The complexity of one-machine batching problems, Discrete Applied Mathematics, vol.47, issue.2, pp.87-107, 1993. ,
DOI : 10.1016/0166-218X(93)90085-3
A survey of scheduling problems with setup times or costs, European Journal of Operational Research, vol.187, issue.3, pp.985-1032, 2008. ,
DOI : 10.1016/j.ejor.2006.06.060
A simulated annealing algorithm for the unrelated parallel machine scheduling problem, Proceedings of the 5th Biannual World Automation Congress, pp.115-120, 2002. ,
DOI : 10.1109/WAC.2002.1049430
Handbook of Scheduling: Algorithms, Models, and Performance Analysis, 2004. ,
An Evaluation of the Benefits of Integrating Run-to-Run Control With Scheduling and Dispatching Systems, IEEE Transactions on Semiconductor Manufacturing, vol.20, issue.4, pp.386-392, 2007. ,
DOI : 10.1109/TSM.2007.907612
Adaptive sampling methodology for in-line defect inspection, IEEE/SEMI Conference and Workshop on Advanced Semiconductor Manufacturing 2005., pp.25-31, 2005. ,
DOI : 10.1109/ASMC.2005.1438762
A branch and bound algorithm for the resource-constrained project scheduling problem, European Journal of Operational Research, vol.107, issue.2, pp.272-288, 1998. ,
DOI : 10.1016/S0377-2217(97)00335-4
Sharing resources among periodic and aperiodic tasks with dynamic deadlines, Proceedings 20th IEEE Real-Time Systems Symposium (Cat. No.99CB37054), pp.284-293, 1999. ,
DOI : 10.1109/REAL.1999.818856
Single-machine scheduling with advanced process control constraints, Journal of Scheduling, vol.66, issue.2, pp.1-15, 2011. ,
DOI : 10.1007/s10951-010-0215-8
Probì emes d'Ordonnancement: Modélisation, 1988. ,
Integrating Preventive Maintenance Planning and Production Scheduling for a Single Machine, IEEE Transactions on Reliability, vol.54, issue.2, pp.304-309, 2005. ,
DOI : 10.1109/TR.2005.845967
Parallel machine scheduling with release time and machine eligibility restrictions, Computers & Industrial Engineering, vol.33, issue.1-2, pp.273-276, 1997. ,
DOI : 10.1016/S0360-8352(97)00091-0
Virtual metrology technique for semiconductor manufacturing, International Joint Conference on Neural Networks, pp.5289-5293, 2006. ,
Real-time health prognosis and dynamic preventive maintenance policy for equipment under aging Markovian deterioration, International Journal of Production Research, vol.96, issue.1, pp.3351-3379, 2007. ,
DOI : 10.1002/1520-6750(198908)36:4<419::AID-NAV3220360407>3.0.CO;2-5
Virtual metrology: A solution for wafer to wafer advanced process control, IEEE International Symposium on Semiconductor Manufacturing (ISSM) 2005, pp.155-157, 2005. ,
Dual-Phase Virtual Metrology Scheme, IEEE Transactions on Semiconductor Manufacturing, vol.20, issue.4, pp.566-571, 2007. ,
DOI : 10.1109/TSM.2007.907633
Evolutionary multiobjective optimization, Wiley Interdisciplinary Reviews: Data Mining and Knowledge Discovery, vol.2, issue.5, pp.444-447, 2011. ,
DOI : 10.1002/widm.43
Recherche opérationnelle et aidè a la décision en fabrication de semi-conducteurs, pp.8-11, 2011. ,
A smart sampling algorithm to minimize risk dynamically, 2010 IEEE/SEMI Advanced Semiconductor Manufacturing Conference (ASMC), pp.307-310, 2010. ,
DOI : 10.1109/ASMC.2010.5551470
Multi-Objective Optimization Using Evolutionary Algorithms, 2001. ,
Scheduling jobs on parallel machines to minimize a regular step total cost function, Journal of Scheduling, vol.47, issue.4 ,
DOI : 10.1007/s10951-010-0203-z
URL : https://hal.archives-ouvertes.fr/emse-00613037
