B. Agard, ContributionàContribution`Contributionà une méthodologie de conception de produitsàproduits`produitsà forte diversité, Thèse de Doctorat, INPG, 2002.

B. Agard and M. Tollenaere, Design of Wire Harnesses for Mass Customization, 4th international conference on integrated design and manufacturing in technical engineering, 2002.
DOI : 10.1007/978-94-017-0161-7_6

. Souaad-ait and . Hellal, Composition d'un stock de produits semi-finis, 2003.

K. J. Arrow, Statistics and Economic Policy, Econometrica, vol.25, issue.4, pp.523-531, 1957.
DOI : 10.2307/1905381

K. J. Arrow, T. Harris, and J. Marschak, Optimal Inventory Policy, Econometrica, vol.20, issue.1, pp.250-272, 1951.
DOI : 10.2307/1907830

G. Ronald, D. W. Askin, and . Dawson, Maximizing customer satisfaction by optimal specification of engineering characteristics, IIE Transactions, vol.32, pp.9-20, 2000.

Y. Aviv and A. Federgruen, The Benefits of Design for Postponement, volume 17 of International series in operations research and management science, chapitre 19 Kluwer's international series, pp.553-584, 1999.

Y. Aviv and A. Federgruen, Capacitated Multi-Item Inventory Systems with Random and Seasonally Fluctuating Demands: Implications for Postponement Strategies, Management Science, vol.47, issue.4, pp.512-531, 2001.
DOI : 10.1287/mnsc.47.4.512.9829

K. R. Baker, M. J. Magazine, L. W. Henry, and . Nuttle, The Effect of Commonality on Safety Stock in a Simple Inventory Model, Management Science, vol.32, issue.8, pp.982-988, 1986.
DOI : 10.1287/mnsc.32.8.982

C. Baldwin and K. Clark, Design Rules: The Power of Modularity, 2000.

Y. Carliss, K. B. Baldwin, and . Clark, Managing in an age of modularity, Harvard business review, pp.84-93, 1997.

A. R. Barron, Entropy and the Central Limit Theorem, The Annals of Probability, vol.14, issue.1, pp.336-342, 1986.
DOI : 10.1214/aop/1176992632

F. , B. Abdelaziz, and H. Masri, Stochastic programming with linear partial information on probability distribution, European Journal of Operational Research

A. Hazem-ben, La complexité au montage véhicule : De la productionàproduction`productionà la conception, Revue française de Gestion industrielle, vol.19, issue.3, pp.77-94, 2000.

O. Briant, Etude théorique et numérique duprobì eme de la gestion de la diversité, Recherche opérationnelle combinatoire et optimisation, 2000.

O. Briant and D. Naddef, The Optimal Diversity Management Problem, Operations Research, vol.52, issue.4
DOI : 10.1287/opre.1040.0108

URL : https://hal.archives-ouvertes.fr/hal-00363827

K. Amiya, N. Chakravarty, and . Balakrishnan, Achieving product variety through optimal choice of module variations, IIE Transactions, vol.33, pp.587-598, 2001.

F. Chapeau-blondeau and A. Monir, Numerical evaluation of the Lambert W function and application to generation of generalized Gaussian noise with exponent 1/2, IEEE Transactions on Signal Processing, vol.50, issue.9, pp.2160-2165, 2002.
DOI : 10.1109/TSP.2002.801912

URL : https://hal.archives-ouvertes.fr/hal-00845481

B. Ciavaldini and J. Loubet, La diversité dans l'industrie automobile française: Hésitations et enjeux, Gérer et comprendre, issue.41, pp.4-19, 1995.

D. A. Collier, Aggregate Safety Stock Levels and Component Part Commonality, Management Science, vol.28, issue.11, pp.1296-1303, 1982.
DOI : 10.1287/mnsc.28.11.1296

D. Crié and C. Benavent, Les produits fidélisants dans la relation client-forunisseur, identification, effets et implications, 17 ? Congrès Association Française de Marketing, 2001.

C. Da and C. , Gestion des modifications, 2001.

F. David, C. Caux, and H. Pierreval, Mise en oeuvre de la différenciation retardée dans la production de l'aluminium : standardisation de plaques, 4 ? Conférence Francophone de Modélisation et Simulation, MOSIM'03, 2003.

