A. Agnetis, N. G. Hall, and D. Pacciarelli, Supply chain scheduling: Sequence coordination, Discrete Applied Mathematics, vol.154, issue.15, pp.2044-2063, 2006.
DOI : 10.1016/j.dam.2005.04.019

URL : http://doi.org/10.1016/j.dam.2005.04.019

A. Allahverdi, J. N. Gupta, and T. And-aldowaisan, A review of scheduling research involving setup considerations, Omega, vol.27, issue.2, pp.219-239, 1999.
DOI : 10.1016/S0305-0483(98)00042-5

A. Allahverdi, C. T. Ng, T. C. Cheng, and M. Y. Kovalyov, A survey of scheduling problems with setup times or costs, European Journal of Operational Research, vol.187, issue.3, pp.985-1032, 2008.
DOI : 10.1016/j.ejor.2006.06.060

K. R. Baker and G. D. Scudder, Sequencing with Earliness and Tardiness Penalties: A Review, Operations Research, vol.38, issue.1, pp.22-36, 1990.
DOI : 10.1287/opre.38.1.22

P. Baptiste, Batching identical jobs, Mathematical Methods of Operations Research (ZOR), vol.52, issue.3, pp.355-367, 2000.
DOI : 10.1007/s001860000088

URL : http://citeseerx.ist.psu.edu/viewdoc/summary?doi=10.1.1.167.3350

J. Behnamian, S. M. Ghomi, F. Jolai, and O. Amirtaheri, Minimizing makespan on a three-machine flowshop batch scheduling problem with transportation using genetic algorithm, Applied Soft Computing, vol.12, issue.2, pp.768-777, 2012.
DOI : 10.1016/j.asoc.2011.10.015

R. Bhatnagar and P. Chandra, Models for multi-plant coordination, European Journal of Operational Research, vol.67, issue.2, pp.141-160, 1993.
DOI : 10.1016/0377-2217(93)90058-U

M. G. Buer, D. L. Woodruff, and R. T. Olson, Solving the medium newspaper production/distribution problem, European Journal of Operational Research, vol.115, issue.2, pp.237-253, 1999.
DOI : 10.1016/S0377-2217(98)00300-2

P. Chandra and M. L. Fisher, Coordination of production and distribution planning, European Journal of Operational Research, vol.72, issue.3, pp.503-517, 1994.
DOI : 10.1016/0377-2217(94)90419-7

Y. C. Chang and C. Y. Lee, Machine scheduling with job delivery coordination, European Journal of Operational Research, vol.158, issue.2, pp.470-487, 2004.
DOI : 10.1016/S0377-2217(03)00364-3

B. Chen and C. Y. Lee, Logistics scheduling with batching and transportation, European Journal of Operational Research, vol.189, issue.3, pp.871-876, 2008.
DOI : 10.1016/j.ejor.2006.11.047

L. Chen, N. Bostel, P. Dejax, J. G. Cai, and L. F. Xi, A tabu search algorithm for the integrated scheduling problem of container handling systems in a maritime terminal, European Journal of Operational Research, vol.181, issue.1, pp.40-58, 2007.
DOI : 10.1016/j.ejor.2006.06.033

URL : https://hal.archives-ouvertes.fr/hal-00537968

Z. L. Chen, Scheduling and common due date assignment with earliness-tardiness penalties and batch delivery costs, European Journal of Operational Research, vol.93, issue.1, pp.49-60, 1996.
DOI : 10.1016/0377-2217(95)00133-6

Z. L. Chen, Scheduling with batch setup times and earliness-tardiness penalties, European Journal of Operational Research, vol.96, issue.3, pp.518-537, 1997.
DOI : 10.1016/S0377-2217(96)00096-3

Z. L. Chen, Handbook of Quantitative Supply Chain Analysis: Modeling in the E- Business Era, 2004.

Z. L. Chen, Integrated Production and Outbound Distribution Scheduling: Review and Extensions, Operations Research, vol.58, issue.1, pp.130-148, 2010.
DOI : 10.1287/opre.1080.0688

