G. Abdelnour, R. A. Duddek, and M. L. Smith, Effect of maintenance policies on the just-in-time production system, International Journal of Production Research, vol.28, issue.3, pp.565-585, 1995.
DOI : 10.1080/00207549508930166

R. Aggoune, Minimising the makespan for the flowshop scheduling problem with availability constraints, 2001.

R. Aggoune, Ordonnancement d'ateliers sous contraintes de disponibilité des machines, Thèse de doctorat soutenue à l'Université de, 2002.

A. Ahmad and D. P. Kothari, A REVIEW OF RECENT ADVANCES IN GENERATOR MAINTENANCE SCHEDULING, Electric machines and power systems, pp.373-387, 1998.
DOI : 10.1109/59.141779

M. S. Akturk and E. Gorgulu, Match-up scheduling under a machine breakdown, European Journal of Operational Research, vol.112, issue.1, pp.81-97, 1999.
DOI : 10.1016/S0377-2217(97)00396-2

D. Alcaide, A. Rodriguez-gonzalez, and J. Sicilia, An approach to solve the minimum expected makespan flow-shop problem subject to breakdowns, European Journal of Operational Research, vol.140, issue.2, pp.384-398, 2002.
DOI : 10.1016/S0377-2217(02)00077-2

M. A. Aloulou, Structure flexible d'ordonnancements à performances contrôlées pour le pilotage d'atelier en présence de perturbations, Thèse de Doctorat de l'Institut National Polytechnique de Lorraine, 2002.

L. Amodeo, Contribution à la simplification et à la commande des réseaux de Pétri stochastiques Application aux systèmes de production, Thèse de doctorat en Productique soutenue à l' INPG, 1999.

S. Anily, C. A. Glass, and R. Hassin, Scheduling maintenance services to three machines, Annals of Operations Research, vol.86, pp.375-391, 1999.
DOI : 10.1023/A:1018971222185

C. Artigues, Ordonnancements en temps réel d'ateliers avec temps de préparation des ressources, Thèse de doctorat soutenue à l'université Paul Sabatier de Toulouse (France), 1997.

C. Artigues, C. Briand, M. C. Portmann, and F. Roubellat, Pilotage des systèmes de production, chapitre Pilotage d'atelier basé sur un ordonnancement flexible, Edition Hèrmes, Kieffer J.P. & Pujo P, 2002.

J. Ashayeri, A. Teelen, and W. Selen, A production and maintenance planning model for the process industry, International Journal of Production Research, vol.40, issue.12, pp.3311-3326, 1996.
DOI : 10.1016/0377-2217(94)00261-A

P. Baillet, Contribution à l'amélioration de la réactivité dans les systèmes de production notamment par la mise en oeuvre de concepts de décentralisation des fonctions de décision, Thèse de doctorat soutenue à l'université d, BAK74] Baker K.R., Introduction to sequencing and scheduling, 1974.

J. Balasubramanian and I. E. Grossmann, A novel branch and bound algorithm for scheduling flowshop plants with uncertain processing times, Computers & Chemical Engineering, vol.26, issue.1, pp.41-57, 2002.
DOI : 10.1016/S0098-1354(01)00735-9

R. Barlow and L. Hunter, Optimum Preventive Maintenance Policies, Operations Research, vol.8, issue.1, pp.90-100, 1960.
DOI : 10.1287/opre.8.1.90

G. Bavier, F. Les-techniques-benbouzid, F. Nader, C. Varnier, and N. Zerhouni, Un SIAD pour la génération du planning de maintenance préventive, e Conférence Francophone de Modélisation et de SIMulation MOSIM'01, pp.939-946, 2001.

F. Benbouzid, C. Varnier, and N. Zerhouni, Un SIAD pour l'élaboration du planning de maintenance préventive, Mécanique (ISPM), vol.6, 2002.

F. Benbouzid, Y. Bessadi, S. Guebli, C. Varnier, and N. Zerhouni, Résolution du problème de l'ordonnancement conjoint maintenance/production par la stratégie séquentielle, e Conférence Francophone de Modélisation et de SIMulation MOSIM'03 Toulouse, 2003.

