. Acha, Exploring The Miracle: The Knowledge Base in the Aeronautics Industry. TELL Project (Technological Knowledge and Localized Learning: What Perspectives for a European Policy, 2001.

B. Aggoun, A. Aggoun, B. , and N. , Extending chip in order to solve complex scheduling and placement problems, Mathematical and Computer Modelling, vol.17, issue.7, pp.57-73, 1993.
DOI : 10.1016/0895-7177(93)90068-A

URL : https://hal.archives-ouvertes.fr/hal-00442821

. Ahmed, Scenario Driven Decision Systems: Concepts and Implementation Velden, Austria [AIRBUS '01a] AIRBUS ACMR ? Airbus Configuration Management Rules. Internal document. [AIRBUS '01b] AIRBUS Les revues dans la logique de déroulement d'un programme Maintaining Knowledge About Temporal Intervals, Proceedings of the Eighth CAiSE/IFIP8.1, International Workshop on Evaluation of Modeling Methods in Systems Analysis and Design EMMSAD'03 Means and Methods AM 2450, Airbus Project Management. [AIRBUS '05c] AIRBUS, 2005c. Means and Methods AM 2454, Schedule Management. [AIRBUS '05d] AIRBUS, 2005d. Means and Methods AM 2457, Project Management and Risk Management. [ALLEN '83] ALLEN, J, pp.832-843, 1983.

H. Andreasen, M. M. Andreasen, H. , L. Artigues, C. et al., Integrated Product Development A polynomial activity insertion algorithm in a multiresource schedule with cumulative constraints and multiple modes, European Journal of Operational Research, vol.127, issue.2, pp.297-316, 1987.

R. Artigues, C. , R. , F. , F. Baptiste et al., An efficient algorithm for operation insertion in a multi-resource job-shop schedule with sequence-dependent setup times, [ATA '99] ATA Proceedings of the QMIPS Workshop on Formalisms, Principles and State of Arts, [ Constraint Propagation and Decomposition Techniques for Highly Disjunctive and Highly Cumulative Project Scheduling Problems, pp.175-186119, 1993.
DOI : 10.1051/ro:1999110

A. R. Bedillion, O. , and T. H. Benaben, How Risk Management Has Become a Way of Life in Project Management Une méthode d'identification des risques : application à un projet coopératif, Congrès francophone du management de projet How to manage preliminary information exchanged with suppliers in new product development, Proceedings of the 30th Annual Project Management Institute Proceedings of the 6th International Conference on Integrated Design and Manufacturing in Mechanical Engineering -IDMME'06, pp.6-7, 1997.

P. Brucker, Scheduling and constraint propagation, Discrete Applied Mathematics, vol.123, issue.1-3, pp.227-256, 2002.
DOI : 10.1016/S0166-218X(01)00342-0

URL : http://doi.org/10.1016/s0166-218x(01)00342-0

. Brucker, Elastic scheduling for flexible workload management Using the design structure matrix to estimate product development time, ASME Design Engineering Technical Conferences Improved CLP Scheduling with Task Intervals An Innovative Approach to Schedule Management on the F/A-22 Major Defense Acquisition Program (MDAP):Demonstration of Critical Chain Project Management CAX application for process oriented concurrent design, Proceedings of the 11th International Conference on Logic Programming, ICLP'94 Generalized Elastic Scheduling, 27th IEEE International Real-Time Systems Symposium RTSS '06 On PERT Networks with Alternatives Protection Against Uncertainty In a Deterministic Schedule Proceedings of The Fourth International Conference on Expert systems in Production and Operations Management Journal of Materials Processing Technology, pp.107-127289, 1990.

U. Church, L. K. Church, U. , and R. , Analysis of periodic and event-driven rescheduling policies in dynamic shops, International Journal of Computer Integrated Manufacturing, vol.1, issue.3, pp.153-163, 1992.
DOI : 10.1080/00207548508904739

. Clark, Product Development in the World Auto Industry, Brookings Papers on Economic Activity, vol.1987, issue.3, pp.729-771, 1987.
DOI : 10.2307/2534453

H. Clarkson, P. J. Clarkson, H. , and J. R. , 'Signposting', A Parameter-driven Task-based Model of the Design Process, Research in Engineering Design, vol.12, issue.1, pp.18-38, 2000.
DOI : 10.1007/s001630050021

. Cohen-'90-] and J. Cohen, Constraint logic programming languages, Communications of the ACM, vol.33, issue.7, pp.52-68, 1990.
DOI : 10.1145/79204.79209

A. Colmerauer-'90-]-colmerauer, An introduction to Prolog III, Communications of the ACM, vol.33, issue.7, pp.69-90, 1990.
DOI : 10.1145/79204.79210

Y. Colombani and K. G. Cooper, Constraint Programming: An Efficient and Practical Approach to Solving the Job-Shop Problem Naval ship production: a claim settled and a framework built, Proceedings 2nd International Conference on Principles and Practice of Constraint Programming, pp.1020-1056, 1980.