B. Denton, D. Gupta, M. Degroote, and K. Jawahir, Managing Increasing Product Variety at Integrated Steel Mills, Interfaces, vol.33, issue.2, 2002.
DOI : 10.1287/inte.33.2.41.16373

K. Sebastian and . Fixson, The multiple faces of modularity -a literature analysis of a product concept for assembled hardware products. working paper MI, 2003.

M. R. Garey and D. S. Johnson, Computers and Intractability: A guide to the theory of NP-completeness, W. H. Freeman and Company, 1979.

S. Gavirneni, Value of Information Sharing and Comparison with Delayed Differentiation, volume 17 of International series in operations research and management science Kluwer's international series, pp.441-466, 1999.

S. Gavirneni, R. Kapuscinski, and . Et-sridhar-tayur, Value of Information in Capacitated Supply Chains, Management Science, vol.45, issue.1, pp.16-24, 1999.
DOI : 10.1287/mnsc.45.1.16

Y. Gerchak and M. Henig, An inventory model with component commonality, Operations Research Letters, vol.5, issue.3, pp.157-160, 1986.
DOI : 10.1016/0167-6377(86)90089-1

Y. Gerchak, M. Magazine, and B. Gamble, Component Commonality with Service Level Requirements, Management Science, vol.34, issue.6, pp.753-760, 1988.
DOI : 10.1287/mnsc.34.6.753

V. Giard, Analysé economique de la standardisation des produits, 1999.

V. Giard, Gestion de la production et des flux, Economica, 2003.

V. Giard and P. Lagroue, Quel contrôle pour les systèmes productifs travaillantàtravaillant`travaillantà la commande et devant faire facè a une demande fortement aléatoire ?, Technical Report, vol.3, 2000.

V. Giard and G. Mendy, Le passage de l'approvisionnement synchronèsynchronè a la production synchrone dans la cha??necha??ne logistique, Annales du LAMSADE, pp.235-254, 2004.

H. Girlich and A. Chikan, The origins of dynamic inventory modelling under uncertainty, International Journal of Production Economics, vol.71, issue.1-3, pp.351-363, 2001.
DOI : 10.1016/S0925-5273(00)00131-6

J. Gleick and . Chaos, The Viking press, 1987.

J. H. Hammond, Barilla spa (a) Case (Field) 9-694-046, 1994.

D. S. Hochbaum, Approximation algorithms for NP-hard problems. PWS publishing company, 1997.

J. Hsuan, Modularization in black-box design: implication for supplierbuyer partnerships, DRUID (Danish research unit for industrial dynamics) winter conference, 1998.

J. Hsuan, Modularization in new product development: a mathemaical modeling approach, DRUID(Danish research unit for industrial dynamics) summer conference, 1999.

J. Hsuan, Modularity, outsourcing, and inter-firming learning, DRUID (Danish research unit for industrial dynamics) summer conference, 2000.

C. Huang and A. Kusiak, Modularity in design of products and systems, IEEE Transactions on Systems, Man, and Cybernetics - Part A: Systems and Humans, vol.28, issue.1, pp.66-77, 1998.
DOI : 10.1109/3468.650323

E. T. Jaynes, Information theory and statistical mechanics. The physical review, pp.620-630, 1957.

E. T. Jaynes, Information theory and statistical mechanics ii. The physical review, pp.171-190, 1957.

D. Johnson, Approximation algorithms for combinatorial problems, Proceedings of the fifth annual ACM symposium on Theory of computing , STOC '73, pp.256-278, 1974.
DOI : 10.1145/800125.804034

I. Kocher and P. Rolland, Quand les structures dessinent les produits, Gérer et comprendre, vol.39, pp.38-48, 1995.

A. Kusiak, Engineering Design: Products, Processes, and Systems, chapitre 12, Modular products, p.259, 1999.

C. Lambey-checchin, Le sacrifice perçu: Le cas d'acheteurs de voiture neuve, 2 ? congrès International Des Tendances Du Marketing En Europe, 2002.

L. Hau, C. S. Lee, and . Tang, Modelling the costs and benefits of delayed product differentiation, Management science, vol.43, issue.1, pp.40-53, 1997.

