K. Aardal, Y. Pochet, and L. Wolsey, Capacitated Facility Location: Valid Inequalities and Facets, Mathematics of Operations Research, vol.20, issue.3, p.562582, 1995.
DOI : 10.1287/moor.20.3.562

J. Achacoso and G. Pisapia, Partnering for the integration of equipment recipe services into an automated factory, Proceedings of SEMI Advanced Semiconductor Manufacturing Conference and Workshop, p.101104, 1995.
DOI : 10.1109/ASMC.1995.484349

J. Adams, E. Balas, and D. Zawack, The Shifting Bottleneck Procedure for Job Shop Scheduling, Management Science, vol.34, issue.3, p.391401, 1988.
DOI : 10.1287/mnsc.34.3.391

Z. Ak³in, F. Karaesmen, and L. Örmeci, On the interaction between resource exibility and exibility structures, Fifth international conference on analysis of manufacturing systems (Greece, 2005.

L. Armijo, Minimization of function having Lipschitz continuous rst partial derivates, Pacic Journal of Mathematics, vol.16, p.13, 1966.

C. Artigues, S. Dauzère-pérès, A. Derreumaux, O. Sibille, Y. et al., A batch optimization solver for diusion area scheduling in semiconductor manufacturing, IFAC Symposium on Information Control Problems in Manufacturing, pp.733-738, 2006.

A. Aubry, M. Espinouse, M. Jacomino, and B. And-raison, About conguration under uncertainty of a power distribution network, INCOM' 2006, p.383388, 2006.

A. Aubry, A. Rossi, M. Espinouse, and J. , Minimizing setup costs for parallel multi-purpose machines under load-balancing constraint, European Journal of Operational Research, vol.187, issue.3, p.11151125, 2008.
DOI : 10.1016/j.ejor.2006.05.050

E. Balas, E. Lenstra, and A. Vazacopoulos, The one machine problem with delayed precedence constraints and tis use in job shop scheduling, Management Science, vol.41, p.94109, 1995.

G. Barna, APC in the semiconductor industry, history and near term prognosis, IEEE/SEMI 1996 Advanced Semiconductor Manufacturing Conference and Workshop. Theme-Innovative Approaches to Growth in the Semiconductor Industry. ASMC 96 Proceedings, p.364369, 1996.
DOI : 10.1109/ASMC.1996.558084

B. Tal, A. Nemirovski, and A. , Robust solutions of linear programming problems contaminated with uncertain data, Mathematical Programming, vol.88, p.411424, 2000.

B. Tal, A. Nemirovski, and A. , Robust optimization -methodoly and applications, Mathematical Programming, vol.92, p.453480, 2002.

D. Bertsimas and M. Sim, The Price of Robustness, Operations Research, vol.52, issue.1, p.3553, 2002.
DOI : 10.1287/opre.1030.0065

D. Bertsimas and M. Sim, Robust optimization -methodoly and applications, Mathematical Programming, vol.98, p.4971, 2003.

J. Bªa»ewicz, K. Ecker, E. Pesch, G. Schmidt, and J. We-glarz, Handbook on scheduling, 2007.

J. Browne, Classication of exible manufacturing systems, The FMS Magazine, p.114117, 1984.

P. Brucker, J. Hurink, B. Jurisch, and W. , A branch & bound algorithm for the open-shop problem, Discrete Applied Mathematics, vol.76, issue.1-3, p.4359, 1997.
DOI : 10.1016/S0166-218X(96)00116-3

M. Bureau, S. Dauzère-pérès, C. Yugma, L. Vermarien, M. et al., Simulation results and formalism for global-local scheduling in se- BIBLIOGRAPHIE miconductor manufacturing facilities, Winter Simulation Conference, p.17681773, 2007.

S. Das, The measurement of exibility in manufacturing systems, The International Journal of Flexible Manufacturing Systems, p.6793, 1996.

S. Dauzère-pérès and J. Lasserre, A modied shifting bottleneck procedure for job shop scheduling, International Journal of Production Research, p.923932, 1993.