F. Darses and F. F. Darses, La Conception Collective: Une Approche de l'Ergonomie Cognitive, Octarès, ed. Conception et Coopération, pp.123-135, 2001.

W. Depuy, G. W. , W. , and G. E. , A simple and effective heuristic for the resource constrained project scheduling problem, International Journal of Production Research, vol.39, issue.14, pp.3275-3287, 2001.
DOI : 10.1080/00207540110060608

H. Eisner, P. Elkington, S. , and C. , Project and systems engineering management Managing Project Risks: A Case Study from the Utilities Sector, Proceedings of the twelfth national conference on Artificial intelligence, pp.49-57, 2002.

. Eppen, OR Practice???A Scenario Approach to Capacity Planning, Operations Research, vol.37, issue.4, pp.517-527, 1989.
DOI : 10.1287/opre.37.4.517

. Eppinger, A model-based method for organizing tasks in product developmen Innovation at the Speed of Information, Harvard Business Review, vol.79, issue.1, pp.1-13149, 1994.

. Escudero, Production planning via scenario modelling, Annals of Operations Research, vol.34, issue.6, pp.311-335, 1993.
DOI : 10.1007/BF02025089

. Esquirol, Propagation de contraintes en ordonnancement Information Management for concurrent engineering, Hermes. [EVERSHEIM European Journal of Operational Research, vol.100, pp.131-167253, 1997.

F. , J. W. Gao, H. Giard, V. Gino, F. Girard et al., Industrial Dynamics. M.I.T. Press, Cambridge Building robust schedules using temporal protection: an empirical study of constraint-based scheduling under machine failure uncertainty Gestion de projets, Managing Complex Technical Projects: a Systems Engineering Approach. Artech House. Complexity Measures in Decomposable Product Structures Collaborative engineering design spaces, 10th ISPE International Conference on Concurrent Engineering: Research and Applications CE'03 Modelling the engineering design system to improve performance Computers and Industrial Engineering, pp.9-1143, 1961.

E. Goldratt and D. Golenko-ginzburg-'88-]-golenko-ginzburg, Critical Chain On the Distribution of Activity Time in PERT The Journal of the Operational Research Society, pp.39767-771, 1988.

W. Goodwin, P. Goodwin, W. , and G. , Enhancing Strategy Evaluation in Scenario Planning: a Role for Decision Analysis, Journal of Management Studies, vol.38, issue.1, pp.1-16, 2001.
DOI : 10.1111/1467-6486.00225

. Grebici, Framework for Managing Preliminary Information in Collaborative Design Processes Apport de la Modélisation Cognitive à la Planification de Projets Experimental evaluation of the state-of-the-art heuristics for the resource-constrained projects scheduling problem, Proceedings of the 2nd International Conference on Product Lifecycle Management PLM05, pp.394-407, 1998.

E. J. Haug and . Herroelen, Concurrent Engineering: Tools and Technologies for Mechanical System Design. NATO ASI Series, Series F: Computer and Systems Sciences Resource-constrained project scheduling: A survey of recent developments, Computers & Operations Research, vol.108, issue.254, pp.279-302, 1993.

L. Herroelen, W. Herroelen, L. , and R. , On the merits and pitfalls of critical chain scheduling, Journal of Operations Management, vol.19, issue.5, pp.559-577, 2001.
DOI : 10.1016/S0272-6963(01)00054-7

L. Herroelen, W. Herroelen, L. , and R. , Project scheduling under uncertainty: Survey and research potentials, European Journal of Operational Research, vol.165, issue.2, pp.289-306, 2004.
DOI : 10.1016/j.ejor.2004.04.002

. Herroelen, Critical chain project scheduling: Do not oversimplify, Project Management Journal, vol.33, issue.4, pp.48-60, 2002.