URL : http://citeseerx.ist.psu.edu/viewdoc/summary?doi=10.1.1.521.4294

Z. L. Chen and W. B. Powell, A column generation based decomposition algorithm for a parallel machine just-in-time scheduling problem, European Journal of Operational Research, vol.116, issue.1, pp.220-232, 1999.
DOI : 10.1016/S0377-2217(98)00136-2

Z. L. Chen and G. L. Vairaktarakis, Integrated Scheduling of Production and Distribution Operations, Management Science, vol.51, issue.4, pp.614-628, 2005.
DOI : 10.1287/mnsc.1040.0325

T. C. Cheng, V. S. Gordon, and M. Y. Kovalyov, Single machine scheduling with batch deliveries, European Journal of Operational Research, vol.94, issue.2, pp.277-283, 1996.
DOI : 10.1016/0377-2217(96)00127-0

T. C. Cheng and M. C. Gupta, Survey of scheduling research involving due date determination decisions, European Journal of Operational Research, vol.38, issue.2, pp.156-166, 1989.
DOI : 10.1016/0377-2217(89)90100-8

T. C. Cheng, M. Y. Kovalyov, L. , and B. M. , Single Machine Scheduling to Minimize Batch Delivery and Job Earliness Penalties, SIAM Journal on Optimization, vol.7, issue.2, pp.547-559, 1997.
DOI : 10.1137/S1052623494269540

T. C. Cheng and C. C. Sin, A state-of-the-art review of parallel-machine scheduling research, European Journal of Operational Research, vol.47, issue.3, pp.271-292, 1990.
DOI : 10.1016/0377-2217(90)90215-W

T. C. Cheng and X. L. Wang, Machine scheduling with job class setup and delivery considerations, Computers & Operations Research, vol.37, issue.6, pp.1123-1128, 2010.
DOI : 10.1016/j.cor.2009.10.001

P. De, J. B. Ghosh, W. , and C. E. , Scheduling about a common due date with earliness and tardiness penalties, Computers & Operations Research, vol.17, issue.2, pp.231-241, 1990.
DOI : 10.1016/0305-0548(90)90046-A

P. Devapriya, W. Ferrell, and N. Geismar, Optimal fleet size of an integrated production and distribution scheduling problem for a perishable product, 2006.

G. Dobson and C. A. Yano, Cyclic scheduling to minimize inventory in a batch flow line, European Journal of Operational Research, vol.75, issue.2, pp.441-461, 1994.
DOI : 10.1016/0377-2217(94)90087-6

A. Drexl and A. Kimms, Lot sizing and scheduling ??? Survey and extensions, European Journal of Operational Research, vol.99, issue.2, pp.221-235, 1997.
DOI : 10.1016/S0377-2217(97)00030-1

S. D. Eksioglu, Optimizing integrated production, inventory and distribution problems in supply chains, 2002.

I. Elmahi, O. Grunder, and A. E. Moudni, A modelling-optimization approach for discrete event systems using the (max+) algebra and genetic algorithms, International Journal of Innovative Computing, Information and Control, vol.2, issue.4, pp.771-788, 2006.

G. Fandel and C. S. Hegene, Simultaneous lot sizing and scheduling for multi-product multi-level production, International Journal of Production Economics, vol.104, issue.2, pp.308-316, 2006.
DOI : 10.1016/j.ijpe.2005.04.011

I. Ferretti, S. Zanoni, and L. Zavanella, Production???inventory scheduling using Ant System metaheuristic, International Journal of Production Economics, vol.104, issue.2, pp.317-326, 2006.
DOI : 10.1016/j.ijpe.2005.01.008

M. L. Fisher, The Lagrangian Relaxation Method for Solving Integer Programming Problems, Management Science, vol.27, issue.1, pp.1-18, 1981.
DOI : 10.1287/mnsc.27.1.1

B. Fleischmann, The discrete lot-sizing and scheduling problem, European Journal of Operational Research, vol.44, issue.3, pp.337-348, 1990.
DOI : 10.1016/0377-2217(90)90245-7

B. Fleischmann, The discrete lot-sizing and scheduling problem with sequence-dependent setup costs, European Journal of Operational Research, vol.75, issue.2, pp.395-404, 1994.
DOI : 10.1016/0377-2217(94)90083-3

A. Frangioni, About Lagrangian Methods in Integer Optimization, Annals of Operations Research, vol.3, issue.2, pp.163-193, 2005.
DOI : 10.1007/s10479-005-3447-9