An exact approach for scheduling jobs with regular step cost functions on a single machine, Computers & Operations Research, vol.39, issue.5, pp.1033-1043, 2012. ,
DOI : 10.1016/j.cor.2011.06.006
URL : https://hal.archives-ouvertes.fr/emse-00613039
Automatic control in microelectronics manufacturing: Practices, challenges, and possibilities, Automatica, vol.36, issue.11, pp.361567-1603, 2000. ,
DOI : 10.1016/S0005-1098(00)00084-4
Simulated annealing: A tool for operational research, European Journal of Operational Research, vol.46, issue.3, pp.271-281, 1990. ,
DOI : 10.1016/0377-2217(90)90001-R
A survey and annotated bibliography of multiobjective combinatorial optimization, OR Spectrum, vol.22, issue.4, pp.425-460, 2000. ,
DOI : 10.1007/s002910000046
URL : https://hal.archives-ouvertes.fr/hal-00462047
Scheduling Jobs on Parallel Machines with Sequence-Dependent Family Set-up Times, The International Journal of Advanced Manufacturing Technology, vol.19, issue.12 ,
DOI : 10.1007/s001700200105
Multicriteria Design Optimization: Procedures and Applications, 1990. ,
DOI : 10.1007/978-3-642-48697-5
Test Wafer Management and Automated Wafer Sorting, 2008 IEEE/SEMI Advanced Semiconductor Manufacturing Conference, pp.322-326, 2008. ,
DOI : 10.1109/ASMC.2008.4529062
Optimal batching in a wafer fabrication facility using a multiproduct G/G/c model with batch processing, International Journal of Production Research, vol.62, issue.2, pp.275-292, 2002. ,
DOI : 10.1016/0307-904X(94)90258-5
Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey, pp.287-326, 1979. ,
DOI : 10.1016/S0167-5060(08)70356-X
A realtime equipment monitoring and fault detection system, Proceedings of Semiconductor Manufacturing Technology Workshop, pp.111-121, 1998. ,
Scheduling uniform parallel machines with machine eligibility restrictions to minimize total weighted tardiness, Proceedings of International Conference on Computer Application and System Modeling 2010, pp.165-168, 2010. ,
Job shop scheduling techniques in semiconductor manufacturing, The International Journal of Advanced Manufacturing Technology, vol.27, issue.11-12, pp.1163-1169, 2004. ,
DOI : 10.1007/s00170-004-2296-z
Job shop scheduling techniques in semiconductor manufacturing, The International Journal of Advanced Manufacturing Technology, vol.27, issue.11-12, pp.1163-1169, 2006. ,
DOI : 10.1007/s00170-004-2296-z
Fault Detection Using the k-Nearest Neighbor Rule for Semiconductor Manufacturing Processes, IEEE Transactions on Semiconductor Manufacturing, vol.20, issue.4, pp.345-354, 2007. ,
DOI : 10.1109/TSM.2007.907607
A Fab-Wide APC Sampling Application, IEEE Transactions on Semiconductor Manufacturing, vol.20, issue.4, pp.393-399, 2007. ,
DOI : 10.1109/TSM.2007.907613
An effective heuristic considering machine flexibility for parallel machine with eligibility problem, 2010 IEEE International Conference on Industrial Engineering and Engineering Management, pp.1363-1366, 2010. ,
DOI : 10.1109/IEEM.2010.5674398
Predictive maintenance supported by advanced process control (apc) opens new equipment engineering and manufacturing opportunities, 2010. ,
A Novel Virtual Metrology Scheme for Predicting CVD Thickness in Semiconductor Manufacturing, IEEE/ASME Transactions on Mechatronics, vol.12, issue.3, pp.308-316, 2007. ,
DOI : 10.1109/TMECH.2007.897275
Applications de techniques avancées de contrôle des procédés en industrie du semi-conducteur, 2009. ,
Allocation flexible des capacités pour la fabrication de semiconducteurs : Modélisation et optimisation, 2009. ,