F. Benbouzid, C. Varnier, and N. Zerhouni, Resolution of joint maintenance/production scheduling by sequential and integrated strategies, 7th International Work Conference on Artificial and Natural Neural Networks IWANN2003, 3-6 June, Spain, Proceedings LNCS 2687, pp.782-789, 2003.
DOI : 10.1016/S0098-1354(96)00327-4

F. Benbouzid, C. Varnier, and N. Zerhouni, Une heuristique de recherche par voisinage pour l'ordonnancement conjoint maintenance/production, ième Conférence Internationale en Conception et Productique Intégrées CPI'2003, pp.22-24, 2003.

F. Benbouzid and C. Varnier, Robust joint Production and Maintenance scheduling with processing time uncertainty, 9th International Workshop on project management and scheduling PMS2004, 2004.

F. Benbouzid, C. Varnier, and N. Zerhouni, Resolution of joint maintenance/production scheduling with GA, 9th International Workshop on project management and scheduling PMS2004, 2004.

F. Benbouzid, C. Varnier, and N. Zerhouni, Etude de l'impact de la maintenance sur la robustesse des ordonnancements conjoints production/maintenance, 6e Congrès international de génie industriel GI2005 sur CD Rom, pp.7-10, 2005.

F. Benbouzid, C. Varnier, N. Zerhouni, M. Ben-daya, M. M. Makhdoum et al., Résolution du problème de l'ordonnancement conjoint production/maintenance par les stratégies séquentielle, intégrée et hybride Integrated production and quality model under various maintenance policies Modélisation intégrée des activités de maintenance et de production, soumis à la revue JESA ? Journal Européen des Systèmes Automatisés -. [BEN98 3 e Conférence Francophone de Modélisation et de SIMulation MOSIM'01 Troyes (France), pp.840-853805, 1998.

M. Bembla, Ordonnancement conjoint production et maintenance : Critère et heuristique de résolution, Mémoire de DEA, U.F.R des Sciences et Techniques de l'Université de Franche Comté, 2002.

J. C. Billaut, A. Moukrim, and E. Sanlaville, Flexibilité et robustesse en ordonnancement, 2005.

J. Blazewicz, K. Ecker, E. Pesch, G. Schmidt, and J. Weglarz, Scheduling Computer and Manufacturing Processes, Journal of the Operational Research Society, vol.48, issue.6, 1996.
DOI : 10.1057/palgrave.jors.2600793

D. Boitel, C. Hazard, E. Guide-de-la-maintenance, A. Nathan-boulenger, P. Afnor et al., Vers le zéro panne avec la maintenance conditionnelle Robust production and maintenance planning in stochastic manufacturing system, IEEE Transactions on Automatic Control, vol.40, issue.6, pp.1098-1102, 1988.

L. Boyer, M. Poirée, and E. Salin, Précis d'organisation et de gestion de la production, Les Editions d'Organisation, 1986.

M. Brandolese, M. Fransi, and A. Pozzeti, Production and maintenance integrated planning, International Journal of Production Research, vol.2, issue.7, pp.2059-2075, 1996.
DOI : 10.1080/00207548408942470

J. Branke and D. C. Mattefeld, Anticipation in Dynamic Optimization: The Scheduling Case, Proceeding of sixth Parallel Problem Solving from Nature, pp.253-262, 2000.
DOI : 10.1007/3-540-45356-3_25

J. Branke, Creating robust solutions by means of evolutionnary algorithms, Proceeding of fifth Parallel Problem Solving from Nature, pp.119-128, 1998.

P. Brucker, Scheduling algorithms, Spriger-Verlag, 1998.

J. A. Buzacott and J. G. Shanthikumar, Stochastic models of manufacturing systems, 1990.

H. G. Campbell, R. Dudek, and M. L. Smith, Machine Sequencing Problem, Management Science, vol.16, issue.10, pp.630-670, 1970.
DOI : 10.1287/mnsc.16.10.B630

J. Carlier and R. A. , Ordonnancements ?? contraintes disjonctives, RAIRO - Operations Research, vol.12, issue.4, pp.333-351, 1978.
DOI : 10.1051/ro/1978120403331

J. Carlier and P. Chretienne, Problèmes d'ordonnancement : Modélisation, Complexité, Algorithmes, Etude et recherche en informatique (ERI), Edition MASSON, 1988.

D. Carvalho and S. , Modèles stochastiques appliqués à l'optimisation de la performance et de la sûreté de fonctionnement des systèmes de production, Thèse de Doctorat de l'université Paul Sabatier, 1991.