F. Fumero and C. Vercellis, Synchronized Development of Production, Inventory, and Distribution Schedules, Transportation Science, vol.33, issue.3, pp.330-340, 1999.
DOI : 10.1287/trsc.33.3.330

M. Gen and R. Cheng, Genetic algorithms and engineering design, 1997.
DOI : 10.1002/9780470172254

F. Glover, Tabu Search???Part I, ORSA Journal on Computing, vol.1, issue.3, pp.190-206, 1989.
DOI : 10.1287/ijoc.1.3.190

F. Glover, Tabu Search???Part II, ORSA Journal on Computing, vol.2, issue.1, pp.4-32, 1990.
DOI : 10.1287/ijoc.2.1.4

F. Glover, G. Jones, D. Karney, D. Klingman, and J. Mote, An Integrated Production, Distribution, and Inventory Planning System, Interfaces, vol.9, issue.5, pp.21-35, 1979.
DOI : 10.1287/inte.9.5.21

D. H. Goldberg, Genetic algorithms in search, optimization and machine learning, 1989.

H. Gong and L. X. Tang, Two-machine flowshop scheduling with intermediate transportation under job physical space consideration, Computers & Operations Research, vol.38, issue.9, pp.1267-1274, 2011.
DOI : 10.1016/j.cor.2010.10.018

V. Gordon, J. M. Proth, C. , and C. B. , A survey of the state-of-the-art of common due date assignment and scheduling research, European Journal of Operational Research, vol.139, issue.1, pp.1-25, 2002.
DOI : 10.1016/S0377-2217(01)00181-3

URL : https://hal.archives-ouvertes.fr/inria-00073236

O. Grunder, Lot sizing, delivery and scheduling of identical jobs in a single-stage supply chain, International Journal of Innovative Computing, Information and Control, vol.6, issue.8, pp.3657-3668, 2010.

J. Hahm and C. A. Yano, The economic lot and delivery scheduling problem: The single item case, International Journal of Production Economics, vol.28, issue.2, pp.235-252, 1992.
DOI : 10.1016/0925-5273(92)90036-7

N. G. Hall, W. Kubiak, and S. P. Sethi, Earliness???Tardiness Scheduling Problems, II: Deviation of Completion Times About a Restrictive Common Due Date, Operations Research, vol.39, issue.5, pp.847-856, 1991.
DOI : 10.1287/opre.39.5.847

N. G. Hall, M. A. Lesaoana, and C. N. Potts, Scheduling with Fixed Delivery Dates, Operations Research, vol.49, issue.1, pp.134-144, 2000.
DOI : 10.1287/opre.49.1.134.11192

N. G. Hall and C. N. Potts, Supply chain scheduling: Batching and delivery, Operations Research, vol.51, issue.4, pp.566-584, 2003.
DOI : 10.1287/opre.51.4.566.16106

URL : http://citeseerx.ist.psu.edu/viewdoc/summary?doi=10.1.1.2.6915

P. Hanczar, An Inventory-Distribution System with LTL Deliveries ??? Mixed Integer Approach, Procedia - Social and Behavioral Sciences, vol.20, issue.10, pp.1705-1718, 2010.
DOI : 10.1016/j.sbspro.2011.08.026

R. Hassin and M. Shani, Machine scheduling with earliness, tardiness and non-execution penalties, Computers & Operations Research, vol.32, issue.3, pp.683-705, 2005.
DOI : 10.1016/j.cor.2003.08.012

J. W. Herrmann and C. Y. Lee, On scheduling to minimize earliness-tardiness and batch delivery costs with a common due date, European Journal of Operational Research, vol.70, issue.3, pp.272-288, 1993.
DOI : 10.1016/0377-2217(93)90239-J

A. Hertz and M. Widmer, An improved tabu search approach for solving the job shop scheduling problem with tooling constraints, Discrete Applied Mathematics, vol.65, issue.1-3, pp.1-3319, 1996.
DOI : 10.1016/0166-218X(95)00040-X