. Kirkpatrick, Optimization by simulated annealing Boeing 757 / 767 Commonality Design Philosophy. SAE Technical Paper Series, n°810845. [KOLISCH and HARTMANN '99 Heuristic algorithms for solving the resource-constrained project scheduling problem: Classification and computational analysis An integrated survey of deterministic project scheduling, Project scheduling: Recent models, algorithms and applications, pp.147-178, 1981.

C. Kotsiopoulos, I. , C. , and N. , A project resource management method for a single project with multiple participating organisations, IEEE International Conference on Systems, Man and Cybernetics, 2002.
DOI : 10.1109/ICSMC.2002.1175565

V. Kumar-'92-]-kumar, Algorithms for constraint-satisfaction problems : A survey, pp.32-44, 1992.

F. Laborie and A. Larsson, Le concept de salle de décision collective et son application aux processus complexes EADS, Spécialité Informatique Engineering Know-Who: Why Social Connectedness Matters to Global Design Teams, Toulouse [LARSSON '05] al. '03] LASMIS, CRAN and LAP, 2003.

. Le and C. Le-pape, Three Mecanisms for Managing Resources Constraints in a Library for Constraint-Based Scheduling Critical chain project management improves project performance, Proceedings of the INRIA/IEEE Conference on Emerging Technologies and Factory Automation Project Management Journal, pp.39-51, 1995.

. Leon, ROBUSTNESS MEASURES AND ROBUST SCHEDULING FOR JOB SHOPS, IIE Transactions, vol.41, issue.5, pp.32-43, 1994.
DOI : 10.1080/00207548508904739

A. Li, J. Li, A. , U. Lizarralde, I. Insat et al., A Bayesian Optimization Algorithm for the Nurse Scheduling Problem Développement distribué d'un système complexe : Le concept de maturité de conception, Proceedings of 2003 Congress on Evolutionary Computation (CEC2003), 2003.

. Lizarralde, Adapting project management to complex systems development reality: a maturity and energy constraints based approach, Proceedings of the 16th CIRP International Design Seminar Project management for the development of complex systems: maturity and energy constraints based approach, 4ème Conférence Annuelle d'Ingénierie Système A Decision Support System to schedule design activities in aircraft industry Approche énergétique pour l'ordonnancement de tâches sous contraintes de temps et de ressources, 17th International Council on Systems Engineering (INCOSE 2007) International Conference on Industrial Engineering and Systems Management Ordonnancement de tâches sous contraintes : une approche énergétique. RAIRO-APII, pp.453-481, 1991.

. Lottaz, Constraint-based support for negotiation in collaborative design, Artificial Intelligence in Engineering, vol.14, issue.3, pp.261-280, 2000.
DOI : 10.1016/S0954-1810(00)00020-0

. Luo, Ant Colony Optimization for Resource-Constrained Project Scheduling with Generalized Precedence Relations Proceedings of the 15th IEEE International Conference on Tools with Artificial Intelligence table of contents, [LYNEIS Strategic management of complex projects: a case study using system dynamics, System Dynamics Review, vol.17, issue.3, pp.237-260, 2001.

. Macgregor, A case study on distributed, collaborative design: investigating communication and information flow Application of a technique for research end development program evaluation Modèles d'informations et méthodes pour aider à la prise de décision en management de projet, The Sixth International Conference on Computer Supported Cooperative Work in Design Intégration et Confrontation des Points de Vue dans le Cadre de la Conception en Ingénierie Concourante Conservatoire National des Arts et Métiers, [McCORD and EPPINGER '93 Managing the Integration Problem in Concurrent Engineering. MIT Sloan School of Management Working Paper, pp.646-669, 1959.

J. Meinadier, Le Metier d'Integration de Systemes, HERMES Science, Coll. Management at Informatique, 2002.

. Merkle, Ant colony optimization for resource-constrained project scheduling, IEEE Transactions on Evolutionary Computation, vol.6, issue.4, 2002.
DOI : 10.1109/TEVC.2002.802450

. Meyer, Managing project uncertainty: from variation to chaos, IEEE Engineering Management Review, vol.30, issue.3, pp.60-67, 2002.
DOI : 10.1109/EMR.2002.1032403

. Mingozzi, An Exact Algorithm for the Resource-Constrained Project Scheduling Problem Based on a New Mathematical Formulation, Management Science, vol.44, issue.5, pp.714-729, 1998.
DOI : 10.1287/mnsc.44.5.714

. Moder, Project Management with CPM, PERT and Precedence Diagramming. Van Nostrand Reinhold, Challenges in the Better, Faster, pp.0-02, 1983.