Flexibility measures for qualification management in wafer fabs, Production Planning & Control, vol.32, issue.1, pp.81-90, 2010. ,
DOI : 10.1016/j.ejor.2007.01.052
Topology Aware Mobile Agent for Efficient Data Collection in Wireless Sensor Networks with Dynamic Deadlines, 2010 International Conference on Advances in Computer Engineering, pp.352-356, 2010. ,
DOI : 10.1109/ACE.2010.26
An Approach for Factory-Wide Control Utilizing Virtual Metrology, IEEE Transactions on Semiconductor Manufacturing, vol.20, issue.4, pp.364-375, 2007. ,
DOI : 10.1109/TSM.2007.907609
Real-time diagnosis of semiconductor manufacturing equipment using a hybrid neural network expert system, IEEE Transactions on Components, Packaging, and Manufacturing Technology: Part C, vol.20, issue.1, pp.39-47, 1997. ,
DOI : 10.1109/3476.585143
Unrelated parallel machine scheduling with setup times using simulated annealing, Robotics and Computer-Integrated Manufacturing, vol.18, issue.3-4, pp.223-231, 2002. ,
DOI : 10.1016/S0736-5845(02)00013-3
Due-date based scheduling and control policies in a multiproduct semiconductor wafer fabrication facility, IEEE Transactions on Semiconductor Manufacturing, vol.11, issue.1, pp.155-164, 1998. ,
Optimization by Simulated Annealing, Science, vol.220, issue.4598, pp.671-680, 1983. ,
DOI : 10.1126/science.220.4598.671
Mean Flow Time Minimization in Reentrant Job Shops with a Hub, Operations Research, vol.44, issue.5, pp.764-776, 1996. ,
DOI : 10.1287/opre.44.5.764
One Machine Generalized Precedence Constrained Scheduling, 1992. ,
Re-entrant lines, Queueing Systems, vol.35, issue.1-3, pp.87-110, 1993. ,
DOI : 10.1007/BF01158930
A capacity-dependence dynamic sampling strategy, IEEE International Symposium on Semiconductor Manufacturing 2003, pp.312-314, 2003. ,
A review of scheduling theory and methods for semiconductor manufacturing cluster tools, 2008 Winter Simulation Conference, pp.2127-2135, 2008. ,
DOI : 10.1109/WSC.2008.4736310
The impact of the qual-run requirements of APC on the scheduling performance in semiconductor manufacturing, 2008 IEEE International Conference on Automation Science and Engineering, pp.242-246, 2008. ,
DOI : 10.1109/COASE.2008.4626542
Parallel machine scheduling with machine availability and eligibility constraints, European Journal of Operational Research, vol.184, issue.2, pp.458-467, 2008. ,
DOI : 10.1016/j.ejor.2006.11.027
A virtual metrology scheme for predicting CVD thickness in semiconductor manufacturing, Proceedings of IEEE International Conference on Robotics and Automation, pp.1054-1059, 2006. ,
Minimizing makespans for unrelated parallel machine scheduling problems, 2009 IEEE/INFORMS International Conference on Service Operations, Logistics and Informatics, pp.107-110, 2009. ,
DOI : 10.1109/SOLI.2009.5203913
A modified shifting bottleneck heuristic for minimizing total weighted tardiness in complex job shops, Journal of Scheduling, vol.100, issue.3, pp.247-262, 2002. ,
DOI : 10.1002/jos.102
A literature review, classification and simple meta-analysis on scheduling of batch processors in semiconductor, The International Journal of Advanced Manufacturing Technology, vol.32, issue.9-10, pp.990-1001, 2006. ,
DOI : 10.1007/s00170-005-2585-1
Fundamentals of Semiconductor Fabrication, 2003. ,
Equation of State Calculations by Fast Computing Machines, The Journal of Chemical Physics, vol.21, issue.6, pp.1087-1092, 1953. ,
DOI : 10.1063/1.1699114
Nonlinear Multiobjective Optimization, 1999. ,
DOI : 10.1007/978-1-4615-5563-6