C. C. Pierreval, H. Portmann, and M. C. , Les algorithmes génétiques et leur application aux problèmes d'ordonnancement, Congrès d'ordonnancement, 1994.

I. Charon, A. Germa, and O. Hurdy, Méthodes d'optimisation combinatoires, Edition MASSON, 1996.

C. Chareonsuk, N. Nagarur, and M. T. Tabucanon, A multicriteria approach to the selection of preventive maintenance intervals, International Journal of Production Economics, vol.49, issue.1, pp.55-64, 1997.
DOI : 10.1016/S0925-5273(96)00113-2

Z. Cherfi, La qualité ? Démarche, méthodes et outils, Edition Hermès Sciences, pp.115-154, 2002.

W. Chen and M. Muraki, A fussy evaluation of schedule robustness under processing time variation in batch plant, Journal of Chemical Engineering of Japan, pp.260-267, 1997.

W. Chen, T. Fuchino, and M. Muraki, A Modification Module for Robust Schedule Generation System of Batch Plants., Sckiiyu Gakkaiçshi, pp.378-389, 1997.
DOI : 10.1627/jpi1958.40.378

K. L. Cheung and W. H. Hausmann, Joint determination of preventive maintenance and safety stocks in an unreliable production environment, Naval Research Logistics, vol.44, issue.3, pp.257-272, 1997.
DOI : 10.1002/(SICI)1520-6750(199704)44:3<257::AID-NAV2>3.0.CO;2-7

C. Chu, . Ordonnancement-de-la-production-chu, and . J. Proth, Sciences de l'ingénieur. Edition MASSON Minimising the makespan in two machines flowshop scheduling with availability constraints Theory and methodology two machines flowshop scheduling with availability constraints Scheduling jobs and maintenance activities on parallel machines, Naval Research Logistics, vol.20, issue.47, pp.129-139420, 1995.

D. Costa, Méthodes de résolution constructives, séquentielle et évolutive pour des problèmes d'affectation sous contraintes, Thèse de doctorat, 1995.

T. Coudert, Apport des systèmes multi-agents pour la négociation en ordonnancement : application aux fonctions production et maintenance, Thèse de doctorat soutenue à l'ENI de Tarbes (France), 2000.

T. Coudert, B. Grabot, and B. Archimède, Logique floue et système multiagents pour un ordonnancement coopératif production/maintenance, e Conférence Francophone de Modélisation et de SIMulation MOSIM'01

P. I. Cowling and M. Johansson, Using real time information for effective dynamic scheduling, European Journal of Operational Research, vol.139, issue.2, pp.230-244, 2002.
DOI : 10.1016/S0377-2217(01)00355-1

Y. Dallery and S. B. Gershwin, Manufacturing flow line systems: a review of models and analytical results, Queueing Systems, vol.36, issue.6, pp.3-94, 1992.
DOI : 10.1007/BF01158636

D. G. Dannenbring, An Evaluation of Flow Shop Sequencing Heuristics, Management Science, vol.23, issue.11, pp.1174-1182, 1977.
DOI : 10.1287/mnsc.23.11.1174

L. Davis, Handbook of Genetic Algorithms, 1991.

A. J. Davenport and J. C. Beck, A survey of techniques for scheduling with uncertainty, Papier non publié disponible sur, 2000.

A. J. Davenport, C. Gefflot, J. C. &beck, I. T. Dedopoulos, and N. Shah, Slack-based techniques for building robust Schedules Optimal short-term scheduling of maintenance and production for multipurpose plants, European Conference on Planning -ECP01, pp.192-201, 1995.

R. Demmou, Etude de familles remarquables d'ordonnancements en vue d'une aide à la décision, Thèse de doctorat soutenue à l'Université Paul Sabatier de, 1977.

S. Deniaud, Contribution à l'élaboration d'un modèle technico-économique de maintenance préventive : Cas de lignes de fabrication industrielles, Thèse de Doctorat soutenue à ENI de Belfort (France), 1999.

S. Deniaud, N. Zehouni, F. Morel, and . Apii-jesa, Planification de la maintenance préventive d'une ligne de fabrication de GEC Alsthom, pp.227-250, 1999.