A. De-ron, R. , and J. , Equipment eectiveness : OEE revisited, IEEE Transaction on semiconductor manufacturing, vol.18, 2005.

D. Toni, A. Tonchia, and S. , Manufacturing exibility : a literature review, International Journal of Production Research, p.15871617, 1998.

D. Toni, A. Tonchia, and S. , Performance measurement systems : Models, characteristics and measures, International Journal of Operations & Production Management, p.4671, 2001.

S. Deffree, July chip sales grow as 300mm crossover continues, Electronics Design, 2008.

S. Ding, J. Yi, and M. Zhang, Multicluster Tools Scheduling: An Integrated Event Graph and Network Model Approach, IEEE Transactions on Semiconductor Manufacturing, vol.19, issue.3, p.339351, 2006.
DOI : 10.1109/TSM.2006.879414

H. Ford, My life and work, 1922.

M. Fuchs, C. Muscogiuri, C. Niederée, and M. Hemmje, An open framework for integrated qualication management portals, 13th International Workshop on Database and Expert Systems Applications, p.15, 2002.

M. Garey, J. , and D. , Computers and Intractability : A guide to the Theory of NP-completeness, 1979.

M. Garey, D. Johnson, and R. Sethi, The complexity of owshop and jobshop scheduling, Mathematics of Operations Research, vol.1, p.117129, 1976.

E. Giachetti, L. Martinez, O. Sáenz, C. , and C. , Analysis of the structural measures of exibility and agility using a measurement theoretical framework, International Journal of Production Economics, vol.1, p.4762, 2002.

F. Glover, Tabu search part I, ORSA Journal on Computing, vol.1, 1989.

F. Glover, Tabu Search???Part II, ORSA Journal on Computing, vol.2, issue.1, p.432, 1990.
DOI : 10.1287/ijoc.2.1.4

F. Glover, E. Taillard, and D. De-werra, A user's guide to tabu search, Annals of Operations Research, vol.17, issue.1, p.328, 1993.
DOI : 10.1007/BF02078647

F. Goodwin, Trends in the costs of photolithography development and outlook for the future, Tech. rep, 2005.

W. Gorton, The Genesis Of The Transistor, Proceedings of the IEEE, vol.86, issue.1, p.5052, 1998.
DOI : 10.1109/JPROC.1998.658758

S. Graves, T. , and B. , Process exibility in supply chains, Management Science, vol.7, p.907919, 2003.

C. Gueret, N. Jussien, and C. Prins, Using intellegent backtracking to improve branch and bound methods : An application to open shop problems

I. Habenicht and L. Mönch, A nite-capacity beam-search algorithm for production scheduling in semiconductor manufacturing, Proceedings of the 2002 Winter Simulation Conference, pp.1406-1413, 2002.

M. Hachman, Intel, Samsung, TSMC plan shift to 450 mm wafers, PC Magazine, 2008.

A. Hand, ISMI updates goals, challenges of 450 mm wafers. Semiconductor International, 2008.

P. Hansen and N. Mladenovi¢, Variable neighborhood search for the p-median, Location Science, vol.5, issue.4, p.207226, 1997.
DOI : 10.1016/S0966-8349(98)00030-8

A. Hofkamp, R. , and J. , Chi reference manual, 2002.

W. Hopp and M. Spearman, Factory Physics : Foundations of Manufacturing Management, 2001.

W. Hoyer, Variants of the reduced Newton method for nonlinear equality constrained optimiwation problems, Optimization, vol.17, p.757774, 1986.

M. Imai and . Kaizen, The key to Japan's competetive success, 1986.

J. Jacobs, L. Etman, E. Van-campen, R. , and J. , Characterization of operational time variability using eective process time, IEEE Transactions on Semiconductor manufacturing, vol.16, p.511520, 2003.

C. Johnzén, Robust optimisation of the capcitated location problem, KTH, 2005.

C. Johnzén, S. Dauzère-pérès, and V. , Flexibility measures for qualications management in wafer fabs, Production Planning & Control, 2009.