. Nozik, Project management under uncertainty with applications to new product development, Change Management and the New Industrial Revolution, IEMC '01 Proceedings Ithaca, NY [OZDAMAR and ULUSOY '95 Survey on the Resource-Constrained Project Scheduling Problem, pp.574-586, 1995.

J. Y. Papazoglou, C. Conférence, P. [. Micado, and . Pinson, Using tabu search for solving the resource-constrained project scheduling problem A Guide to the Project Management Body of Knowledge Concurrent Engineering Fundamentals : Integrated Product and Process Organization Product Development and Design for Manufacturing: A Collaborative Approach to Producibility and Reliability Modélisation et planification de projets complexes à contraintes de ressources: le modèle RAIH Understanding fire fighting in new product development, Proceedings of the 4. International Workshop on Project Management and Scheduling, Leuven [PMI '00] PMI, pp.285-300, 1994.

B. Rodden, T. , B. , G. S. Rogers, and E. M. , CSCW and Distributed Systems: The Problem of Control Diffusion of innovation, Proceedings of the Second European Conference on Computer-Supported Cooperative Work (ECSCW'91), pp.323-333, 1962.

S. , K. Saint-marc, L. /. Sti, and . Saint-marc, The Making of the Boeing 777 Toward a data maturity evaluation in collaborative design processes Scenario planning: A tool for strategic thinking, Proceedings of the 8th International Design Conference DESIGN04, pp.7051-7052, 1995.

S. Smith and D. V. Steward, Reactive Scheduling Systems The design structure matrix: A method for managing the design of complex systems, Intelligent Scheduling Systems, pp.155-1921, 1981.

. Stinson, Multiple Resource???Constrained Scheduling Using Branch and Bound, A I I E Transactions, vol.3, issue.4, pp.252-259, 1978.
DOI : 10.1080/05695557808975212

D. Talbot, Proximités et Dynamiques des Relations de Sous- Traitance: Le Cas d'EADS Airbus à Toulouse, Colloque de l'Association Française de Comptabilité A review of the contribution of Operational Research to Project Management, European Journal of Operational Research, vol.136, issue.1, pp.1-18, 2001.

L. Terwiesch, C. , L. , and C. H. Terwiesch, Exchanging Preliminary Information in Concurrent Engineering: Alternative Coordination Strategies, Proceedings of the 4th EIASM Conference on Product Development, [, pp.402-419, 1997.
DOI : 10.1287/orsc.13.4.402.2948

S. Thomas, P. R. Thomas, S. , and S. , A tabu search approach for the resource constrained project scheduling problem, Journal of Heuristics, vol.4, issue.2, pp.123-139, 1998.
DOI : 10.1023/A:1009673512884

K. Ulrich, The role of product architecture in the manufacturing firm, Proceedings of the 36th Annual Hawaii International Conference, pp.419-440, 1995.
DOI : 10.1016/0048-7333(94)00775-3

. Van-de and . Vonder, The use of buffers in project management: The trade-off between stability and makespan, International Journal of Production Economics, vol.97, issue.2, pp.227-240125, 2005.
DOI : 10.1016/j.ijpe.2004.08.004

F. Vidal, T. Vidal, F. , H. ). Florida, U. Vieira et al., Contingent durations in temporal CSP : from consistency to controllabilities, 4th Int Workshop on Temporal Representation and Reasoning (TIME97), Rescheduling Manufacturing Systems: A Framework of Strategies, Policies, and Methods Journal of Scheduling, pp.39-62, 1997.

. Wang, A Genetic Algorithm for Solving Resource-Constrained Project Scheduling Problem, International Conference on Engineering Design ICED, pp.1040-1053, 1981.
DOI : 10.1007/11539902_22

R. L. Winkler-'96-]-winkler, Uncertainty in probabilistic risk assessment Reliability Engineering and System Safety, pp.127-132, 1996.

. Winner, The Role of Concurrent Engineering in Weapons System Acquisition, 1988.

. Womack, The Machine that Changed the World A graphtheoretic decomposition of the job shop scheduling problem to achieve scheduling robustness, Operations Research, vol.27, issue.1, pp.113-124, 1991.

. Wynn, Modelling and simulating iterative development processes Applied Signposting: A Modeling Framework to Support Design Process Improvement, Proceedings of the 2006 ASME International Design Engineering Technical Conferences & Computers and Information In Engineering Conference, 2005.