M. Dorigo, Learning and Natural Algorithms (in Italian), 1992.

R. Dorne and J. K. Hao, A new genetic local search algorithm for graph coloring, Lecture Notes in Computer Science, vol.1498, pp.745-754, 1998.
DOI : 10.1007/BFb0056916

G. Doumeingts and G. Méthode, méthode de conception des systèmes en productique. Thèse d'état soutenue à l'université de Bordeaux I (France), 1984.

L. Dumont and L. Morel, Modélisation des coûts de maintenance : Application sur l'installation d'expérimentation AIRIX " , 3 e Conférence Francophone de Modélisation et de SIMulation MOSIM'01 Troyes (France, pp.29-33, 2001.

M. Espinouse, Flowshop et extensions : chevauchement des tâches, indisponibilité des machines et système de transport, Thèse de l'Université Joseph Fourier, p.1998

M. L. Espinouse, P. Formanowicz, and B. Penz, Complexity results and approximation algorithms for the two machine no-wait flow-shop with limited machine availability, Journal of the Operational Research Society, vol.52, issue.1, pp.116-121, 1999.
DOI : 10.1057/palgrave.jors.2601025

C. Fleurent, Algorithmes génétiques hybrides pour l'optimisation combinatoire Thèse du département d'informatique et de recherche opérationnelle de l'université de Montréal, Canada, 1994. [FRE82] Frensh S., Sequencing and Scheduling: An introduction to the mathematics of the jobshop, 1982.

H. Gao, Building robust schedules using temporal protection an empirical study of constraint based scheduling under machine failure uncertainty, 1995.

R. M. Garey and S. M. Johnson, Computers and Intractability, A guide to the Theory of NP-Completeness, Freeman and CO, 1979.

A. Gharbi and J. Kenne, Production and corrective maintenance planning of FMS through simulation optimization, th international conference on engineering design and automation, 2000.

N. Giard, Gestion de la production, Edition Economica, 1988.

B. Girard, Guide pratique du responsable de maintenance, T1. Edition WEKA, 2000.

C. W. Gits, Structuring Maintenance Control Systems, International Journal of Operations & Production Management, vol.14, issue.7, pp.5-17, 1994.
DOI : 10.1108/01443579410062121

F. Glover, HEURISTICS FOR INTEGER PROGRAMMING USING SURROGATE CONSTRAINTS, Decision Sciences, vol.15, issue.1, pp.156-166, 1977.
DOI : 10.1093/comjnl/16.2.135

F. Glover, Future paths for integer programming and links to artificial intelligence, Computers & Operations Research, vol.13, issue.5, pp.533-549, 1986.
DOI : 10.1016/0305-0548(86)90048-1

F. Glover, Tabu Search???Part I, ORSA Journal on Computing, vol.1, issue.3, pp.190-206, 1989.
DOI : 10.1287/ijoc.1.3.190

F. Glover, Taboo search: Part II, ORSA Journal of Computing, vol.2, 1990.

D. E. Goldberg, M. Gopalagrishnan, S. Mohan, and Z. He, Genetic algorithms in search, Optimisation and Machine Learning A taboo search heuristic for preventive maintenance scheduling Les problèmes d'ordonnancement, Computers and Engineering Recherche Opérationnelle/Operations Research, vol.40, issue.271, pp.149-16077, 1989.

G. Flexibilité and . Gotha, Flexibilité et Robustesse en ordonnancement, Disponible sur http://www.roadef.org/If/flexordo.ps, 2002.

R. L. Graham, Bounds on Multiprocessing Timing Anomalies, SIAM Journal on Applied Mathematics, vol.17, issue.2, pp.416-429, 1969.
DOI : 10.1137/0117039

R. L. Graham, E. L. Lawler, J. K. Lenstra, and A. H. Kan, Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey, Annals of Discrete Mathematics Naval Research Logistics, vol.5, issue.46, pp.287-326845, 1979.
DOI : 10.1016/S0167-5060(08)70356-X

J. J. Grefenstette, Incorporating problem specific knowledge into genetic algorithm, Genetic Algorithm and Simulated Annealing, pp.42-60, 1987.

