Scheduling no-wait robotic cells with two and three machines, European Journal of Operational Research, vol.123, issue.2, pp.303-314, 2000. ,
DOI : 10.1016/S0377-2217(99)00258-1
A greedy algorithm to determine the number of transporters in a cyclic electroplating process, IIE Transactions, vol.20, issue.5, pp.347-355, 1996. ,
DOI : 10.1287/trsc.22.1.1
An operation insertion procedure in a multiressource schedule based on a dominance rules, 1997. ,
Ordonnancement de la production, 2001. ,
Résolution d'un probì eme d'ordonnancement avec la PLC, Journal Européen des Systèmes Automatisés, vol.30, pp.2-3, 1996. ,
Scheduling Computer an Manufacturing Processes, 1994. ,
ContributionàContributionà l'ordonnancement dynamique de lignes de traitement de surface, 1999. ,
On A Conjecture About Robotic Cells: New Simplified Proof For The Three-Machine Case, Journal of Information Systems and Operational Research -INFOR : Scheduling in Computer and Manufacturing Systems, pp.20-36, 1999. ,
DOI : 10.1080/03155986.1999.11732366
Cycles and permutations in robotic cells, Mathematical and Computer Modelling, vol.34, issue.5-6, pp.565-591, 2001. ,
DOI : 10.1016/S0895-7177(01)00084-X
A proof of the Lei and Wang claim, 1997. ,
Complexity of one-cycle robotic flowshops, Tech. rep., G.E.M.M.E, 2000. ,
Ordonnancement dans des cellules robotisées, 1999. ,
On-line scheduling in a surface treatment system, European Journal of Operational Research, vol.120, issue.2, pp.382-392, 2000. ,
DOI : 10.1016/S0377-2217(98)00376-2
URL : https://hal.archives-ouvertes.fr/inria-00073371
A polynomial algorithm for 2-degree cyclic robot scheduling, European Journal of Operational Research, vol.145, issue.1, pp.31-44, 2001. ,
DOI : 10.1016/S0377-2217(02)00175-3
Cyclic scheduling of a hoist with the time window constraint, 1994. ,
Cyclic hoist scheduling based on graph theory, Proceedings 1995 INRIA/IEEE Symposium on Emerging Technologies and Factory Automation Emerging Technologies and Factory Automation, pp.451-459, 1995. ,
Sequencing of Parts in Robotic Cells, International Journal of Flexible Manufacturing Systems, vol.9, issue.1, 1997. ,
DOI : 10.1023/A:1007930010707
Commande robuste d'ateliersàateliersà contraintes de temps de séjour : applicationàapplicationà la galvanoplastie, 1997. ,
Cyclic scheduling in robotic flowshops, Annals of Operations Research, vol.96, issue.1/4, pp.97-124, 2000. ,
DOI : 10.1023/A:1018995317468
Cyclic Scheduling of Identical Parts in a Robotic Cell, Operations Research, vol.45, issue.6, pp.952-965, 1997. ,
DOI : 10.1287/opre.45.6.952
Robotic flowshop scheduling is strongly NP-complete, 1997. ,
Cyclic scheduling in 3-machine robotic flow shops, Journal of Scheduling, vol.26, issue.1, pp.35-54, 1999. ,
DOI : 10.1002/(SICI)1099-1425(199901/02)2:1<35::AID-JOS15>3.0.CO;2-J
Coupling meta-heuristics and discrete event simulation models for the stochastic hoist scheduling problem, ACS', p.99, 1999. ,
Metaheuristics for the Stochastic Hoist Scheduling Problem (SHSP), International Journal of Production Research, vol.39, issue.15, pp.3419-3457, 2001. ,
DOI : 10.1080/00207549408956949
The Complexity of Flowshop and Jobshop Scheduling, Mathematics of Operations Research, vol.1, issue.2, pp.117-129, 1976. ,
DOI : 10.1287/moor.1.2.117
Crane scheduling with time windows in circuit board production lines, International Journal of Production Research, vol.28, issue.5, pp.1187-1189, 1995. ,
DOI : 10.1142/S0960313192000169
Sequencing a One State-Variable Machine: A Solvable Case of the Traveling Salesman Problem, Operations Research, vol.12, issue.5, pp.665-679, 1964. ,
