Agnetis. Scheduling no-wait robotic cells with two and three machines, 1997. ,
Part sequencing in three-machine no-wait robotic cells, Operations Research Letters, vol.27, issue.4, 1998. ,
DOI : 10.1016/S0167-6377(00)00046-8
Batch scheduling in a two-machine cell with swapping devices, 1994. ,
Network flows, theory, algorithms , and applications, 1993. ,
Vehicle scheduling in two-cycle flexible manufacturing systems, Mathematical and Computer Modelling, vol.20, issue.2, pp.19-31, 1994. ,
DOI : 10.1016/0895-7177(94)90203-8
Scheduling under resource constraints: deterministic models, 1987. ,
Scheduling computer and manufacturing processes, 1996. ,
Scheduling with resource management in manufacturing systems, European Journal of Operational Research, vol.76, issue.1, pp.1-14, 1994. ,
DOI : 10.1016/0377-2217(94)90002-7
Scheduling vehicles in a cyclic flexible flowshop, European Journal of Automation Journal Européen des Systèmes Automatisés -APII-JESA, vol.32, issue.4, pp.441-451, 1998. ,
ContributionàContributionà l'ordonnancement dynamique de lignes de traitement de surface, Thèse de doctorat, Université de Franche-Comté, U.F.R. Sciences et Techniques, 1999. ,
Notation et typologie duprobì eme de l'ordonnancement d'une ligne de traitement de surface (Hoist Scheduling Problem ) InDeuxì eme congrès de la société Française de Recherche Opérationnelle et Aidè a la Décision, 1999. ,
Cyclic scheduling in a robotic flowshop, Proceedings International Conference on Industrial Engineering and Production Management (IEPM'97), pp.439-449, 1997. ,
On cycles and permutations in robotic cells. Internal Note, 1998. ,
On A Conjecture About Robotic Cells: New Simplified Proof For The Three-Machine Case, INFOR: Information Systems and Operational Research, vol.37, issue.1, pp.20-36, 1999. ,
DOI : 10.1080/03155986.1999.11732366
Cycles and permutations in robotic cells, Mathematical and Computer Modelling, vol.34, issue.5-6, 1999. ,
DOI : 10.1016/S0895-7177(01)00084-X
Optimal moves of the material handling system in a robotic flow-shop, Proceedings International Conference on Industrial Engineering and Production Management (IEPM'99), pp.409-417, 1999. ,
Atelier en ligne robotisé avec zones de stockage, European Journal of Automation Journal Européen des Systèmes Automatisés -APII-JESA, vol.32, issue.78, pp.875-891, 1998. ,
Cyclic hoist scheduling based on graph theory, IEEE Symposium on emerging technologies and factory automation, 1995. ,
Sequencing of Parts in Robotic Cells, International Journal of Flexible Manufacturing Systems, vol.9, issue.1, pp.81-103, 1997. ,
DOI : 10.1023/A:1007930010707
Scheduling theory and its applications, 1997. ,
Heuristic procedures for minimizing makespan and the number of required pallets, European Journal of Operational Research, vol.86, issue.3, pp.491-502, 1995. ,
DOI : 10.1016/0377-2217(94)00059-L
URL : https://hal.archives-ouvertes.fr/inria-00074745
Combinatorial optimization models for production scheduling in automated manufacturing systems, European Journal of Operational Research, vol.99, issue.1, pp.136-153, 1997. ,
DOI : 10.1016/S0377-2217(96)00388-8
Cyclic scheduling in robotic flowshops, Annals of Operations Research: Mathematics of Industrial Systems, 1999. ,
Cyclic scheduling in 3-machine robotic flow shops, Journal of Scheduling, vol.26, issue.1, 1997. ,
DOI : 10.1002/(SICI)1099-1425(199901/02)2:1<35::AID-JOS15>3.0.CO;2-J
Cyclic Scheduling of Identical Parts in a Robotic Cell, Operations Research, vol.45, issue.6, pp.952-965, 1997. ,
DOI : 10.1287/opre.45.6.952
Robotic flowshop scheduling is strongly NP-complete, CWI Tract 122, pp.277-286, 1997. ,
Cyclic scheduling in 3-machine robotic flow shops, Journal of Scheduling, vol.26, issue.1, pp.35-54, 1999. ,
DOI : 10.1002/(SICI)1099-1425(199901/02)2:1<35::AID-JOS15>3.0.CO;2-J
Flow-shop et extensions : chevauchement des tâches, indisponibilité des machines et système de transport, Thèse de doctorat, 1998. ,
Robotic cells with buffer space, Proceedings ECCO IX, Conference of the European Chapter on Combinatorial Optimization, 9 pages unnumbered, 1996. ,
Design and operational issues in AGV-served manufacturing systems. Working Paper, pp.95-108, 1995. ,
Computers and intractability, A guide to the theory of NP-completeness, 1979. ,
The Complexity of Flowshop and Jobshop Scheduling, Mathematics of Operations Research, vol.1, issue.2, pp.117-129, 1976. ,
DOI : 10.1287/moor.1.2.117
Sequencing a One State-Variable Machine: A Solvable Case of the Traveling Salesman Problem, Operations Research, vol.12, issue.5, pp.655-679, 1964. ,
DOI : 10.1287/opre.12.5.655
Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey, Annals of Discrete Mathematics, vol.5, pp.169-231, 1979. ,
DOI : 10.1016/S0167-5060(08)70356-X
The relationship between the physical layout of the work stations and the productivity of a saturated single-hoist production line, International Journal of Production Research, vol.35, issue.8, pp.2189-2211, 1997. ,
DOI : 10.1080/002075497194804
