-6

M. Marchand, J. Buurman, A. Pribadi, and A. Kurniawan, Damage and casualties modelling as part of a vulnerability assessment for tsunami hazards: a case study from Aceh, Indonesia, Journal of Flood Risk Management, vol.2, issue.2, pp.120-131, 2009.
DOI : 10.1111/j.1753-318X.2009.01027.x

M. Mavroulidou, . Hughes, and E. Hellawell, A qualitative tool combining an interaction matrix and a GIS to map vulnerability to traffic induced air pollution, Journal of Environmental Management, vol.70, issue.4, pp.283-289, 2004.
DOI : 10.1016/j.jenvman.2003.12.002

A. Mebarki and B. Barroca, Resilience and vulnerability analysis for restoration after tsunamis and floods: the case of dwellings and industrial plants. Post-Tsunami Hazard: Reconstruction and Restoration, pp.237-257, 2014.
URL : https://hal.archives-ouvertes.fr/hal-01314576

A. Mebarki, S. Jerez, I. Matasic, G. Prodhomme, and M. Reimeringer, Explosions and structural fragments as industrial hazard: domino effect and risks, Procedia Engineering, pp.45159-166, 2012.
URL : https://hal.archives-ouvertes.fr/hal-00832334

A. Mebarki, S. Jerez, I. Matasic, G. Prodhomme, M. Reimeringer et al., Domino Effects and Industrial Risks: Integrated Probabilistic Framework ??? Case of Tsunamis Effects, Tsunami Events and Lessons Learned, pp.271-307, 2014.
DOI : 10.1007/978-94-007-7269-4_15

URL : https://hal.archives-ouvertes.fr/hal-01314585

A. Mebarki, S. Jerez, G. Prodhomme, and M. Reimeringer, Natural hazards, vulnerability and structural resilience: tsunamis and industrial tanks, Geomatics, Natural Hazards, and Risk, pp.1-13, 2016.
DOI : 10.1016/j.oceaneng.2010.11.008

URL : https://hal.archives-ouvertes.fr/hal-01314527

A. Mebarki, N. Valencia, J. L. Salagnac, and B. Barroca, Flood hazards and masonry constructions: a probabilistic framework for damage, risk and resilience at urban scale, Natural Hazards and Earth System Science, vol.12, issue.5, pp.1799-1809, 2012.
DOI : 10.5194/nhess-12-1799-2012

URL : https://hal.archives-ouvertes.fr/hal-00732165

A. Mebarki, A. Willot, S. Jerez, M. Reimeringer, and G. Prod-'homme, Vulnerability and Resilience under Effects of Tsunamis: Case of Industrial Plants, Procedia Engineering, vol.84, pp.116-121, 2014.
DOI : 10.1016/j.proeng.2014.10.520

URL : https://hal.archives-ouvertes.fr/hal-01314630

E. Mezura-montes, M. E. Miranda-varela, and R. Del-carmen-gómez-ramón, Differential evolution in constrained numerical optimization: An empirical study, Information Sciences, vol.180, issue.22, pp.4223-4262, 2010.
DOI : 10.1016/j.ins.2010.07.023

P. Mitropoulos and M. Namboodiri, New Method for Measuring the Safety Risk of Construction Activities: Task Demand Assessment, Journal of Construction Engineering and Management, vol.137, issue.1, 2010.
DOI : 10.1061/(ASCE)CO.1943-7862.0000246

P. Modesti and A. Sciomachen, A utility measure for finding multiobjective shortest paths in urban multimodal transportation networks, European Journal of Operational Research, vol.111, issue.3, pp.495-508, 1998.
DOI : 10.1016/S0377-2217(97)00376-7

Q. B. Nguyen, A. Mebarki, R. A. Saada, F. Mercier, and M. Reimeringer, Integrated probabilistic framework for domino effect and risk analysis Advances in Engineering Software, pp.892-901, 2009.
DOI : 10.1016/j.advengsoft.2009.01.002

A. D. Patil and D. A. Joshi, A Review Paper on Construction Site Layout Planning, International Journal of Innovations in Engineering and Technology (IJIET), vol.3, issue.2, 2013.

M. E. Pedersen, Good parameters for differential evolution, 2010.

H. Pourvaziri and B. Naderi, A hybrid multi-population genetic algorithm for the dynamic facility layout problem, Applied Soft Computing, vol.24, pp.457-469, 2014.
DOI : 10.1016/j.asoc.2014.06.051

T. Raz and E. Michael, Use and benefits of tools for project risk management, International Journal of Project Management, vol.19, issue.1, pp.9-17
DOI : 10.1016/S0263-7863(99)00036-8

W. G. Rees, Least-cost paths in mountainous terrain, Computers & Geosciences, vol.30, issue.3, pp.203-209, 2004.
DOI : 10.1016/j.cageo.2003.11.001

N. J. Roberts, F. Nadim, and B. Kalsnes, Quantification of vulnerability to natural hazards, Georisk: Assessment and Management of Risk for Engineered Systems and Geohazards, vol.17, issue.1, pp.164-173, 2009.
DOI : 10.1177/030913259301700103

P. Rosset, A. Barszez, T. Camelbeeck, Y. Quinif, A. Sabbe et al., Mapping the local seismic hazard and its influence on built environment: case study in the Mons Basin (Hainaut, Belgium), Proceedings from the Deuxième Journée des Géographes Belges, pp.305-311, 2005.

