Rapport d'environnement PSA 1999, 2000. ,
A special case of transfer line balancing by graph approach, European Journal of Operational Research, issue.168, pp.732-746, 2006. ,
Automatic Disassembly: Main Stage in Manufacturing Products An Algorithm for Dealing with Multi-Objective Optimisation Problem of Disassembly Processes, Proceedings of the 4'th International Workshop on Computer Science and Information Technology Proceedings of the International Symposium of Assembly and Task Planning -ISATP 2003) Determination of the Optimal Disassembly Sequence Using Decision Trees, Preprints The the International IFAC Workshop in Assembly and Disassembly IAD03, pp.9-11, 2002. ,
Applying equal piles Approach to Disassembly line balancing problem, Preprints of The 16th IFAC World Congress, pp.4-8, 1995. ,
Algorithm for Multiple Disassembly and Parallel Assemblies, Journal of Engineering for Industry, vol.117, issue.1, 1995. ,
DOI : 10.1115/1.2803269
Modélisation et analyse des systèmes de désassemblage par réseaux de Petri continus, Proceedings of the 2001 IEEE International Symposium on Assembly and Task Planning, 2001. ,
Decizie asistata de calculator, (Systèmes informatiques de l'aide à la décision) Bucarest, 2005. ,
Informatica Industriala -noi paradigme si aplicatii, Informatique Industrielle), 1999. ,
Applications de méthodes stochastiquesninspirées du recuit simulé à des problèmes d'ordonnancement, Informatique Industrielle, vol.29, pp.4-5, 1995. ,
Experiments of Assembly ans Disassembly Planning in Virtual Environnement, Preprints of the International Symposium of Assembly and Task Planning, pp.37-43, 2003. ,
Génération d'un processus de désassemblage et évaluation du recyclage d'un produit, Thèse de doctorat, 2001. ,
A systematic solution approach to the dissasembly line balancing problem, Proceedings of the 25th International Conference on Computers and Industrial Engineering, pp.70-73, 1999. ,
A solution approach to the disassembly line balancing problem in the presence of task failures, International Journal of Production Research, vol.39, issue.7, pp.1427-1467, 2001. ,
DOI : 10.1080/00207540110052157
Scheduling disassembly, International Journal of Production Research, vol.29, issue.8, pp.1857-1866, 1994. ,
DOI : 10.1038/scientificamerican0192-140
Disassembly of products, Etats Unis, Final Raport, 1996. ,
Concepts et outils pour les systèmes de production, 1997. ,
Contribution à la conceptualisation de l'assemblage automatisé : nouvelle approche en vue de la détermination des processus d'assemblage, Thèse de doctorat, 1989. ,
<title>Multi-criteria decision making for disassembly-to-order system under stochastic yields</title>, Environmentally Conscious Manufacturing IV, pp.147-162, 2004. ,
DOI : 10.1117/12.572060
A Computing Procedure for a Line Balancing Problem, Management Science, vol.2, issue.3, pp.261-271, 1956. ,
DOI : 10.1287/mnsc.2.3.261
La Gestion des Opérations et de la Production ? Une approche systèmique, 1994. ,
State of the art Literature Survey, Disassembly Planning, Concurent Engineering: Research and Applications, 1998. ,
Determination of a disassembly strategy, International Journal of Production Research, vol.34, issue.2, 1996. ,
DOI : 10.1080/00207549608904915
Extraction by disassembling of a single part of a mechanical system for its mainenance, Proceedings of IEEE International Conference on Emerging Technologies and Factory Automation, 1996. ,
Contribution à une méthodologie de conception des systèmes flexibles d'assemblage ou désassemblage, Thèse de doctorat de l'Institut National des Sciences Appliquées de Lyon, 1999. ,
Non-destructive Disassembly Robot Cell for Demanufacturing Automation, Preprints of the International IFAC Workshop in Assembly and Disassembly IAD03, pp.9-11, 2003. ,
Desensamblado automatico no destructivo para la reutilizacion de componentes Aplication al desensamblado de PC's, PhD Thesis at ON_BN_CLICKED(IDC_RESET, OnReset) ON_BN_CLICKED(IDC_DECIZIE, OnDecizie) ON_BN_CLICKED(IDC_SANSA, OnSansa) ON_BN_CLICKED(IDC_ADAUGA2, OnAdauga2) ON_COMMAND(ID_FILE_OPEN, OnFileOpen) ON_BN_CLICKED(IDC_READFILE, OnReadfile) ON_WM_TIMER() ON_BN_CLICKED(IDC_START, OnStart) ON_BN_CLICKED(IDC_STOP, OnStop) ON_BN_CLICKED(IDC_PETRI, OnPetri), 2002. ,
%d",i); m_grid.SetText(szText); m_grid, SetCol, issue.1 ,
,j); m_grid.SetText(szText); m_grid, SetCol, issue.2 ,
%d",tip); m_grid.SetText(szText); m_grid, SetCol, issue.3 ,
%.2f",nv1); m_grid.SetText(szText); m_grid, SetCol, issue.4 ,
,np1); m_grid.SetText(szText); m_grid.SetCol(5); szText.Format("%.2f",nv2); m_grid.SetText(szText); m_grid, SetCol, issue.6 ,
%.2f",np2); m_grid.SetText(szText); m_grid, SetCol, issue.7 ,
%.2f",np3); m_grid.SetText(szText); m_grid, SetCol, issue.8 ,