Scheduling in robotic cells : Two machine cells and identical parts. Working Paper, pp.93-99, 1993. ,
Scheduling in robotic cells: Large cells. Working Paper 93-07, 1993. ,
Scheduling in Robotic Cells: Classification, Two and Three Machine Cells, Operations Research, vol.45, issue.3, pp.421-439, 1997. ,
DOI : 10.1287/opre.45.3.421
A Survey of Machine Scheduling Problems with Blocking and No-Wait in Process, Operations Research, vol.44, issue.3, pp.510-525, 1996. ,
DOI : 10.1287/opre.44.3.510
Ordonnancement cyclique d'un robot sur une ligne de galvanoplastie : modèles et algorithmes, 1993. ,
Private communication, 1999. ,
On a scheduling problem in a robotized analytical system, Discrete Applied Mathematics, vol.65, issue.1-3, pp.285-318, 1996. ,
DOI : 10.1016/0166-218X(95)00039-T
Flow-shop problems with transportation times and a single robot, Working Paper, vol.201, 1998. ,
Schedule efficiency in a robotic production cell, International Journal of Flexible Manufacturing Systems, vol.23, issue.1, pp.5-26, 1995. ,
DOI : 10.1007/BF01324877
Optimal two- and three-stage production schedules with setup times included, Naval Research Logistics Quarterly, vol.1, issue.1, pp.61-68, 1954. ,
DOI : 10.1002/nav.3800010110
Scheduling in robotic cells: heuristics and cell design. Working Paper 93-08, 1994. ,
A characterization of the minimum cycle mean in a digraph, Discrete Mathematics, vol.23, issue.1, pp.309-311, 1978. ,
DOI : 10.1016/0012-365X(78)90078-X
ROBOT TASK SCHEDULING IN A FLEXIBLE MANUFACTURING CELL, IIE Transactions, vol.25, issue.2, pp.80-87, 1993. ,
DOI : 10.1080/07408179308964280
On an automated two-machine flowshop scheduling problem with infinite buffer, Journal of the Operations Research Society of Japan, vol.34, issue.3, pp.354-361, 1991. ,
Optimal cyclic scheduling for automated two-machine flowshops with no buffer, Symposium on Flexible Automation, 1990. ,
Automated Two-machine Flowshop Scheduling: A Solvable Case, IIE Transactions, vol.27, issue.1, pp.10-16, 1991. ,
DOI : 10.1057/jors.1972.52
A polynomial algorithm for scheduling small-scale manufacturing cells served by multiple robots, Computers & Operations Research, vol.25, issue.1, pp.53-62, 1998. ,
DOI : 10.1016/S0305-0548(98)80008-7
On the optimal cyclic schedules of single hoist electroplating processes. Working Paper 89-06, 1989. ,
A proof: the cyclic hoist-scheduling problem is NPcomplete . Working Paper #89-0016, 1989. ,
The Minimum Common-Cycle Algorithm for Cyclic Scheduling of Two Material Handling Hoists with Time Window Constraints, Management Science, vol.37, issue.12, pp.1629-1639, 1991. ,
DOI : 10.1287/mnsc.37.12.1629
Fuzzy periodic scheduling of a production line with a robot. Working Paper, Center for Technology and Education ,
´ Etat de l'art : ordonnancement de robots de manutention en galvanoplastie. RAIRO -APII, pp.7-35, 1994. ,
Some complexity results in cyclic scheduling, Mathematical and Computer Modelling, vol.20, issue.2, pp.107-122, 1994. ,
DOI : 10.1016/0895-7177(94)90210-0
Determining the optimal number of duplicated process tanks in a single-hoist circuit board production line, Computers & Industrial Engineering, vol.28, issue.4, pp.681-688, 1995. ,
DOI : 10.1016/0360-8352(95)98201-K
A branch and bound algorithm for hoist scheduling of a circuit board production line, International Journal of Flexible Manufacturing Systems, vol.20, issue.1, pp.45-65, 1996. ,
DOI : 10.1007/BF00167800
Flowshop scheduling with limited temporary storage, Journal of the ACM, vol.27, issue.3, pp.533-549, 1980. ,
DOI : 10.1145/322203.322213
Mathematical Programming Solution of a Hoist Scheduling Program, A I I E Transactions, vol.39, issue.2, pp.219-225, 1976. ,
DOI : 10.1080/05695557608975070
Scheduling, theory, algorithms and systems, 1995. ,
Sequencing of parts and robot moves in a robotic cell, International Journal of Flexible Manufacturing Systems, vol.29, issue.4, pp.331-358, 1992. ,
DOI : 10.1007/BF01324886
Hoist Scheduling For A PCB Electroplating Facility, IIE Transactions, vol.28, issue.2, pp.157-167, 1988. ,
DOI : 10.1080/07408178808966165
An example for scheduling a chemical processing tank line, IEEE Symposium on Emerging Technologies and Factory Automation, pp.475-482, 1995. ,
An algorithm for scheduling a chemical processing tank line. Production Planning and Control, pp.323-332, 1993. ,
On non-permutation solutions to some two machine flow shop scheduling problems, ZOR Zeitschrift f???r Operations Research Mathematical Methods of Opeartions Research, vol.11, issue.3, pp.305-319, 1994. ,
DOI : 10.1007/BF01435460
Optimally sequencing of double-gripper gantry robot moves in tightly-coupled serial production systems, 1995. ,
Scheduling theory. Multistage systems, 1994. ,
Scheduling theory. Singlestage systems, 1994. ,
Scheduling problems in automated manufacturing, 1996. ,
Les probl??mes d'ordonnancement de type flow-shop hybride : ??tat de l'art, RAIRO - Operations Research, vol.33, issue.2, pp.117-183, 1999. ,
DOI : 10.1051/ro:1999108