J. N. Gupta and R. A. Dudek, Optimality Criteria for Flowshop Schedules, A I I E Transactions, vol.15, issue.3, pp.199-205, 1971.
DOI : 10.1080/05695557108974807

N. G. Hall and M. E. Posner, Sensitivity Analysis for Scheduling Problems, Journal of Scheduling, vol.7, issue.1, pp.49-83, 2004.
DOI : 10.1023/B:JOSH.0000013055.31639.f6

P. Hansen, The steepest ascent mildest descent heuristic for combinatorial programming, Congress on Numerical Methods in Combinatorial Optimisation, 1986.

G. Haran and P. E. Méthode, Gestion et ordonnancement des projets par la méthode du chemin critique, Edition EYROLLES, 1995.

J. Holland, Adaptation in natural and artifical systems, 1975.

P. J. Huber, Robust Statistics, 1981.

M. T. Jensen and T. K. Hansen, Robust solution to jobshop problems, Proceeding of the Congress of Evolutionary Computation, pp.1138-1144, 1999.

M. T. Jensen, Neighbourhood based robustness applied to tardiness and total flowtime jobshops, Proceeding of sixth Parallel Problem Solving from Nature, pp.283-292, 2000.

M. T. Jensen, Improving robustness and flexibility of tardiness and total flow-time job shops using robustness measures, Applied Soft Computing, vol.1, issue.1, pp.35-52, 2001.
DOI : 10.1016/S1568-4946(01)00005-9

M. T. Jensen, Robust and flexible scheduling with evolutionary computation, Thèse de doctorat soutenue à la faculté des Sciences de l'Université de, 2001.

S. M. Johnson, Optimal two- and three-stage production schedules with setup times included, Naval Research Logistics Quarterly, vol.1, issue.1, 1954.
DOI : 10.1002/nav.3800010110

J. Kaabi, C. Varnier, and N. Zerhouni, Heuristics for scheduling maintenance and production on a single machine, IEEE International Conference on Systems, Man and Cybernetics, 2002.
DOI : 10.1109/ICSMC.2002.1176339

J. Kaabi, Contribution à l'ordonnancement des activités de maintenance dans les systèmes de production, Thèse de doctorat soutenue à l'Université de Franche Comté, 2004.

R. N. Kackar, Off-Line Quality Control, Parameter Design, and the Taguchi Method, Journal of Quality Technology, vol.17, issue.4, pp.176-188, 1985.
DOI : 10.1007/978-1-4684-1472-1_4

H. Kaffel, La maintenance distribuée : Concepts, Evaluation et Mise en oeuvre. Thèse PhD, département de génie mécanique, Faculté des sciences et de génie, 2001.

S. Kirkpatrick, C. D. Gelatt, &. Jr, and M. P. Vecchi, Optimisation by simulated annealing, 1983.

K. A. Kobbacy, B. B. Fawzi, D. F. Percy, and H. E. Ascher, A full history proportional hazards model for preventive maintenance scheduling, Quality and reliability engineering international, pp.187-198, 1997.
DOI : 10.1002/(SICI)1099-1638(199707)13:4<187::AID-QRE98>3.0.CO;2-L

C. Kolski and P. Millot, Problems in telemaintenance and decision aid criteria for telemaintenance system design, International Journal of Industrial Ergonomics, vol.11, issue.2, pp.99-106, 1993.
DOI : 10.1016/0169-8141(93)90004-W

P. Kouvelis, G. Yu, S. Lash, A. Laugier, N. Allahwerdi et al., Genetic algorithm for weighted tardiness scheduling on parallel machines Technical report n° 93.01, Department of Industrial Engineering and Management Sciences, North-western University Remote instrument telemaintenance, Computer Methods and Programs in Biomedicine, vol.50, issue.2, pp.187-194, 1993.

Y. Lavina and J. M. Loubère, Maintenance et Travaux Neufs, Les règles de la sous-traitance. Les Éditions D'organisation, 1996.

Y. Lavina, La maintenance: fiabilité, maintenabilité, sécurité, 1998.

S. R. Lawrence and E. C. Sewell, Heuristic, optimal, static, and dynamic schedules when processing times are uncertain, Journal of Operations Management, vol.15, issue.1, pp.71-82, 1997.
DOI : 10.1016/S0272-6963(96)00090-3

C. Lee and Z. Chen, Scheduling jobs and maintenance activities on parallel machines, Naval Research Logistics, vol.3, issue.2, pp.145-165, 2000.
DOI : 10.1002/(SICI)1520-6750(200003)47:2<145::AID-NAV5>3.0.CO;2-3

V. J. Leon, S. D. Wu, and R. H. Storer, ROBUSTNESS MEASURES AND ROBUST SCHEDULING FOR JOB SHOPS, IIE Transactions, vol.41, issue.5, pp.32-43, 1994.
DOI : 10.1080/00207548508904739

P. Lopez and F. Roubellat, Ordonnancement de la production Chapitres 1 & 2.Edition Hermès Science, LYO92] Lyonnais P., Maintenance mathématique et méthode. Troisième édition, technique et édition Lavoisier, 1992.