C. Johnzén, S. Dauzère-pérès, and P. Vialletelle, Flexibility measures for machine qualication management, In Roadef, p.249250, 2007.

C. Johnzén, S. Dauzère-pérès, and P. Vialletelle, Flexibility models for capacity allocation in semiconductor fabrication, MOSIM'08, 2008.

C. Johnzén, S. Dauzère-pérès, P. Vialletelle, Y. , and C. , Importance of qualication management for wafer fabs, Advanced Semiconductor Manufacturing Conference, p.166169, 2007.

C. Johnzén, S. Dauzère-pérès, P. Vialletelle, C. Yugma, and A. Derreumaux, Impact of qualication management on scheduling in semiconductor manufacturing, Winter Simulation Conference, 2008.

W. Jordan and S. Graves, Principles on the benets of manufacturing process exibility, Management Sciences, vol.41, p.577594, 1995.

M. Kanellos, New life for Moore's law. c|net, 2005.

O. Kariv and S. Hakimi, An algorithmic approach to network location problems. part 1 : The p-centers, SIAM Journal on Applied Mathematics, p.513538, 1979.

O. Kariv and S. Hakimi, An algorithmic approach to network location problems. part 2 : The p-medians, SIAM Journal on Applied Mathematics, p.539560, 1979.

N. Karmakar, A new polynomial time algorithm for linear programming, Combinatorica, vol.4, p.373395, 1984.

P. Kouvelis, Y. , and G. , Robust Discrete Optimization and its Applications, 1997.
DOI : 10.1007/978-1-4757-2620-6

S. Lai, H. , and C. , Measurement of plant exibility, 17th European Symposium on Computer Aided Process Engineering, 2007.

E. Lawler and J. Labetoulle, On Preemptive Scheduling of Unrelated Parallel Processors by Linear Programming, Journal of the ACM, vol.25, issue.4, p.4864, 1978.
DOI : 10.1145/322092.322101

R. Leachman and D. Hodges, Benchmarking semiconductor manufacturing, IEEE International Integrated Reliability Workshop Final Reports, p.16, 1997.

J. Lenstra, R. Kan, and A. , Computational Complexity of Discrete Optimization Problems, Annals of Discrete Mathematics, vol.4, p.121140, 1979.
DOI : 10.1016/S0167-5060(08)70821-5

R. Mahoney, High-mix low-volume manufacturing, 1997.

S. Mason, J. Fowler, C. , and W. , A modied shifting bottleneck heuristic for minimizing total weighted tardiness in complex job shops, Journal of Scheduling, vol.5, 2002.

N. Megiddo and K. Supowit, On the Complexity of Some Common Geometric Location Problems, SIAM Journal on Computing, vol.13, issue.1, p.182196, 1984.
DOI : 10.1137/0213014

S. Mehrotra, On the Implementation of a Primal-Dual Interior Point Method, SIAM Journal on Optimization, vol.2, issue.4, p.575601, 1992.
DOI : 10.1137/0802028

N. Mladenovi¢, M. Labbé, and P. Hansen, -Center problem with Tabu Search and Variable Neighborhood Search, Networks, vol.21, issue.38, p.207226, 2003.
DOI : 10.1002/net.10081

L. Mönch and R. Driessel, A distributed shifting bottleneck heuristic for complex job shops, Computers & Industrial Engineering, vol.49, issue.3, p.672680, 2005.
DOI : 10.1016/j.cie.2005.06.004

L. Mönch, R. Schabacker, D. Pabst, F. , and J. , Genetic algorithm-based subproblem solution procedures for a modied shifting bottleneck heuristic for complex job shops, European Journal of Operational Research, p.21002118, 2007.

L. Mönch, M. Stehli, J. Zimmermann, and I. Habenicht, The FAB- MAS multi-agent-system prototype for production control of wafer fabs : design, implementation and performance assessment, Production Planning & Control, vol.17, p.701716, 2006.