J. H. Holland, Adaptation in natural and artificial systems, 1975.

S. K. Iyer and B. Saxena, Improved genetic algorithm for the permutation flowshop scheduling problem, Computers & Operations Research, vol.31, issue.4, pp.593-606, 2004.
DOI : 10.1016/S0305-0548(03)00016-9

J. H. Kang and Y. D. Kim, Coordination of inventory and transportation managements in a two-level supply chain, International Journal of Production Economics, vol.123, issue.1, pp.137-145, 2010.
DOI : 10.1016/j.ijpe.2009.07.008

R. M. Karp, Reducibility among combinatorial problems, complexity of computer computations, 1972.

C. Koulamas, The single-machine total tardiness scheduling problem: Review and extensions, European Journal of Operational Research, vol.202, issue.1, pp.1-7, 2010.
DOI : 10.1016/j.ejor.2009.04.007

V. Lauff and F. Werner, Scheduling with common due date, earliness and tardiness penalties for multi-machine problems: A survey, Mathematical and Computer Modelling, vol.40, pp.5-6637, 2004.

C. Y. Lee and Z. L. Chen, Machine scheduling with transportation considerations, Journal of Scheduling, vol.39, issue.1, pp.3-24, 2001.
DOI : 10.1002/1099-1425(200101/02)4:1<3::AID-JOS57>3.0.CO;2-D

I. Lee, Artificial intelligence search methods for multi-machine two-stage scheduling with due date penalty, inventory, and machining costs, Computers & Operations Research, vol.28, issue.9, pp.835-852, 2001.
DOI : 10.1016/S0305-0548(00)00011-3

I. S. Lee and S. H. Yoon, Coordinated scheduling of production and delivery stages with stage-dependent inventory holding costs, Omega, vol.38, issue.6, pp.509-521, 2010.

M. A. Lejeune, A variable neighborhood decomposition search method for supply chain management planning problems, European Journal of Operational Research, vol.175, issue.2, pp.959-976, 2006.
DOI : 10.1016/j.ejor.2005.05.021

E. Levner, V. Kats, D. A. Pablo, and T. C. Cheng, Complexity of cyclic scheduling problems: A state-of-the-art survey, Computers & Industrial Engineering, vol.59, issue.2, pp.352-361, 2010.
DOI : 10.1016/j.cie.2010.03.013

C. L. Li and J. W. Ou, Machine scheduling with pickup and delivery, Naval Research Logistics, vol.35, issue.7, pp.617-630, 2005.
DOI : 10.1002/nav.20101

C. L. Li, G. Vairaktarakis, L. , and C. Y. , Machine scheduling with deliveries to multiple customer locations, European Journal of Operational Research, vol.164, issue.1, pp.39-51, 2005.
DOI : 10.1016/j.ejor.2003.11.022

S. S. Li and J. J. Yuan, Scheduling with families of jobs and delivery coordination under job availability, Theoretical Computer Science, vol.410, issue.47-49, pp.47-494856, 2009.
DOI : 10.1016/j.tcs.2009.06.025

S. S. Li, J. J. Yuan, F. , and B. Q. , Unbounded parallel-batch scheduling with family jobs and delivery coordination, Information Processing Letters, vol.111, issue.12, pp.111575-582, 2011.
DOI : 10.1016/j.ipl.2011.03.014

C. H. Liu, Using genetic algorithms for the coordinated scheduling problem of a batching machine and two-stage transportation, Applied Mathematics and Computation, vol.217, issue.24, pp.10095-10104, 2011.
DOI : 10.1016/j.amc.2011.05.005

P. H. Liu and X. W. Lu, An improved approximation algorithm for single machine scheduling with job delivery, Theoretical Computer Science, vol.412, issue.3, pp.270-274, 2011.
DOI : 10.1016/j.tcs.2010.09.025

S. G. Liu, On the integrated production, inventory and distribution routing problem, 2003.

P. H. Thesis, The State University of New Jersey

L. F. Lu, J. J. Yuan, and L. Q. Zhang, Single machine scheduling with release dates and job delivery to minimize the makespan, Theoretical Computer Science, vol.393, issue.1-3, pp.1-3102, 2008.
DOI : 10.1016/j.tcs.2007.11.008

S. Martello and P. Toth, Lower bounds and reduction procedures for the bin packing problem, Discrete Applied Mathematics, vol.28, issue.1, pp.59-70, 1990.
DOI : 10.1016/0166-218X(90)90094-S