M. Malcolm, Plant Maintenance. A New Direction, Process and Control engineering PACE, vol.46, issue.9, pp.20-22, 1993.

J. J. Mccall, Maintenance Policies for Stochastically Failing Equipment: A Survey, Management Science, vol.11, issue.5, pp.493-524, 1965.
DOI : 10.1287/mnsc.11.5.493

S. V. Mehta and R. Uzsoy, Predictable scheduling of a single machine subject to breakdowns, International Journal of Computer Integrated Manufacturing, vol.12, issue.1, pp.15-28, 1999.
DOI : 10.1080/095119299130443

D. J. Mignon, S. J. Honkomp, and G. V. Reklaitis, A framework for investigating schedule robustness under uncertainty, Computers and Chemical Engineering, vol.21, pp.615-620, 1995.
DOI : 10.1016/0098-1354(95)00128-o

F. Monchy, La fonction maintenance, 1996.

J. Moubray, Reliability Centred Maintenance, 1997.

H. Mühlenbein, M. Gorges-schleuter, and O. Krämer, Evolution algorithms in combinatorial optimization, Parallel Computing, vol.7, issue.1, pp.95-85, 1988.
DOI : 10.1016/0167-8191(88)90098-1

S. Nakajima, La maintenance productive totale (TPM), nouvelle vague de la production industrielle. Afnor Gestion, 1987.

S. Nakajima, La maintenance productive Totale : Mise en oeuvre, 1989.

T. Nakagawa, Periodic and sequential preventive maintenance policies, Journal of Applied Probability, vol.9, issue.02, pp.536-542, 1986.
DOI : 10.2307/3213653

N. Nawaz, . Enscore-e, . Jr, and . Ham-i, A heuristic algorithm for the m machine, n job flowshop sequencing problem, Omega, vol.11, 1983.

D. Noyes and F. Pérès, Conduite intégrée de production et de maintenance dans les systèmes industriels, Troisième Congrès International de Génie Industriel Mai, pp.26-28, 1999.

M. Ouali, R. N. Xie, X. Palmer, D. S. Papadimitriou, and C. H. , Maintenance préventive et optimisation des flux d'une ligne de fabrication Sequencing Jobs Through A Multi-Stage Process in the Minimum Total Time ?A Quick Method of Obtaining A Near Optimum The complexity of combinatorial optimization problems, 3 e Conférence Francophone de Modélisation et de SIMulation MOSIM'01 Troyes (France)PAP82] Papadimitriou C.H. & Steiglitz K., Combinatorial Optimization: Algorithms and Complexity, pp.791-796, 1965.

L. Pape and C. , Artificial Intelligence in Reactive Scheduling, chapter Experiments with a distributed architecture for predictive scheduling and execution monitoring, 1995.

N. M. Paz and W. Leigh, Maintenance Scheduling: Issues, Results and Research Needs, International Journal of Operations & Production Management, vol.14, issue.8, pp.47-69, 1994.
DOI : 10.1108/01443579410067135

C. Pellegrin, Fondements de la décision de maintenance, Edition Economica, 1997.

B. Penz, C. Rapine, and D. Tristram, Sensitivity analysis of scheduling algorithms, European Journal of Operational Research, vol.134, issue.3, pp.606-615, 2001.
DOI : 10.1016/S0377-2217(00)00281-2

URL : https://hal.archives-ouvertes.fr/hal-00239335

F. Pérès, E. Caillaud, and D. Noyes, La maintenance dans l'évaluation des performances des systèmes de production : une approche par la simulation, Deuxième congrès international Franco-Québecois de Génie Industrielle, pp.3-5, 1997.