M. Torres and J. , Transport automatisé dans les systèmes de fabricatin de semi-conducteurs, EMSE, 2005.

M. Torres and J. , A literature survey on design approaches and operational issues of automated wafer-transport systems for wafer fabs, Production, Planning & Control, vol.17, p.648663, 2006.
URL : https://hal.archives-ouvertes.fr/hal-00387636

M. Torres and J. , Manufacturing performance evaluation in wafer semiconductor factories, International Journal of Productivity and Performance Management, vol.55, p.300310, 2006.
URL : https://hal.archives-ouvertes.fr/hal-00387635

G. Moore, Cramming More Components Onto Integrated Circuits, Proceedings of the IEEE, vol.86, issue.1, 1965.
DOI : 10.1109/JPROC.1998.658762

J. Moyne, E. Del-castillo, and A. Hurwitz, Run-to-Run Control in Semiconductor Manufacturing, 2001.

J. Moyne, V. Solakhian, A. Yershow, M. Anderson, M. Hebert et al., Development and deployment of a multi-component Advanced Process Control system for an epitaxy tool, 13th Annual IEEE/SEMI Advanced Semiconductor Manufacturing Conference. Advancing the Science and Technology of Semiconductor Manufacturing. ASMC 2002 (Cat. No.02CH37259), p.125130, 2002.
DOI : 10.1109/ASMC.2002.1001587

S. Nakajima, Introduction to TPM : Total Productive Maintenance, 1988.

S. Nash and A. Sofer, Linear and Nonlinear Programming, 1996.

H. Niedermayer, R. , and O. , A simulation-based analysis of the cycle time of cluster tools in semiconductor manufacturing, 15th European Simulation Symposium, 2003.

S. Oechsner, R. , and O. , A ltered beam search approach to scheduling cluster tools in semiconductor manufacturing, Proceedings of IERC'05, 2005.

S. Oechsner, R. , and O. , Scheduling cluster tools using ltered beam search and recipe comparison, Winter Simulation Conference, p.22032209, 2005.

M. Ono, Y. Asakawa, and T. Sato, Inspection recipe management based on captured defect distribution, 2003 5th International Conference on ASIC. Proceedings (IEEE Cat. No.03TH8690), p.145148, 2003.
DOI : 10.1109/ISSM.2003.1243251

N. Pierce, Y. , and T. , Dynamic dispatch and graphical monitoring system, IEEE/SEMI Advanced Semiconductor Manufacturing Conference, p.464468, 1999.

K. Potti and M. Whitaker, Cycle time reduction at a major Texas Instruments wafer fab, Advanced Semiconductor Manufacturing Conference and Workshop, 2003 IEEEI/SEMI, p.106110, 2003.
DOI : 10.1109/ASMC.2003.1194477

C. Qi, T. Tang, and A. Sivakumar, Simulation based cause and eect analysis of cycle time and wip in semiconductor wafer fabrication, Winter Simulation Conference, p.14231430, 2002.

J. Robinson, J. Fowler, and E. Neacy, Capacity loss factors in semiconductor manufacturing, 2003.

J. Rosen, The Gradient Projection Method for Nonlinear Programming. Part I. Linear Constraints, Journal of the Society for Industrial and Applied Mathematics, vol.8, issue.1, p.180217, 1960.
DOI : 10.1137/0108011

A. Rossi, Ordonnancement en milieu incertain, mise en oeuvre d'une démarche robuste, INPG, 2003.

A. Rossi, M. Espinouse, and M. Jacomino, Robustesse de la conguration d'un parc de machines partiellement multifunctions. Hermés, p.5169, 2005.
DOI : 10.3166/jesa.38.373-395

A. Rossi, M. Jacomino, and M. Espinouse, Etude de robustesse : configuration d'un parc de machines partiellement multifonctions, Journal Europ??en des Syst??mes Automatis??s, vol.38, issue.3-4, p.373395, 2004.
DOI : 10.3166/jesa.38.373-395

URL : https://hal.archives-ouvertes.fr/hal-00079078

H. Rulkens, E. Van-campen, J. Van-herk, R. , and J. , Batch size optimization of a furnace and pre-clean area by using dynamic simulations, IEEE/SEMI 1998 IEEE/SEMI Advanced Semiconductor Manufacturing Conference and Workshop (Cat. No.98CH36168), p.439444, 1998.
DOI : 10.1109/ASMC.1998.731643

. Semi, Standard for denition and measurement of equipment productivity, 2000.