A survey of problems, solution techniques, and future challenges in scheduling semiconductor manufacturing operations, Journal of Scheduling, vol.167, issue.1, pp.583-599 ,
DOI : 10.1007/s10951-010-0222-9
URL : https://hal.archives-ouvertes.fr/emse-00613040
Introduction to Statistical Quality Control, 2004. ,
Run-to-Run Control in Semiconductor Manufacturing, 2000. ,
On the utility of run to run control in semiconductor manufacturing, 1997 IEEE International Symposium on Semiconductor Manufacturing Conference Proceedings (Cat. No.97CH36023), pp.9-12, 1997. ,
DOI : 10.1109/ISSM.1997.664523
Scheduling unrelated parallel machines to minimize total weighted tardiness, 2006 IEEE International Conference on Service Operations and Logistics, and Informatics, pp.758-763, 2006. ,
DOI : 10.1109/SOLI.2006.329085
Planning and Scheduling in Manufacturing and Services, 2009. ,
DOI : 10.1007/978-1-4419-0910-7
Scheduling with batching: A review, European Journal of Operational Research, vol.120, issue.2, pp.228-249, 2000. ,
DOI : 10.1016/S0377-2217(99)00153-8
Integrating Scheduling with Batching and Lot-Sizing: A Review of Algorithms and Complexity, Journal of the Operational Research Society, vol.43, issue.5, pp.395-406, 1992. ,
DOI : 10.1057/jors.1992.66
Dynamic, weight-based sampling algorithm, 2007 International Symposium on Semiconductor Manufacturing, pp.1-4, 2007. ,
DOI : 10.1109/ISSM.2007.4446804
Semiconductor manufacturing process control and monitoring: A fab-wide framework, Journal of Process Control, vol.16, issue.3, pp.179-191, 2006. ,
DOI : 10.1016/j.jprocont.2005.06.002
Quantitative Risk Assessment for Developmental Neurotoxic Effects, Risk Analysis, vol.56, issue.6, pp.1673-81, 2004. ,
DOI : 10.1006/taap.1994.1099
Scheduling unrelated parallel machines with resourceassignable sequence dependent setup times, 2007. ,
Scheduling a flowline manufacturing cell with sequence dependent family setup times, European Journal of Operational Research, vol.125, issue.2, pp.324-339, 2000. ,
DOI : 10.1016/S0377-2217(99)00387-2
Optimal parallel machines scheduling with machine availability and eligibility constraints, The International Journal of Advanced Manufacturing Technology, vol.156, issue.3, pp.132-139, 2008. ,
DOI : 10.1007/s00170-006-0810-1
Planning, scheduling and control systems: Why cannot they work together, Computers and Chemical Engineering, vol.26, pp.149-160, 2002. ,
Mobile Element Scheduling with Dynamic Deadlines, IEEE Transactions on Mobile Computing, vol.6, issue.4, pp.395-410, 2007. ,
DOI : 10.1109/TMC.2007.57
Accuracy and Real- Time considerations for implementing various virtual metrology algorithms, IEEE Transactions on Semiconductor Manufacturing, vol.21, issue.3, pp.426-434, 2008. ,
Optimisation Approchée en Recherche Opérationelle: Recherches Locales, Réseaux Néuronaux et Satisfaction de Contraintes, 2002. ,
Multicriteria Scheduling: Theory, Models And Algorithms, 2006. ,
URL : https://hal.archives-ouvertes.fr/hal-01067335
Scheduling Groups of Jobs on a Single Machine, Operations Research, vol.43, issue.4, pp.692-703, 1995. ,
DOI : 10.1287/opre.43.4.692
The complexity of scheduling job families about a common due date, Operations Research Letters, vol.20, issue.2, pp.65-74, 1997. ,
DOI : 10.1016/S0167-6377(96)00054-5
Scheduling semiconductor wafer fabrication, IEEE Transactions on Semiconductor Manufacturing, vol.1, issue.3, pp.115-130, 1988. ,
DOI : 10.1109/66.4384
One-machine generalized precedence constrained scheduling problems, Operations Research Letters, vol.16, issue.2, pp.87-99, 1994. ,
DOI : 10.1016/0167-6377(94)90064-7