W. Pierskalla and J. Voelker, A survey of maintenance models: The control and surveillance of deteriorating systems, Naval Research Logistics Quarterly, vol.6, issue.3, pp.353-388, 1976.
DOI : 10.1002/nav.3800230302

M. Pinedo, E. N. Scheduling-[-pis96-]-pistikopoulos, T. V. Thomaidis, A. Melin, and M. G. Ierapetritov, Theory, Algorithms, and Systems. Edition Prentice Hall International, series in industrial and systems engineering Flexibility, reliability and maintenance considerations in batch plant design under uncertainty, Computers and Chemical Engineering, vol.20, pp.1209-1214, 1995.

J. C. Pomerol, S. G. Ponnambalam, P. Aravindan, and S. Chandrasekaran, Scenario development and practical decision making under uncertainty, Decision Support Systems Constructive and improvement flowshop scheduling heuristics: an extensive evaluation Algoritmes génétiques et ordonnancement. Ordonnancement de la production Genetic algorithms and scheduling: a state of the art and some propositions, POR01] Portmann M.C. & Vignier A. Workshop on Production Planning and Control, pp. I- XIV, pp.197-204, 1996.

X. Qi, T. Chen, and F. Tu, Scheduling the maintenance on a single machine, Journal of the Operational Research Society, vol.50, issue.10, pp.1071-1078, 1999.
DOI : 10.1057/palgrave.jors.2600791

C. R. Reeves, A genetic algorithm for flowshop sequencing, Computers & Operations Research, vol.22, issue.1, pp.5-13, 1995.
DOI : 10.1016/0305-0548(93)E0014-K

D. Retour, M. Bouche, and V. Plauchu, Où va la maintenance industrielle, Problèmes Économiques, pp.7-13, 1990.

D. Richet and M. Gabriel, Maintenance basée sur la fiabilité, Edition Masson, 1996.

T. D. Rishel and D. P. Christy, Incorporating maintenance activities into production planning; integration at the master schedule versus material requirements level, International Journal of Production Research, vol.24, issue.2, pp.421-446, 1996.
DOI : 10.1016/0272-6963(86)90016-1

M. Roboam, Modèles de référence et intégration des méthodes d'analyse pour la conception des systèmes de production, Thèse de doctorat soutenue à l'université de Bordeaux (France), 1988.

B. Roy, Un chaînon manquant en RO-AD : les conclusions robustes, Cahier du Laboratoire d'Analyse et de Modélisation de Systèmes pour l'Aide à la Décision, 1997.

B. Roy, Robustesse de quoi et vis-à-vis de quoi mais aussi robustesse pourquoi en aide en décision, Proceeding of the 56th meeting of the European Working Group " Multiple Criteria Decision Aiding, 2002.

D. Safaai, O. Sigeru, O. Hiroshi, K. Shaharudin, and A. S. Pathiah, Ship maintenance scheduling by genetic algorithm and constraint based reasoning, European Journal of Operational Research, vol.112, pp.489-502, 1999.

E. Sanmarti, A. Espuna, and L. Puigjaner, Effects of equipment failure uncertainty in batch production scheduling, Computers & Chemical Engineering, vol.19, pp.565-570, 1995.
DOI : 10.1016/0098-1354(95)87095-4

E. Sanmarti, L. Puigjaner, A. Huercio, and A. Espuna, A combined scheduling/reactive scheduling strategy to minimize the effect of process operations uncertainty in batch plants, Computers & Chemical Engineering, vol.20, pp.1263-1268, 1996.
DOI : 10.1016/0098-1354(96)00218-9

E. Sanmarti, A. Espuna, and L. Puigjaner, Batch production and preventive maintenance scheduling under equipment failure uncertainty, Computers & Chemical Engineering, vol.21, issue.10, pp.1157-1168, 1996.
DOI : 10.1016/S0098-1354(96)00327-4

C. Sassine, Intégration des politiques de maintenance dans les systèmes de production manufacturiers, Thèse de doctorat soutenue à l'INP de, 1998.