O. Rozenfeld, R. Sacks, Y. Rosenfeld, and H. Baum, Construction Job Safety Analysis, Safety Science, vol.48, issue.4, pp.491-498, 2010.
DOI : 10.1016/j.ssci.2009.12.017

A. K. Saha, M. K. Arora, R. P. Gupta, M. L. Virdi, and E. Csaplovics, GIS???based route planning in landslide???prone areas, International Journal of Geographical Information Science, vol.5, issue.10, pp.1149-1175, 2005.
DOI : 10.1080/1365881031000072645

H. Said and K. El-rayes, Performance of global optimization models for dynamic site layout planning of construction projects. Automation in Construction, pp.71-78, 2013.

H. M. Sanad, M. A. Ammar, and M. E. Ibrahim, Optimal Construction Site Layout Considering Safety and Environmental Aspects, Journal of Construction Engineering and Management, vol.134, issue.7, pp.536-544, 2008.
DOI : 10.1061/(ASCE)0733-9364(2008)134:7(536)

A. R. Soltani, F. , and T. , A fuzzy based multi-objective path planning of construction sites. Automation in construction, pp.717-734, 2004.

A. R. Soltani, H. Tawfik, J. Y. Goulermas, and T. Fernando, Path planning in construction sites: performance evaluation of the Dijkstra, A???, and GA search algorithms, Advanced Engineering Informatics, vol.16, issue.4, pp.291-303, 2002.
DOI : 10.1016/S1474-0346(03)00018-1

V. Sousa, N. M. Almeida, and L. A. Dias, Risk-based management of occupational safety and health in the construction industry ??? Part 2: Quantitative model, Safety Science, vol.74, pp.184-194, 2015.
DOI : 10.1016/j.ssci.2015.01.003

R. Storn and K. Price, Differential evolution?a simple and efficient heuristic for global optimization over continuous spaces, Journal of Global Optimization, vol.11, issue.4, pp.341-359, 1997.
DOI : 10.1023/A:1008202821328

K. Sung, M. G. Bell, M. Seong, and S. Park, Shortest paths in a network with time-dependent flow speeds, European Journal of Operational Research, vol.121, issue.1, pp.32-39, 2000.
DOI : 10.1016/S0377-2217(99)00035-1

C. M. Tam, S. X. Zeng, and Z. M. Deng, Identifying elements of poor construction safety management in China, Safety Science, vol.42, issue.7, pp.569-586, 2004.
DOI : 10.1016/j.ssci.2003.09.001

E. A. Teo, F. Y. Ling, and A. F. Chong, Framework for project managers to manage construction safety, International Journal of Project Management, vol.23, issue.4, pp.329-341, 2005.
DOI : 10.1016/j.ijproman.2004.09.001

U. S. Administration, T. Fire, and . Series, Construction Site Fires Terminology on Disaster risk reduction. 9-1-2017, UN_ISDR, vol.290, issue.14, 2001.

J. Xu and R. G. Lathrop, Improving cost-path tracing in a raster data format, Computers & Geosciences, vol.20, issue.10, pp.1455-1465, 1994.
DOI : 10.1016/0098-3004(94)90105-8

C. Yu, J. A. Lee, and M. J. Munro-stasiuk, Research Article: Extensions to least-cost path algorithms for roadway planning, International Journal of Geographical Information Science, vol.93, issue.4, pp.361-376, 2003.
DOI : 10.1080/13658810151072912

L. Zhang, X. Zhang, and T. Ma, Management of Construction Schedules Based on Building Information Modeling Technology, pp.81-88, 2013.
DOI : 10.1007/978-1-4614-7010-6_10

S. Zolfagharian and J. Irizarry, Current Trends in Construction Site Layout Planning, Construction Research Congress 2014, pp.1723-1732, 2014.
DOI : 10.1061/9780784413517.176

P. P. Zouein and I. D. Tommelein, Dynamic Layout Planning Using a Hybrid Incremental Solution Method, Journal of Construction Engineering and Management, vol.125, issue.6, pp.400-408, 1999.
DOI : 10.1061/(ASCE)0733-9364(1999)125:6(400)

P. P. Zouein, H. Harmanani, and A. Hajar, Genetic Algorithm for Solving Site Layout Problem with Unequal-Size and Constrained Facilities, Journal of Computing in Civil Engineering, vol.16, issue.2, pp.143-151, 2002.
DOI : 10.1061/(ASCE)0887-3801(2002)16:2(143)

URL : http://www.csc.byblos.lau.edu.lb/research/papers/jcce2002.pdf