M. M. Mazdeh, M. Sarhadi, and K. S. Hindi, A branch-and-bound algorithm for single-machine scheduling with batch delivery minimizing flow times and delivery costs, European Journal of Operational Research, vol.183, issue.1, pp.74-86, 2007.
DOI : 10.1016/j.ejor.2006.09.087

M. M. Mazdeh, S. Shashaani, A. Ashouri, and K. S. Hindi, Single-machine batch scheduling minimizing weighted flow times and delivery costs, Applied Mathematical Modelling, vol.35, issue.1, pp.563-570, 2011.
DOI : 10.1016/j.apm.2010.07.023

URL : http://doi.org/10.1016/j.apm.2010.07.023

J. Min, Y. He, and T. C. Cheng, Batch delivery scheduling with batch delivery cost on a single machine, European Journal of Operational Research, vol.176, issue.2, pp.745-755, 2007.

S. Mouret, I. E. Grossmann, and P. Pestiaux, A new Lagrangian decomposition approach applied to the integration of refinery planning and crude-oil scheduling, Computers & Chemical Engineering, vol.35, issue.12, pp.352750-2766, 2011.
DOI : 10.1016/j.compchemeng.2011.03.026

C. A. Mndez, J. Cerda, I. E. Grossmann, I. Harjunkoski, and M. Fahl, State-of-theart review of optimization methods for short-term scheduling of batch processes, Computers and Chemical Engineering, vol.30, pp.6-7913, 2006.

S. M. Neiro, Lagrangean decomposition applied to multiperiod planning of petroleum refineries under uncertainty, Latin American Applied Research, vol.36, issue.4, pp.213-220, 2006.

J. Ouenniche and F. F. Boctor, The two-group heuristic to solve the multi-product, economic lot sizing and scheduling problem in flow shops, European Journal of Operational Research, vol.129, issue.3, pp.539-554, 2001.
DOI : 10.1016/S0377-2217(99)00466-X

J. C. Pan, J. S. Chen, and H. L. Cheng, A heuristic approach for singlemachine scheduling with due dates and class setups, Computers and Operations Research, issue.11, pp.281111-1130, 2001.

S. S. Panwalkar, M. L. Smith, and A. Seidmann, Common Due Date Assignment to Minimize Total Penalty for the One Machine Scheduling Problem, Operations Research, vol.30, issue.2, pp.391-399, 1982.
DOI : 10.1287/opre.30.2.391

H. Pirkul and V. Jayaraman, A multi-commodity, multi-plant, capacitated facility location problem: formulation and efficient heuristic solution, Computers & Operations Research, vol.25, issue.10, pp.868-878, 1998.
DOI : 10.1016/S0305-0548(97)00096-8

P. W. Poon and J. N. Carter, Genetic algorithm crossover operators for ordering applications, Computers & Operations Research, vol.22, issue.1, pp.135-147, 1995.
DOI : 10.1016/0305-0548(93)E0024-N

C. N. Potts, Technical Note???Analysis of a Heuristic for One Machine Sequencing with Release Dates and Delivery Times, Operations Research, vol.28, issue.6, pp.1436-1441, 1980.
DOI : 10.1287/opre.28.6.1436

C. N. Potts and M. Y. Kovalyov, Scheduling with batching: A review, European Journal of Operational Research, vol.120, issue.2, pp.228-249, 2000.
DOI : 10.1016/S0377-2217(99)00153-8

C. N. Potts and L. N. Wassenhove, Integrating Scheduling with Batching and Lot-Sizing: A Review of Algorithms and Complexity, Journal of the Operational Research Society, vol.43, issue.5, pp.395-406, 1992.
DOI : 10.1057/jors.1992.66

G. Pundoor and Z. L. Chen, Scheduling a production-distribution system to optimize the tradeoff between delivery tardiness and total distribution cost, Naval Research Logistics, issue.6, pp.52571-589, 2005.