R. Shafaei and P. Brun, Workshop scheduling using practical (inaccurate) data Part 1: The performance of heuristic scheduling rules in a dynamic job shop environment using a rolling time horizon approach, International Journal of Production Research, vol.37, issue.17, pp.3913-3925, 1999.
DOI : 10.1080/002075499189835

R. Shafaei and P. Brun, Workshop scheduling using practical (inaccurate) data Part 2: An investigation of the robustness of scheduling rules in a dynamic and stochastic environment, International Journal of Production Research, vol.37, issue.18, pp.4105-4117, 1999.
DOI : 10.1080/002075499189682

D. Sherwin, A review of overall models for maintenance management, Journal of Quality in Maintenance Engineering, vol.6, issue.3, pp.138-164, 2000.
DOI : 10.1108/13552510010341171

L. Swanson, The impact of new production technologies on the maintenance function: An empirical study, International Journal of Production Research, vol.37, issue.4, pp.849-869, 1999.
DOI : 10.1080/002075499191562

E. Taillard, E. D. Taillard, L. M. Gambardella, M. Gendreau, and J. Y. Potvin, Benchmarks for basic scheduling problems, European Journal of Operational Research, vol.64, issue.2, pp.278-285, 1993.
DOI : 10.1016/0377-2217(93)90182-M

URL : http://citeseerx.ist.psu.edu/viewdoc/summary?doi=10.1.1.9.8802

M. Talal and Y. Jay, Refinery units maintenance scheduling using integer programming, Applied Mathematical Modelling, vol.19, issue.9, pp.543-549, 1995.

J. C. Tarondeau, La gestion de production. Paris : Presses Universitaires de France,-Que sais-je ? n° 3115, 1996.

Y. T. Tsai, K. S. Wang, H. Y. Teng, C. Valdez-flores, and R. Feldman, Optimizing preventive maintenance for mechanical components using genetic algorithms A survey of preventive maintenance models for stochastically deteriorating single-unit systems, Reliability Engineering and System Safety, pp.89-97419, 1989.

P. Verdol, A. Vignier, J. C. Billaut, and C. Proust, Térotechnologie : interprétation économique d'un nouveau mode d'organisation intégrée de la disponibilité des équipements industriels, thèse de doctorat soutenue à l'université Lumière Lyon II (France) les problèmes d'ordonnancement de type flow-shop hybride : état de l'art, RAIRO Recherche Opérationnelle, vol.33, issue.2, pp.117-183, 1988.

M. Vineyard, K. Amoako-gyampah, and J. R. Meredith, An evaluation of maintenance policies for flexible manufacturing systems, International Journal of Operations & Production Management, vol.20, issue.4, pp.409-426, 2000.
DOI : 10.1108/01443570010319156

H. Wang and H. Pham, Optimal maintenance policies for several imperfect repair models, International Journal of Systems Science, vol.24, issue.6, pp.543-549, 1996.
DOI : 10.2307/2289878

L. Weinstein and C. Chung, Integrating maintenance and production decisions in a hierarchical production planning environment, Computers & Operations Research, vol.26, issue.10-11, pp.1059-1074, 1999.
DOI : 10.1016/S0305-0548(99)00022-2

R. Wheaton, Reliability-Based Maintenance Requires Mill Culture Change, pp.53-61, 1996.

T. A. Whisterkamp, Evaluating the maintenance process, IIE solution, pp.22-27, 1998.

M. Widmer, A. Hertz, D. Costa, and . Les-métaheuristiques, Ordonnancement de la production, Edition Hèrmes Sciences, 2001.

M. Widmer, Les métaheuristiques : des outils performants pour les problèmes industriels " , 3 ème Conférence Francophone de Modélisation et de SIMulation (MOSIM'01), pp.13-21, 2001.

S. D. Wu, E. Byeon, and R. H. Storer, A Graph-Theoretic Decomposition of the Job Shop Scheduling Problem to Achieve Scheduling Robustness, Operations Research, vol.47, issue.1, pp.113-124, 1999.
DOI : 10.1287/opre.47.1.113

X. L. Xie, PERFORMANCE ANALYSIS OF A TRANSFER LINE WITH UNRELIABLE MACHINES AND FINITE BUFFERS, IIE Transactions, vol.4, issue.1, pp.99-108, 1993.
DOI : 10.1109/9.35807

URL : https://hal.archives-ouvertes.fr/inria-00075470

D. Ziebelin, Raisonnement sur les contraintes : Application en ordonnancement Thèse de doctorat en informatique soutenue à l'université Joseph Fourrier de Grenoble (France), La maintenance basée sur la fiabilité, Guide pratique d'application de la RCM. Série Diagnostic et Maintenance, 1990.