L. Hau, S. Lee, and . Whang, Information sharing in a supply chain, International Journal of Technology Management, vol.20, issue.34, pp.373-387, 2000.

J. Paul-macduffie, K. Sethuraman, and M. L. Fisher, Product Variety and Manufacturing Performance: Evidence from the International Automotive Assembly Plant Study, Management Science, vol.42, issue.3, pp.350-369, 1996.
DOI : 10.1287/mnsc.42.3.350

M. Martin and K. Ishii, Design for Variety, ASME Design Engineering Technical Conferences, DETC, 1997.
DOI : 10.1007/978-1-4615-5579-7_6

J. Mclain, W. Maxwell, J. Muckstadt, J. Thomas, and E. Weiss, Note???Comment on ???Aggregate Safety Stock Levels and Component Part Commonality???, Management Science, vol.30, issue.6, pp.772-773, 1984.
DOI : 10.1287/mnsc.30.6.772

K. Naughton, E. Thornton, K. Kerwin, and H. Dawley, Can Honda build a world car? Business week, 1997.

S. Novak and S. D. Eppinger, Sourcing By Design: Product Complexity and the Supply Chain, Management Science, vol.47, issue.1, pp.189-204, 2001.
DOI : 10.1287/mnsc.47.1.189.10662

W. David and . Pentico, The assortment problem with probabilistic demand, Management Science, vol.21, issue.3, pp.286-290, 1974.

B. Joseph and I. Pine, Mass customization: the new frontier in business competition . Harvard business school press, 1993.

J. Pointet, Cohérence de la stratégie produit Renault, Gérer et comprendre, issue.48, pp.43-55, 1997.

A. Rivì-ere, C. Da-cunha, M. T. Gogu, G. Coutellier, D. Chedmail et al., Recent Advances in Integrated Design and Manufacturing in Mechanical Engineering, chapitre Performances in Engineering Change Management, 2003.

. Arnaudrivì-ere, Méthodologie SGDT dans la mise en configuration aéronautique, Thèse de Doctorat, INPG, 2004.

T. L. Shaftel and G. L. Thompson, The continuous multiple-modular design problem . naval research logistics quarterly, pp.199-215, 1983.

C. E. Shannon, A mathematical theory of communication. The Bell system technical journal, pp.379-423623, 1948.

B. P. Shapiro, Making money through marketing, Harvard Business review, pp.135-142, 1979.

C. N. Smart, Sweet spot, the relationship between forecasting and optimal stocking levels, APICS journal, pp.55-58, 2004.

K. Martin and . Starr, Modular production -a new concept Harvard business review, pp.131-142, 1965.

J. Swaminathan and S. Tayur, Managing Broader Product Lines through Delayed Differentiation Using Vanilla Boxes, Management Science, vol.44, issue.12-part-2, pp.161-172, 1998.
DOI : 10.1287/mnsc.44.12.S161

URL : http://citeseerx.ist.psu.edu/viewdoc/summary?doi=10.1.1.53.4420

M. Jayashankar, . Swaminathan, R. Shridar, and . Tayur, Managing design of assembly sequences for product lines that delay product differentiation, IIE Transactions, issue.11, pp.311015-1026, 1999.

M. Jayashankar, . Swaminathan, R. Sridhar, and . Tayur, Stochastic Programming Models for Managing Product Variety, volume 17 of International series in operations research and management science, chapitre 19 Kluwer's international series, pp.585-624, 1999.

U. Thonemann and M. Brandeau, Optimal Commonality in Component Design, Operations Research, vol.48, issue.1, pp.1-19, 2000.
DOI : 10.1287/opre.48.1.1.12445

K. T. Ulrich, The role of product architecture in the manufacturing firm, Research Policy, vol.24, issue.3, pp.419-440, 1995.
DOI : 10.1016/0048-7333(94)00775-3

M. L. Wolfson, Selecting the Best Lengths to Stock, Operations Research, vol.13, issue.4, pp.570-585, 1965.
DOI : 10.1287/opre.13.4.570

W. Zinn, Should you assemble products before an order is received?, Business Horizons, vol.33, issue.2, pp.70-73, 1990.
DOI : 10.1016/0007-6813(90)90013-2