G. Pundoor and Z. L. Chen, Joint cyclic production and delivery scheduling in a two-stage supply chain, International Journal of Production Economics, vol.119, issue.1, pp.55-74, 2009.
DOI : 10.1016/j.ijpe.2009.01.007

X. Qi, A logistics scheduling model: Inventory cost reduction by batching, Naval Research Logistics, vol.43, issue.4, pp.312-320, 2005.
DOI : 10.1002/nav.20078

X. Qi, Production scheduling with supply and delivery considerations to minimize the makespan, European Journal of Operational Research, vol.194, issue.3, pp.743-752, 2009.

G. Rabadi, M. Mollaghasemi, A. , and G. C. , A branch-and-bound algorithm for the early/tardy machine scheduling problem with a common due-date and sequencedependent setup time, Computers and Operations Research, issue.10, pp.311727-1751, 2004.

M. A. Rodriguez and A. Vecchietti, Inventory and delivery optimization under seasonal demand in the supply chain, Computers & Chemical Engineering, vol.34, issue.10, pp.1705-1718, 2010.
DOI : 10.1016/j.compchemeng.2010.02.009

A. M. Sarmiento and R. Nagi, A review of integrated analysis of productiondistribution systems, IIE Transactions, issue.11, pp.311061-1074, 1999.

T. Sawik, Coordinated supply chain scheduling, International Journal of Production Economics, vol.120, issue.2, pp.437-451, 2009.
DOI : 10.1016/j.ijpe.2008.08.059

A. Seidmann, S. S. Panwalkar, and M. L. Smith, Optimal assignment of due-dates for a single processor scheduling problem, International Journal of Production Research, vol.23, issue.872, pp.393-399, 1982.
DOI : 10.1080/00207548108956667

E. Selvarajah and G. Steiner, Approximation Algorithms for the Supplier's Supply Chain Scheduling Problem to Minimize Delivery and Inventory Holding Costs, Operations Research, vol.57, issue.2, pp.426-438, 2009.
DOI : 10.1287/opre.1080.0622

A. Soukhal, A. Oulamara, and P. Martineau, Complexity of flow shop scheduling problems with transportation constraints, European Journal of Operational Research, vol.161, issue.1, pp.32-41, 2005.
DOI : 10.1016/j.ejor.2003.03.002

C. S. Sung and Y. H. Kim, Minimizing makespan in a two-machine flowshop with dynamic arrivals allowed, Computers & Operations Research, vol.29, issue.3, pp.275-294, 2002.
DOI : 10.1016/S0305-0548(00)00071-X

W. Supithak, S. D. Liman, and E. J. Montes, Lot-sizing and scheduling problem with earliness tardiness and setup penalties, Computers & Industrial Engineering, vol.58, issue.3, pp.363-372, 2010.
DOI : 10.1016/j.cie.2008.10.005

L. X. Tang and H. Gong, A hybrid two-stage transportation and batch scheduling problem, Applied Mathematical Modelling, vol.32, issue.12, pp.2467-2479, 2008.
DOI : 10.1016/j.apm.2007.09.028

L. X. Tang and H. Gong, The coordination of transportation and batching scheduling, Applied Mathematical Modelling, vol.33, issue.10, pp.3854-3862, 2009.
DOI : 10.1016/j.apm.2009.01.002

L. X. Tang, J. Y. Liu, A. Y. Rong, and Y. , A review of planning and scheduling systems and methods for integrated steel production, European Journal of Operational Research, vol.133, issue.1, pp.1-20, 2001.
DOI : 10.1016/S0377-2217(00)00240-X

L. X. Tang and P. Liu, Flowshop scheduling problems with transportation or deterioration between the batching and single machines, Computers & Industrial Engineering, vol.56, issue.4, pp.1289-1295, 2009.
DOI : 10.1016/j.cie.2008.07.022

L. X. Tang and P. Liu, Two-machine flowshop scheduling problems involving a batching machine with transportation or deterioration consideration, Applied Mathematical Modelling, vol.33, issue.2, pp.1187-1199, 2009.
DOI : 10.1016/j.apm.2008.01.013

D. J. Thomas and P. M. Griffin, Coordinated supply chain management, European Journal of Operational Research, vol.94, issue.1, pp.1-15, 1996.
DOI : 10.1016/0377-2217(96)00098-7