DOI : 10.1287/opre.12.5.655
Genetic Algorithm in Search, 1989. ,
Hoist scheduling problem : Modèle objets. Rapport interne, Laboratoire d'informatique (LIMOS), 1997. ,
The relationship between the physical layout of the work stations and the productivity of a saturated single-hoist production line, International Journal of Production Research, vol.35, issue.8, pp.2189-2211, 1997. ,
DOI : 10.1080/002075497194804
Scheduling in robotic cells: Complexity and steady state analysis, European Journal of Operational Research, vol.109, issue.1, 1995. ,
DOI : 10.1016/S0377-2217(96)00333-5
A Survey of Machine Scheduling Problems with Blocking and No-Wait in Process, Operations Research, vol.44, issue.3, pp.44-510, 1996. ,
DOI : 10.1287/opre.44.3.510
Ordonnancement cyclique d'un robot sur une ligne de galvanoplastie : modèles et algorithmes, 1993. ,
Adaptation in Natural and Artificial System. The University of, 1975. ,
Discussion : Sequencing n jobs on two machines with arbitrary time lags, Management Science, vol.5, pp.293-298, 1959. ,
Ordonnancement d'une chaine de galvanoplastie, ENSGI-INPG), 1999. ,
Scheduling in Robotic Cells: Heuristics and Cell Design, Operations Research, vol.47, issue.6, pp.821-835, 1999. ,
DOI : 10.1287/opre.47.6.821
A 3/2-approximation algorithm for two-machine flow-shop sequencing subject to release dates, Discrete Applied Mathematics, vol.114, issue.1-3, 2001. ,
DOI : 10.1016/S0166-218X(00)00374-7
A strongly polynomial algorithm for no-wait cyclic robotic flowshop scheduling, Operations Research Letters, vol.21, issue.4, pp.171-179, 1997. ,
DOI : 10.1016/S0167-6377(97)00036-9
Cyclic scheduling in a robotic production line, Journal of Scheduling, vol.2, issue.1, pp.23-41, 2002. ,
DOI : 10.1002/jos.92
Réseaux de Petri p-temporels : contributionàcontributionà l'´ etude des systèmessystèmesà systèmesàévénements discrets, 1997. ,
Une approche pour l'ordonnancement dynamique d'un atelier de traitement de surface, 1996. ,
Ordonnancement dynamique d'un atelier de traitement de surface avec cuves de capacité multiple, InDeuxì eme Congrés International Franco-Québécois de Génie Industriel (ALBI, 1997. ,
Determining the optimal starting times in a cyclic schedule with a given route, Computers & Operations Research, vol.20, issue.8, pp.807-816, 1993. ,
DOI : 10.1016/0305-0548(93)90102-O
A proof : the cyclic HSP is NP-complete, 1989. ,
The Minimum Common-Cycle Algorithm for Cyclic Scheduling of Two Material Handling Hoists with Time Window Constraints, Management Science, vol.37, issue.12, pp.1629-1639, 1991. ,
DOI : 10.1287/mnsc.37.12.1629
A parametric critical path problem and an application for cyclic scheduling, Discrete Applied Mathematics, vol.87, issue.1-3, pp.149-158, 1998. ,
DOI : 10.1016/S0166-218X(98)00054-7
A genetic algorithm for a single hoist scheduling in the printed-circuit-board electroplating line, Computers & Industrial Engineering, vol.33, issue.3-4, pp.3-4, 1997. ,
DOI : 10.1016/S0360-8352(97)00254-4
Cyclic scheduling of a single hoist in extended electroplating lines: a comprehensive integer programming solution, IIE Transactions, vol.34, issue.10, pp.905-914, 2002. ,
DOI : 10.1080/09537289308919454
Ordonnancement de la production, 2000. ,
A PRACTICAL ALGORITHM FOR CYCLIC HOIST SCHEDULING IN A PCB MANUFACTURING FACILITY, Journal of Electronics Manufacturing, vol.08, issue.03n04, pp.3-4, 1998. ,
DOI : 10.1142/S0960313198000185
Three tank hoist scheduling problem with unbounded or zero-width processing windows, 8th International Workshop on Project Management and Scheduling -PMS EURO, pp.253-256, 2002. ,