A. Sethi and S. Sethi, Flexibility in manufacturing: A survey, International Journal of Flexible Manufacturing Systems, vol.2, issue.4, p.289328, 1990.
DOI : 10.1007/BF00186471

N. Shor, Minimization Methods for Non-dierentiable Functions

R. Slater, Portraits in silicon, 1987.

T. Sloan, Shop-oor scheduling of semiconductor wafer fabs : Exploring the inuence of technology, market and performance objectives, The International Journal of Flexible Manufacturing Systems, p.289328, 1990.

C. Sorensen, My fourty years with Ford, 1956.

R. Srinivasan, Modeling and performance analysis of cluster tools using Petri nets, IEEE Transactions on Semiconductor Manufacturing, vol.11, issue.3, p.394403, 1998.
DOI : 10.1109/66.705374

W. Stalling, Operating Systems Internals and Design Principles, 2004.

E. Van-campen and . Tu-eindhoven, Design of multi-process multi-product wafer fab, 2001.

C. Veeger, L. Etman, J. Van-herk, R. , and J. , Generqting cycle time-throughput curves using eective process time based aggregate modeling, Advanced Semiconductor Manufacturing Conference, p.127133, 2008.

S. Venkatesh, R. Davenport, P. Foxhoven, and J. Nulman, A steady-state throughput analysis of cluster tools: dual-blade versus single-blade robots, IEEE Transactions on Semiconductor Manufacturing, vol.10, issue.4, p.418424, 1997.
DOI : 10.1109/66.641483

P. Vialletelle, F. , and G. , An overview of an original WIP management framework at a high level volume/high mix facility, IFAC Symposium on Information Control Problems in Manufacturing, p.8992, 2006.

M. Wahab, D. Wu, L. , and C. , A generic approach to measuring the machine exibility of a manufacturing system, European Journal of Operational Research, vol.1, p.137149, 2008.

M. Walsh, Specialized foundries nd niche, Semiconductor International, 2008.

T. Williams, Recipe management : a matter of eciency, Semiconductor Fabtech, p.4751, 1999.

P. Wolfe, Convergence condtions for ascent methods, SIAM Review, p.226235, 1969.

J. Yi, S. Ding, D. Song, and M. Zhang, Scheduling analysis of cluster tools with buer/process modules, IEEE International Conference on Robotics and Automation, p.985990, 2007.

C. Yugma, S. Dauzère-pérès, A. Derreumaux, and O. Sibille, A batch optimization software for diustion area scheduling in semiconductor manufacturing, Advanced Semiconductor Manufacturing Conference, p.327332, 2008.

C. Yugma, R. Riffart, P. Vialletelle, S. Dauzère-pérès, and F. Buttin, A dispatcher simulator for a photolithography workshop, 2007 IEEE/SEMI Advanced Semiconductor Manufacturing Conference, 2007.
DOI : 10.1109/ASMC.2007.4595692

T. Yurtsever and M. Comerford, Equipment management system (EMS), Proceedings of SEMI Advanced Semiconductor Manufacturing Conference and Workshop, p.248254, 1995.
DOI : 10.1109/ASMC.1995.484380

E. Zahara, F. , and S. , Real-coded genetic algorithm for stochastic optimization: A tool for recipe qualification of semiconductor manufacturing under noisy environments, The International Journal of Advanced Manufacturing Technology, vol.38, issue.3-4, p.19, 2003.
DOI : 10.1007/s00170-003-1935-0