S. A. Torabi, S. M. Ghomi, and B. Karimi, A hybrid genetic algorithm for the finite horizon economic lot and delivery scheduling in supply chains, European Journal of Operational Research, vol.173, issue.1, pp.173-189, 2006.
DOI : 10.1016/j.ejor.2004.11.012

G. Q. Wang and T. C. Cheng, Parallel machine scheduling with batch delivery costs, International Journal of Production Economics, vol.68, issue.2, pp.177-183, 2000.
DOI : 10.1016/S0925-5273(99)00105-X

H. F. Wang and K. Y. Wu, Hybrid genetic algorithm for optimization problems with permutation property, Computers & Operations Research, vol.31, issue.14, pp.312453-2471, 2004.
DOI : 10.1016/S0305-0548(03)00198-9

L. Wang and G. Q. Wang, Supply chain scheduling with deadlines, International Conference on Advanced Management Science (ICAMS), pp.662-655, 2010.

Q. Wang, R. Batta, and R. J. Szczerba, Sequencing the processing of incoming mail to match an outbound truck delivery schedule, Computers & Operations Research, vol.32, issue.7, pp.1777-1791, 2005.
DOI : 10.1016/j.cor.2003.11.029

X. L. Wang and T. C. Cheng, Heuristics for parallel-machine scheduling with job class setups and delivery to multiple customers, International Journal of Production Economics, vol.119, issue.1, pp.199-206, 2009.
DOI : 10.1016/j.ijpe.2009.02.005

X. L. Wang and T. C. Cheng, Logistics scheduling to minimize inventory and transport costs, International Journal of Production Economics, vol.121, issue.1, pp.266-273, 2009.
DOI : 10.1016/j.ijpe.2009.05.007

X. L. Wang and T. C. Cheng, Production scheduling with supply and delivery considerations to minimize the makespan, European Journal of Operational Research, vol.194, issue.3, pp.743-752, 2009.
DOI : 10.1016/j.ejor.2007.12.033

S. T. Webster and K. R. Baker, Scheduling Groups of Jobs on a Single Machine, Operations Research, vol.43, issue.4, pp.692-703, 1995.
DOI : 10.1287/opre.43.4.692

K. L. Xu, Z. R. Feng, and K. L. Jun, A tabu-search algorithm for scheduling jobs with controllable processing times on a single machine to meet due-dates, Computers & Operations Research, vol.37, issue.11, pp.1924-1938, 2010.
DOI : 10.1016/j.cor.2009.11.012

X. Yang, Scheduling with generalized batch delivery dates and earliness penalties, IIE Transactions, vol.18, issue.8, pp.735-741, 2000.
DOI : 10.1287/moor.15.3.483

W. K. Yeung, T. M. Choi, and T. C. Cheng, Supply chain scheduling and coordination with dual delivery modes and inventory storage cost, International Journal of Production Economics, vol.132, issue.2, pp.223-229, 2011.
DOI : 10.1016/j.ijpe.2011.04.012

J. J. Yuan, A note on the complexity of single-machine scheduling with a common due date, earliness-tardiness, and batch delivery costs, European Journal of Operational Research, vol.94, issue.1, pp.203-205, 1996.
DOI : 10.1016/0377-2217(95)00168-9

S. Zdrzalka, Analysis of approximation algorithms for single-machine scheduling with delivery times and sequence independent batch setup times, European Journal of Operational Research, vol.80, issue.2, pp.371-380, 1995.
DOI : 10.1016/0377-2217(93)E0160-Y

Q. H. Zhao, S. Chen, S. C. Leung, L. , and K. K. , Integration of inventory and transportation decisions in a logistics system, Transportation Research Part E: Logistics and Transportation Review, vol.46, issue.6, pp.46913-925, 2010.
DOI : 10.1016/j.tre.2010.03.001

W. Y. Zhong, Z. L. Chen, C. , and M. , Integrated production and distribution scheduling with committed delivery dates, Operations Research Letters, vol.38, issue.2, pp.133-138, 2010.
DOI : 10.1016/j.orl.2009.11.007

W. Y. Zhong, G. Dosa, and Z. Y. Tan, On the machine scheduling problem with job delivery coordination, European Journal of Operational Research, vol.182, issue.3, pp.1057-1072, 2007.
DOI : 10.1016/j.ejor.2006.09.059