URL : https://hal.archives-ouvertes.fr/hal-00259524
Balanced hoist scheduling problem with unbounded or zero-width processing windows, Journal Europ??en des Syst??mes Automatis??s, vol.37, issue.3, 2003. ,
DOI : 10.3166/jesa.37.391-404
URL : https://hal.archives-ouvertes.fr/hal-00144106
Flowshop robotisérobotiséà quatre machines sans attente, 4` eme Conférence Francophone de Modélisation et de Simulation (MOSIM) MOSIM, pp.542-545, 2003. ,
Optimal cycles for the robotic balanced no-wait flow shop, International Conference of Industrial Engineering and Production Management -IEPM'03, 2003. ,
URL : https://hal.archives-ouvertes.fr/hal-00259546
Etat de l'art : Ordonnancement de robots de manutention en galvanoplastie, APII, vol.28, issue.1, pp.7-35, 1994. ,
Constraint-based model for the cyclic multi-hoists scheduling problem, Production Planning & Control, vol.11, issue.3, pp.244-257, 2000. ,
DOI : 10.1080/095372800232216
Mathematical programming solution of a hoist scheduling problem, AIIE Transactions, pp.219-225, 1976. ,
Scheduling Theory, Algorithms and Systems, 1995. ,
Analysis of Heuristics for Two-Machine Flow-Shop Sequencing Subject to Release Dates, Mathematics of Operations Research, vol.10, issue.4, pp.576-584, 1985. ,
DOI : 10.1287/moor.10.4.576
Méthodes de pilotage des systèmes de production, 2002. ,
On the Flow-Shop Sequencing Problem with No Wait in Process, Operational Research Quarterly (1970-1977), vol.23, issue.3, pp.323-331, 1972. ,
DOI : 10.2307/3007887
The Three-Machine No-Wait Flow Shop is NP-Complete, Journal of the ACM, vol.31, issue.2, pp.336-345, 1984. ,
DOI : 10.1145/62.65
Sequencing of parts and robot moves in a robotic cell, International Journal of Flexible Manufacturing Systems, vol.29, issue.4, pp.331-358, 1992. ,
DOI : 10.1007/BF01324886
Hoist scheduling for a PCB Electroplating Facility. Program in operation research, 1985. ,
Hoist Scheduling For A PCB Electroplating Facility, IIE Transactions, vol.28, issue.2, pp.157-167, 1988. ,
DOI : 10.1080/07408178808966165
An algorithm for scheduling a chemical processing tank line, Production Planning & Control, vol.4, issue.4, pp.277-284, 1997. ,
DOI : 10.1080/09537289308919454
Lot streaming and scheduling multiple products in two-machine no-wait flowshops, IIE Transactions, vol.25, issue.8, pp.695-707, 1999. ,
DOI : 10.1287/opre.45.4.584
Vers un pilotage propre des lignes de traitement de surface, 4` eme Conférence Francophone de Modélisation et de Simulation (MOSIM), 2003. ,
Extension du hoist scheduling problem cyclique Résolution basée sur un traitement des contraintes disjonctives en programmation logique avec contraintes, 1996. ,
Resolution Of The Cyclic Multi-Hoists Scheduling Problem With Overlapping Partitions, INFOR: Information Systems and Operational Research, vol.35, issue.4, 1997. ,
DOI : 10.1080/03155986.1997.11732338
A cyclic approach for the multi-product hoist scheduling problem, 7th International Workshop on Project Management and Scheduling -PMS ,
Trace-driven knowledge acquisition (TDKA) for rule-based real time scheduling systems, Journal of Intelligent Manufacturing, vol.19, issue.4, pp.217-229, 1988. ,
DOI : 10.1007/BF01471188
An algorithm for hoist scheduling problems, International Journal of Production Research, vol.13, issue.3, pp.501-516, 1994. ,
DOI : 10.1080/00207549108948086
Crane scheduling in a flexible electroplating line: a tolerance-based approach, Journal of Electronics Manufacturing, vol.02, issue.04, pp.137-144, 1992. ,
DOI : 10.1142/S0960313192000169